⇤ ← Revision 1 as of 2022-03-11 10:14:32
Size: 4856
Comment:
|
← Revision 2 as of 2022-03-11 10:23:04 ⇥
Size: 4711
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
* 2022/03/04(Fri) 17:00- * Regular meeting |
* 2022/03/11(Fri) 17:00- * JPS practice focusing meeting |
Line 32: | Line 32: |
* Washimi : to KyotoU (2/28) | * No |
Line 36: | Line 36: |
* Tonga volcano * Uploading to KAGRA HP [[https://gwcenter.icrr.u-tokyo.ac.jp/tonga-20220115]] |
|
Line 41: | Line 38: |
* Oplev characterization | |
Line 43: | Line 39: |
* Lock loss study * PLL, signal mis-connection, control linear range * Time series check * TCam check |
|
Line 47: | Line 47: |
* Mid size baffle installation * After IR alignment |
|
Line 51: | Line 48: |
* Green Y alignment SR3->ETMY->POS table * ETMY alignment done * IY health check->ongoing * PCal finalize->ongoing |
* ITMY suspension : ongoing * PCal finalize : ongoing |
Line 127: | Line 122: |
==== Practice for JPS meeting ==== * Yokozawa (Just showed the slide) * Suzuki * Kobayashi * Kume (Just showed the slide) |
|
Line 131: | Line 133: |
* no update | |
Line 133: | Line 134: |
* no update | |
Line 135: | Line 135: |
* [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=13970|slide]] |
Weekly PEM meeting
- 2022/03/11(Fri) 17:00-
- JPS practice focusing meeting
Zoom2 : https://zoom.us/j/6676627462
Meeting and Conference issue
JPS meeting URL
2022年3月15日(火)~3月19日(土) program
オンライン開催(2/19情報url)
- 横澤(Overview)、鈴木(NN)、粂(non-linear ICA)、小林(O3GK ICA)
鷲見(Noise budget, JGW-G2213473)
LVK meeting URL
- Online
- Mar 14-17
Registration URL
- JpGU 2022 (日本地球惑星科学連合2022年大会)
- 2022年5月22日(日)~6月3日(金) @ 幕張メッセ
緊急セッション「気象津波の発生を伴ったトンガ海底火山噴火」https://www.jpgu.org/meeting_j2022/program.php#late-breaking_session
- 緊急セッションの投稿開始は3月を予定しております.
Other meetings url
If you have some presentation about PEM related, please contact to me.
Business travel
- Depending on the situation of COVID-19
- To Kamioka
- Kobayashi 3/8-3/12
- From Kamioka
- No
- To Kamioka
General issue
- Procedure toward X arm commissioning
- IR cavity lock succeeded
- TMSX commissioning
- Lock loss study
- PLL, signal mis-connection, control linear range
- Time series check
- TCam check
- IO commissioning
- IMC ASC
- Y arm commissioning
- ITMY suspension : ongoing
- PCal finalize : ongoing
- Oplev preparation : EY done
- BS alignment
- Green laser performance
- Schedule
- PEM schedule
- Re-installation of PEMs toward O4
Jurnal paper issue
PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) JGW-P2113405
- Collaborator circulation (~1/7)
Invited review paper (Washimi+) JGW-P2113549
- Tonga signal paper (Washimi+)
- Writing
- Acoustic reverberation time paper (Washimi+)
- Suspend
- ICA for E-run/O3GK (Kume, Kobayashi)
- Start writing
Portable PEMs (Yokozawa+) <<Start writing>>
Preparation for O4
- PEM installation check
- Electrical box
- Installed to XY end
- Cabling
- ACO power supply
- Electrical box
- MN oplev noise investigation
- Light source
- New oplev noise budget
- EX
- Main work : Wind, vibration and sound injection FFU on/off
- Prepare to set the PEMs
- Accelerometers
- Seismometer (Move from BS)
- Magnetometer
- Microphone
- PEM injection
- New PEM
- PSL room with Cryocon
- TEAC710
- 電界計 (EFM; electric field mill)
- ACO power supply with low frequency
- Magnetmeters for the Schumann resonance
- Discussing with technicians (AEL, FCL)
- PEM injection
Low-frequency sound injectorklog16829
- Acoustic injection at X/Y-end
- Magnetic injection
- After O4
- RF monitor with mokugo
- Tiltmeter
- RI detector
- Newtonian noise
- Discussion with DET members
- Daily summary page PEM
Practice for JPS meeting
- Yokozawa (Just showed the slide)
- Suzuki
- Kobayashi
- Kume (Just showed the slide)
Progress report
- Yuzurihara
- Pastavi
- Data Quality Report
- Data quality evaluation
- Suzuki
- Water simulation
- Hoshino
- Seismic motion analysis
- Investigation of ICA analysis
- Progress
- Nishizawa
- Magnetic field analysis
- Washimi
- Tonga analysis
- Yokozawa
- EX oplev noise budget
- Seismic motion analysis
- O3GK
- Microseismic
- Long term