Size: 5256
Comment:
|
Size: 5268
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
* 2022/03/18(Fri) 17:00- | * 2022/03/25(Fri) 17:00- |
Line 8: | Line 8: |
* Deadline 3/28 * LVK Cardiff (September?) * LIGO/Virgo/GEO visiting * Foreign university visiting * Others |
|
Line 13: | Line 18: |
* JPS meeting [[https://www.jps.or.jp/activities/meetings/2022annual/corona/index.php|URL]] * 2022年3月15日(火)~3月19日(土) [[https://onsite.gakkai-web.net/jps/jps_search/2022sp/index.html|program]] * オンライン開催(2/19情報[[https://www.jps.or.jp/activities/meetings/annual/annual-index.php|url]]) * 横澤(Overview)、鈴木(NN)、粂(non-linear ICA)、小林(O3GK ICA) * 鷲見(Noise budget, [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=13473|JGW-G2213473]]) * LVK meeting [[https://wiki.ligo.org/LSC/Meeting/LVKMeetingMarch2022|URL]] * Online * Mar 14-17 |
* ILANCE [[https://indico.in2p3.fr/event/26414/|url]] * Workshop with CNRS, France and UTokyo * 4/15(Fri) 17:00-23:00(JST) (Skip PEM meeting??) * Washimi-san and Yokozawa will participate and have a presentation * GWADW 2022 [[https://agenda.infn.it/event/26121/program|url]] * |
Line 28: | Line 34: |
Line 35: | Line 40: |
* Aoyama gakuin member | * No |
Line 42: | Line 47: |
* IR cavity lock succeeded * Recovery of alignment after Fukushima earthquake |
|
Line 46: | Line 49: |
* Lock loss study * PLL, signal mis-connection, control linear range |
|
Line 49: | Line 50: |
* Glitch check between IMMT1 trans and PRM/IMMT1/IMMT2 | |
Line 51: | Line 53: |
* Report in Yokozawa's part * Mid-size baffle * SR2/SR3 soon(?) * For installing, we performed the first contact |
|
Line 56: | Line 63: |
* ETMY health check * This is important bottleneck of schedule |
|
Line 59: | Line 68: |
* ITMY suspension : ongoing * PCal finalize : ongoing |
* ITMY suspension health check : ongoing * PCal finalize : Review Yesterday |
Line 66: | Line 75: |
* [[https://dac.icrr.u-tokyo.ac.jp/attachment/6069bec9f130890061c6136a|figure]] | * [[attachment:Schedule_220325.pdf|attachment]] |
Line 94: | Line 103: |
* [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=20150|klog20150]] | |
Line 97: | Line 107: |
* Installed to XY end * Cabling * ACO power supply |
* Installed to XY end : Done! * Cabling : Mostly done * ACO power supply : Thanks to technician, Done! [[attachment:pic1|pic]] |
Line 103: | Line 113: |
* Sent to Toyama university and start investigation * Temperature dependence * Environment? |
|
Line 113: | Line 126: |
* New PEM * PSL room with Cryocon * TEAC710 * 電界計 (EFM; electric field mill) * ACO power supply with low frequency |
|
Line 137: | Line 144: |
Line 152: | Line 157: |
* Investigation of ICA analysis * Progress |
* Kobayashi * Investigation of ICA analysis * Kume * Report of paper progress * Fukunaga * Take over Kobayashi-san's work * Kiyota * Schumann resonance |
Line 164: | Line 178: |
* Seismic motion analysis * O3GK * Microseismic * Long term |
Weekly PEM meeting
- 2022/03/25(Fri) 17:00-
- JPS practice focusing meeting
Zoom2 : https://zoom.us/j/6676627462
Report
- C2C program request
- Deadline 3/28
- LVK Cardiff (September?)
