Weekly PEM meeting
- 2022/04/08(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
Meeting and Conference issue
ILANCE url
Workshop with CNRS, France and UTokyo program
- 4/15(Fri) 15:30-21:00(JST) (Skip PEM meeting)
- Yokozawa : Detector Characterization KAGRA
- Washimi : Underground Environment KAGRA
GWADW 2022 url
- 5/23 ~ 5/27, online
- Registration Deadline : 15 May 2022
- Suzuki? (Water NN)
- Washimi? (Tonga)
- 5/23 ~ 5/27, online
- JpGU 2022 (日本地球惑星科学連合2022年大会)
- 2022年5月22日(日)~6月3日(金) @ 幕張メッセ
緊急セッション「気象津波の発生を伴ったトンガ海底火山噴火」https://www.jpgu.org/meeting_j2022/program.php#late-breaking_session
Washimi JGWDoc14006 (Submitted)
Other meetings url
If you have some presentation about PEM related, please contact to me.
Business travel
- Depending on the situation of COVID-19
- To Kamioka
- Hoshino, Ishii (Niigata) (???)
- From Kamioka
- Washimi (JpGU, Makuhari)
General issue
- Procedure toward X arm commissioning
- IR recovery
- Open the IMC and set the mirror
- Fixed the vacuum leak
- IR recovery
- Mid-size baffle
- SR2 completed
- Y arm commissioning
- ETMY health check
- Hardware done, software ongoing
- Yarm commissioning
- Green lock succeeded(~1s), need the suspension commissioning
- ITMY suspension health check : ongoing
- Oplev preparation : IY, EY done
- Green laser performance
- ETMY health check
- Schedule
- PEM schedule
- Re-installation of PEMs toward O4
出張PEM injection (planning form)
- TAMA300 (May?)
- TOBA (FY2022?)
Jurnal paper issue
PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) JGW-P2113405
Invited review paper (Washimi+) JGW-P2113549
- Under reviewing
- Tonga signal paper (Washimi+)
- Writing
- I would like to open it untill JpGU
- Acoustic reverberation time paper (Washimi+)
- Suspend
- ICA for E-run/O3GK (Kume, Kobayashi)
- Writing
Portable PEMs (Yokozawa+) <<Start writing>>
Preparation for O4
- PEM installation check
- Electrical box
- Installed to XY end : Done!
- Cabling : Mostly done
ACO power supply : Thanks to technician, Done! pic
- Electrical box
- MN oplev noise investigation
- Light source
- Sent to Toyama university and start investigation
- Temperature dependence
- Environment?
- New oplev noise budget
- EX
- Main work : Wind, vibration and sound injection FFU on/off
- Prepare to set the PEMs
- Accelerometers
- Seismometer (Move from BS)
- Magnetometer
- Microphone
- PEM injection
- Magnetmeters for the Schumann resonance
- Discussing with technicians (AEL, FCL)
PEM injection (planning form)
Low-frequency sound injectorklog16829
- Acoustic injection at X/Y-end
- Magnetic injection
- After O4
- RF monitor with mokugo
- Tiltmeter
- RI detector
- Newtonian noise
- Discussion with DET members
- Daily summary page PEM
Progress report
- Yuzurihara
- Pastavi
- Data Quality Report
- Data quality evaluation
- Suzuki
- Water simulation
- Hoshino
- Seismic motion analysis
- Kume
- Report of paper progress
- Fukunaga
- Schumann resonance
- Kiyota
- Take over Kobayashi-san's work
- Nishizawa
- Magnetic field analysis
- Washimi
- Tonga analysis
- Infrasound meeting : 4/20 (水) 10:00~11:00
Shaker injection @ X PCal https://klog.icrr.u-tokyo.ac.jp/osl/?r=20399
- Tonga analysis
- Yokozawa
- Report of Aoyama gakuin group