⇤ ← Revision 1 as of 2021-11-26 06:50:31
Size: 4271
Comment:
|
← Revision 2 as of 2021-11-26 07:01:18 ⇥
Size: 4422
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
* 2021/11/19(Fri) 17:00- | * 2021/11/26(Fri) 17:00- |
Line 9: | Line 9: |
* 第2回新学術「地下宇宙」若手研究会 [[https://www.lowbg.org/ugap/ws/yr2021/]] | * 第2回新学術「地下宇宙」若手研究会 [[https://www.lowbg.org/ugap/ws/yr2021/ | url]] |
Line 11: | Line 11: |
* Registration : 11月12日(金)まで (終了) | |
Line 14: | Line 13: |
* Supernovae Workshop [[https://www-conf.kek.jp/SNeGWv2021/]] | * Supernovae Workshop [[https://www-conf.kek.jp/SNeGWv2021/ | url]] |
Line 20: | Line 19: |
* Registration deadline : [[https://forms.office.com/r/iq61SPE6MF | url]] | |
Line 29: | Line 29: |
* 粂(non-linear ICA)、小林(O3GK ICA)、鈴木(NN)? | * 横澤(Overview)、粂(non-linear ICA)、小林(O3GK ICA)、鈴木(NN)? |
Line 45: | Line 45: |
Line 49: | Line 48: |
* Finalize the hardware part * Temperature monitor check * Heatlink setting * Oplev light path * WAB position check |
|
Line 50: | Line 54: |
* Baffle PD check | |
Line 67: | Line 70: |
* SR3 suspension commissioning | * SR's suspension commissioning |
Line 90: | Line 93: |
* Table PEM setting * IMC refl/trans table |
* New oplev noise budget * IX * Main work : December * Prepare to set the PEMs * Electrical box * Accelerometers * Seismometer (Move from BS) * Magnetometer * Microphone * PEM injection |
Line 94: | Line 105: |
* Cryocon | * PSL room with Cryocon |
Line 96: | Line 107: |
* Pt 100 by ondotori | |
Line 110: | Line 120: |
* RF monitor | * RF monitor with mokugo |
Line 122: | Line 132: |
* Data Quality Report [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/DET/LVAlert|LVAlert test is on-going]] | * Data Quality Report |
Line 137: | Line 147: |
* Circuit for the Schumann resonance [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=13447|JGW-G2113447-v2]] | * Circuit for the Schumann resonance |
Weekly PEM meeting
- 2021/11/26(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
Meeting and Conference issue
第2回新学術「地下宇宙」若手研究会 url
- 2021年11月25日(木)~26日(金) @ 神戸大
- 鷲見、鈴木
Supernovae Workshop url
- 12/1,2 @ Online
- Registration deadline: November 28, 2021
- KAGRA F2F
- 12/20,21 @ Online
Registration deadline : url
新学術領域「地下宇宙」第8回超新星ニュートリノ研究会 http://www.lowbg.org/ugap/ws/sn2022/index.html
- 2022年1月6日(木)、7日(金) @ 早稲田+オンライン
- 講演申込締切:2021年12月6日(月)
- 参加申込締切:2022年 1月 5日(水)
JPS meeting URL
- 2022年3月15日(火)~3月19日(土)@ 岡山大学
- 登壇登録 : 11月16日 ~ 12月2日
- 横澤(Overview)、粂(non-linear ICA)、小林(O3GK ICA)、鈴木(NN)?
- 2022年3月15日(火)~3月19日(土)@ 岡山大学
Other meetings url
- GWPAW Hannover, Germany, Dec 14th-17th, 2021
If you have some presentation about PEM related, please contact to me.
Business travel
- Depending on the situation of COVID-19
- To Kamioka
- no plan
- From Kamioka
- 11/24(移動), 25, 26 : Washimi (to Kobe U)
- 12/2 : Washimi (to Shonan Institute of Technology)
- To Kamioka
General issue
- Procedure toward X arm commissioning
- Finalize the hardware part
- Temperature monitor check
- Heatlink setting
- Oplev light path
- WAB position check
- Green cavity
- Mirror height measurement
- BS/SR height adjustment
- Summary of height measurement
- IO commissioning
- IMC ASC
- Power budget
- IR alignment
- Beam profile measurement
- Mid size baffle installation
- Y arm commissioning
- SR's suspension commissioning
- Green Y alignment
- Oplev preparation
- Finalize the hardware part
- Schedule
- PEM schedule
- Re-installation of PEMs toward O4
Jurnal paper issue
PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) JGW-P2113405
- Specialist review (Dead line : Nov. 15)
- Acoustic reverberation time paper (Washimi+)
- Washimi will write in the New Year holidays
- ICA for E-run/O3GK (Kume, Yokoyama)
Portable PEMs (Yokozawa+) <<Start writing>>
Preparation for O4
- New oplev noise budget
- IX
- Main work : December
- Prepare to set the PEMs
- Electrical box
- Accelerometers
- Seismometer (Move from BS)
- Magnetometer
- Microphone
- PEM injection
- New PEM
- PSL room with Cryocon
- Ondotori
- TEAC710
- 電界計 (EFM; electric field mill)
- ACO power supply with low frequency
- Magnetmeters for the Schumann resonance
- Discussing with technicians (AEL, FCL)
- PEM injection
Low-frequency sound injectorklog16829
- Acoustic injection at X/Y-end
- Magnetic injection
- After O4
- RF monitor with mokugo
- Tiltmeter
- RI detector
- Newtonian noise
- Discussion with DET members
- Daily summary page PEM
Progress report
- Yuzurihara
- Pastavi
- Data Quality Report
- Suzuki
- Water simulation
- Hoshino
- Seismic motion analysis
- Investigation of ICA analysis
- Progress
- Nishizawa
- Magnetic field analysis
- Washimi
- Circuit for the Schumann resonance
- Yokozawa
- Seismic motion analysis
- O3GK
- Microseismic
- Long term