Line 2: Line 2:
 * 2022/02/04(Fri) 17:00-  * 2022/02/18(Fri) 17:00-
Line 14: Line 14:
    * 2月中旬に現地開催判断?     * オンライン開催(2/19情報[[https://www.jps.or.jp/activities/meetings/annual/annual-index.php|url]])
Line 17: Line 17:
  * LVK meeting [[https://wiki.ligo.org/LSC/Meeting/LVKMeetingMarch2022|URL]]
   * Online
   * Mar 14-17
   * Registration [[https://forms.gle/eGqk6F2teQYfszXy5|URL]]
  * JpGU 2022 (日本地球惑星科学連合2022年大会)
    * 2022年5月22日(日)~6月3日(金) @ 幕張メッセ
    * 緊急セッション「気象津波の発生を伴ったトンガ海底火山噴火」[[https://www.jpgu.org/meeting_j2022/program.php#late-breaking_session]]
      * 緊急セッションの投稿開始は3月を予定しております.
Line 29: Line 37:
    * Washimi : to OCU (2/22)     * Washimi : to OCU (2/21~23)
    * Washimi : to KyotoU (2/28)
Line 38: Line 47:
  * Good alignment by ADS
Line 50: Line 60:
  * BS alignment
  * Green laser performance
Line 64: Line 76:
  * Tonga signal paper (Washimi+)
    * Writing
Line 65: Line 80:
    * Washimi will write in the New Year holidays     * Suspend
Line 67: Line 82:
  * ICA for E-run/O3GK (Kume, Yokoyama)   * ICA for E-run/O3GK (Kume, Kobayashi)
   * St
art writing
Line 75: Line 91:
    * Cabling plan Xend
* ACO power supply
    * Installed to XY end
* Cabling
* ACO power supply
Line 79: Line 96:
   * Light source??    * Light source
Line 117: Line 134:
  * Pastavi : No update   * Pastavi
    * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=19815|Pastavi update : Filling ending date automatically]]
Line 119: Line 137:
   * 1/25~27 [[https://wiki.ligo.org/DetChar/Jan2022DetCharNoiseSprint|DQR Hackathon]]
   * 1st day : basic lecture about DQR by Joe and Derek
   * 2nd day : started to develop concrete code for DQR tasks
   * 3rd day : (same as 2nd day) Yuzurihara contributed to develop the task for computing the inspiral range
   * [[https://git.ligo.org/detchar/dqrtasks|dqr-tasks git repo]]
Line 125: Line 138:
   * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=13721|slide for proposal]]
   * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=19618|Added the band limited RMS for magnetmeter, microphone, and accelerometer on PEM models]]
   * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=19778|Added PEM channels for Omicron trigger generation]]

Weekly PEM meeting

Meeting and Conference issue

  • 「素粒子と重力波」研究会 @ OCU
  • JPS meeting URL

    • 2022年3月15日(火)~3月19日(土)@ 岡山大学 program

      • オンライン開催(2/19情報url)

      • 横澤(Overview)、鈴木(NN)、粂(non-linear ICA)、小林(O3GK ICA)
      • 鷲見(Noise budget, JGW-G2213473)

  • LVK meeting URL

    • Online
    • Mar 14-17
    • Registration URL

  • JpGU 2022 (日本地球惑星科学連合2022年大会)
  • Other meetings url

If you have some presentation about PEM related, please contact to me.

Business travel

  • Depending on the situation of COVID-19
    • To Kamioka
      • No plan
    • From Kamioka
      • Washimi : to OCU (2/21~23)
      • Washimi : to KyotoU (2/28)

General issue

  • Tonga volcano
  • Procedure toward X arm commissioning
    • IR cavity lock succeeded
    • Good alignment by ADS
  • IO commissioning
    • IMC ASC
  • Mid size baffle installation
    • After IR alignment
  • Y arm commissioning
    • Green Y alignment SR3->ETMY->POS table

    • ETMY alignment done
    • PCal finalize
    • Oplev preparation : ongoing
    • BS alignment
    • Green laser performance
  • Schedule
  • PEM schedule
    • Re-installation of PEMs toward O4

Jurnal paper issue

Details are here!

  • PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) JGW-P2113405

    • Collaborator circulation (~1/7)
  • Invited review paper (Washimi+) JGW-P2113549

  • Tonga signal paper (Washimi+)
    • Writing
  • Acoustic reverberation time paper (Washimi+)
    • Suspend
  • ICA for E-run/O3GK (Kume, Kobayashi)
    • Start writing
  • Portable PEMs (Yokozawa+) <<Start writing>>

Preparation for O4

  • PEM installation check
    • Electrical box
      • Installed to XY end
      • Cabling
      • ACO power supply
  • MN oplev noise investigation
    • Light source
  • New oplev noise budget
    • EX
    • Main work : Wind, vibration and sound injection FFU on/off
    • Prepare to set the PEMs
      • Accelerometers
      • Seismometer (Move from BS)
      • Magnetometer
      • Microphone
      • PEM injection
  • New PEM
    • PSL room with Cryocon
    • TEAC710
    • 電界計 (EFM; electric field mill)
    • ACO power supply with low frequency
  • Magnetmeters for the Schumann resonance
    • Discussing with technicians (AEL, FCL)
  • PEM injection
    • Low-frequency sound injectorklog16829

    • Acoustic injection at X/Y-end
    • Magnetic injection
  • After O4
    • RF monitor with mokugo
    • Tiltmeter
    • RI detector
    • Newtonian noise
  • Discussion with DET members
    • Daily summary page PEM

Progress report

Place for memo

KAGRA/Subgroups/PEM/Meeting/220218/Agenda (last edited 2022-02-21 07:02:19 by TakaakiYokozawa)