Differences between revisions 1 and 2
Revision 1 as of 2021-11-26 06:50:31
Size: 4271
Comment:
Revision 2 as of 2021-11-26 07:01:18
Size: 4422
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
 * 2021/11/19(Fri) 17:00-  * 2021/11/26(Fri) 17:00-
Line 9: Line 9:
  * 第2回新学術「地下宇宙」若手研究会 [[https://www.lowbg.org/ugap/ws/yr2021/]]   * 第2回新学術「地下宇宙」若手研究会 [[https://www.lowbg.org/ugap/ws/yr2021/ | url]]
Line 11: Line 11:
   * Registration : 11月12日(金)まで (終了)
Line 14: Line 13:
  * Supernovae Workshop [[https://www-conf.kek.jp/SNeGWv2021/]]   * Supernovae Workshop [[https://www-conf.kek.jp/SNeGWv2021/ | url]]
Line 20: Line 19:
   * Registration deadline : [[https://forms.office.com/r/iq61SPE6MF | url]]
Line 29: Line 29:
    * 粂(non-linear ICA)、小林(O3GK ICA)、鈴木(NN)?     * 横澤(Overview)、粂(non-linear ICA)、小林(O3GK ICA)、鈴木(NN)?
Line 45: Line 45:
Line 49: Line 48:
  * Finalize the hardware part
   * Temperature monitor check
   * Heatlink setting
   * Oplev light path
   * WAB position check
Line 50: Line 54:
  * Baffle PD check
Line 67: Line 70:
   * SR3 suspension commissioning    * SR's suspension commissioning
Line 90: Line 93:
  * Table PEM setting
   * IMC refl/trans table
  * New oplev noise budget
   * IX
   * Main work : December
   * Prepare to set the PEMs
    * Electrical box
    * Accelerometers
    * Seismometer (Move from BS)
    * Magnetometer
    * Microphone
    * PEM injection
Line 94: Line 105:
   * Cryocon    * PSL room with Cryocon
Line 96: Line 107:
   * Pt 100 by ondotori
Line 110: Line 120:
   * RF monitor    * RF monitor with mokugo
Line 122: Line 132:
  * Data Quality Report [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/DET/LVAlert|LVAlert test is on-going]]   * Data Quality Report
Line 137: Line 147:
  * Circuit for the Schumann resonance [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=13447|JGW-G2113447-v2]]   * Circuit for the Schumann resonance

Weekly PEM meeting

Meeting and Conference issue

  • 第2回新学術「地下宇宙」若手研究会 url

    • 2021年11月25日(木)~26日(金) @ 神戸大
    • 鷲見、鈴木
  • Supernovae Workshop url

    • 12/1,2 @ Online
    • Registration deadline: November 28, 2021
  • KAGRA F2F
    • 12/20,21 @ Online
    • Registration deadline : url

  • 新学術領域「地下宇宙」第8回超新星ニュートリノ研究会 http://www.lowbg.org/ugap/ws/sn2022/index.html

    • 2022年1月6日(木)、7日(金) @ 早稲田+オンライン
    • 講演申込締切:2021年12月6日(月)
    • 参加申込締切:2022年 1月 5日(水)
  • JPS meeting URL

    • 2022年3月15日(火)~3月19日(土)@ 岡山大学
      • 登壇登録 : 11月16日 ~ 12月2日
      • 横澤(Overview)、粂(non-linear ICA)、小林(O3GK ICA)、鈴木(NN)?
  • Other meetings url

  • GWPAW Hannover, Germany, Dec 14th-17th, 2021

If you have some presentation about PEM related, please contact to me.

Business travel

  • Depending on the situation of COVID-19
    • To Kamioka
      • no plan
    • From Kamioka
      • 11/24(移動), 25, 26 : Washimi (to Kobe U)
      • 12/2 : Washimi (to Shonan Institute of Technology)

General issue

  • Procedure toward X arm commissioning
    • Finalize the hardware part
      • Temperature monitor check
      • Heatlink setting
      • Oplev light path
      • WAB position check
    • Green cavity
    • Mirror height measurement
      • BS/SR height adjustment
      • Summary of height measurement
    • IO commissioning
      • IMC ASC
      • Power budget
    • IR alignment
      • Beam profile measurement
    • Mid size baffle installation
    • Y arm commissioning
      • SR's suspension commissioning
      • Green Y alignment
      • Oplev preparation
  • Schedule
  • PEM schedule
    • Re-installation of PEMs toward O4

Jurnal paper issue

Details are here!

  • PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) JGW-P2113405

    • Specialist review (Dead line : Nov. 15)
  • Acoustic reverberation time paper (Washimi+)
    • Washimi will write in the New Year holidays
  • ICA for E-run/O3GK (Kume, Yokoyama)
  • Portable PEMs (Yokozawa+) <<Start writing>>

Preparation for O4

  • New oplev noise budget
    • IX
    • Main work : December
    • Prepare to set the PEMs
      • Electrical box
      • Accelerometers
      • Seismometer (Move from BS)
      • Magnetometer
      • Microphone
      • PEM injection
  • New PEM
    • PSL room with Cryocon
    • Ondotori
    • TEAC710
    • 電界計 (EFM; electric field mill)
    • ACO power supply with low frequency
  • Magnetmeters for the Schumann resonance
    • Discussing with technicians (AEL, FCL)
  • PEM injection
    • Low-frequency sound injectorklog16829

    • Acoustic injection at X/Y-end
    • Magnetic injection
  • After O4
    • RF monitor with mokugo
    • Tiltmeter
    • RI detector
    • Newtonian noise
  • Discussion with DET members
    • Daily summary page PEM

Progress report

  • Yuzurihara
    • Pastavi
    • Data Quality Report
  • Suzuki
    • Water simulation
  • Hoshino
    • Seismic motion analysis
  • Investigation of ICA analysis
    • Progress
  • Nishizawa
    • Magnetic field analysis
  • Washimi
    • Circuit for the Schumann resonance
  • Yokozawa
  • Seismic motion analysis
    • O3GK
    • Microseismic
    • Long term

Place for memo

KAGRA/Subgroups/PEM/Meeting/211126/Agenda (last edited 2021-11-26 07:01:18 by TakaakiYokozawa)