- LIGO/Virgo/GEO visiting
- Foreign university visiting
- Others
- 1) participate in the international conferences related GW researches (in Japan and abroad),
- 2) stay for the collaboration work in the counter part countries (UK, USA, Australia, Italy, Gernamy, France, China, Korea, Taiwan, India, VIetnam) .
- 3) participate KAGRA F2F if it will be held onsite.
- Deadline 3/28
Meeting and Conference issue
ILANCE url
- Workshop with CNRS, France and UTokyo
- 4/15(Fri) 17:00-23:00(JST) (Skip PEM meeting??)
- Washimi-san and Yokozawa will participate and have a presentation
GWADW 2022 url
- JpGU 2022 (日本地球惑星科学連合2022年大会)
- 2022年5月22日(日)~6月3日(金) @ 幕張メッセ
緊急セッション「気象津波の発生を伴ったトンガ海底火山噴火」https://www.jpgu.org/meeting_j2022/program.php#late-breaking_session
- 緊急セッションの投稿開始は3月を予定しております.
Other meetings url
If you have some presentation about PEM related, please contact to me.
Business travel
- Depending on the situation of COVID-19
- To Kamioka
- No
- From Kamioka
- No
- To Kamioka
General issue
- Procedure toward X arm commissioning
- TMSX commissioning
- Trial of the pumping down
- Time series check
- Glitch check between IMMT1 trans and PRM/IMMT1/IMMT2
- TCam check
- Script to find the edge of the sapphire mirror
- Report in Yokozawa's part
- TMSX commissioning
- Mid-size baffle
- SR2/SR3 soon(?)
- For installing, we performed the first contact
- IO commissioning
- IMC ASC
- Y arm commissioning
- ETMY health check
- This is important bottleneck of schedule
- ITMY alignment : Done
- Yarm commissioning
- Green lock succeeded(~1s), need the suspension commissioning
- ITMY suspension health check : ongoing
- PCal finalize : Review Yesterday
- Oplev preparation : EY done, IY will start
- BS alignment
- Green laser performance
- ETMY health check
- Schedule
- PEM schedule
- Re-installation of PEMs toward O4
Jurnal paper issue
PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) JGW-P2113405
Invited review paper (Washimi+) JGW-P2113549
- Under reviewing
- Tonga signal paper (Washimi+)
- Writing
- meeting with GIF : 3/23 13:00~ @zoom3
- Acoustic reverberation time paper (Washimi+)
- Suspend
- ICA for E-run/O3GK (Kume, Kobayashi)
- Writing
Portable PEMs (Yokozawa+) <<Start writing>>
Preparation for O4
- New seismometer arrived
- PEM installation check
- Electrical box
- Installed to XY end : Done!
- Cabling : Mostly done
ACO power supply : Thanks to technician, Done! pic
- Electrical box
- MN oplev noise investigation
- Light source
- Sent to Toyama university and start investigation
- Temperature dependence
- Environment?
- New oplev noise budget
- EX
- Main work : Wind, vibration and sound injection FFU on/off
- Prepare to set the PEMs
- Accelerometers
- Seismometer (Move from BS)
- Magnetometer
- Microphone
- PEM injection
- Magnetmeters for the Schumann resonance
- Discussing with technicians (AEL, FCL)
- PEM injection
Low-frequency sound injectorklog16829
- Acoustic injection at X/Y-end
- Magnetic injection
- After O4
- RF monitor with mokugo
- Tiltmeter
- RI detector
- Newtonian noise
- Discussion with DET members
- Daily summary page PEM
Progress report
- Yuzurihara
- Pastavi
- Data Quality Report
- Data quality evaluation
- Suzuki
- Water simulation
- Hoshino
- Seismic motion analysis
- Kobayashi
- Investigation of ICA analysis
- Kume
- Report of paper progress
- Fukunaga
- Take over Kobayashi-san's work
- Kiyota
- Schumann resonance
- Nishizawa
- Magnetic field analysis
- Washimi
- Tonga analysis
- Yokozawa
- Report of Aoyama gakuin group