Differences between revisions 2 and 3
Revision 2 as of 2022-05-13 06:47:00
Size: 5069
Comment:
Revision 3 as of 2022-05-13 06:49:03
Size: 4876
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:
 * GW astronomy account
 * Registration of GWADW2022
Line 11: Line 12:

  * ILANCE [[https://indico.in2p3.fr/event/26414/|url]]
   * Workshop with CNRS, France and UTokyo [[https://indico.in2p3.fr/event/26414/timetable/#20220415|program]]
   * 4/15(Fri) 15:30-21:00(JST) (Skip PEM meeting)
   * Yokozawa : Detector Characterization KAGRA
   * Washimi : Underground Environment KAGRA
Line 23: Line 18:

  * KIW9
   * June 6-8 online
   * registration deadline May31 2022

Weekly PEM meeting

General announcement

  • GW astronomy account
  • Registration of GWADW2022

Meeting and Conference issue

  • GWADW 2022 url

    • 5/23 ~ 5/27, online
      • Registration Deadline : 15 May 2022
    • Suzuki? (Water NN)
    • Washimi? (Tonga)
  • KIW9
    • June 6-8 online
    • registration deadline May31 2022
  • JpGU 2022 (日本地球惑星科学連合2022年大会)
  • Other meetings url

If you have some presentation about PEM related, please contact to me.

Business travel

  • Depending on the situation of COVID-19
  • To Kamioka
    • Hoshino, Ishii (Niigata) (5/1-5/3)
  • From Kamioka
    • Washimi (JpGU, Makuhari)

General issue

  • Procedure toward X arm commissioning
    • IR recovery
      • Open the IMC and set the mirror
      • X arm IR lock continued more than 6 hours
      • Glitch with the angle of PRM
  • Mid-size baffle
    • SR2 completed
  • Y arm commissioning
    • ETMY health check
      • Hardware done, software ongoing
    • Yarm commissioning
      • Green lock succeeded(~1s), need the suspension commissioning
    • ITMY suspension health check : ongoing
    • Oplev preparation : IY, EY done
    • Green laser performance
  • Schedule
  • PEM schedule
    • Re-installation of PEMs toward O4
  • 出張PEM injection (planning form)

    • TAMA300 (May?)
    • TOBA (FY2022?)

Jurnal paper issue

Details are here!

  • PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) JGW-P2113405

  • Invited review paper (Washimi+) JGW-P2113549

    • Under reviewing
  • Tonga signal paper (Washimi+)
    • Writing
    • I would like to open it untill JpGU
  • Acoustic reverberation time paper (Washimi+)
    • Suspend
  • ICA for E-run/O3GK (Kume, Kobayashi)
    • Writing
  • Portable PEMs (Yokozawa+) <<Start writing>>

Preparation for O4

  • PEM installation check
    • Electrical box
      • Installed to XY end : Done!
      • Cabling : Mostly done
      • ACO power supply : Thanks to technician, Done! pic

  • MN oplev noise investigation
    • Light source
    • Sent to Toyama university and start investigation
      • Temperature dependence
      • Environment?
  • New oplev noise budget
    • EX
    • Main work : Wind, vibration and sound injection FFU on/off
    • Prepare to set the PEMs
      • Accelerometers
      • Seismometer (Move from BS)
      • Magnetometer
      • Microphone
      • PEM injection
  • Magnetmeters for the Schumann resonance
    • Discussing with technicians (AEL, FCL)
  • PEM injection (planning form)

    • Low-frequency sound injectorklog16829

    • Acoustic injection at X/Y-end
    • Magnetic injection
  • After O4
    • RF monitor with mokugo
    • Tiltmeter
    • RI detector
    • Newtonian noise
  • Discussion with DET members
    • Daily summary page PEM

Progress report

  • Yuzurihara
    • Pastavi
    • Data Quality Report
    • Data quality evaluation
  • Suzuki
    • Water simulation
  • Hoshino
    • Seismic motion analysis
  • Kume
    • Report of paper progress
  • Fukunaga
    • Schumann resonance
  • Kiyota
    • Take over Kobayashi-san's work
  • Nishizawa
    • Magnetic field analysis
  • Washimi
  • Yokozawa
    • Report of Aoyama gakuin group

Place for memo

KAGRA/Subgroups/PEM/Meeting/220513/Agenda (last edited 2022-05-13 17:24:19 by tatsuki.washimi)