Size: 5462
Comment:
|
Size: 6200
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
* 2022/05/27(Fri) 17:00- | * 2022/06/03(Fri) 17:00- |
Line 8: | Line 8: |
* Discussion with the TOBA member * TOBA is not operating now * Environmental noise investigation, especially seismic and magnetic noise were well done * Investigation of the environmental noise in CLIO or some KAGRA related site is more important * Yokozawa and Washimi-san will visit CLIO site in near future |
|
Line 10: | Line 16: |
* Seismic noise and infrastructure noise | * Seismic noise and infrastructure noise (11th July?) |
Line 13: | Line 19: |
* Visitting to Virgo site | * Visiting to Virgo site |
Line 15: | Line 21: |
* Contact to Virgo people | |
Line 18: | Line 25: |
* Visiting to the LIGO site * We don't have any idea now, but if you have interested in, I will start the coordinate |
|
Line 19: | Line 29: |
* GWADW 2022 [[https://indico.icrr.u-tokyo.ac.jp/event/255/timetable/|url]] *5/23 ~ 5/27, online * Suzuki (Water NN) * Washimi (Tonga) |
|
Line 49: | Line 54: |
* Registration 6/2 | * Washimi : Infrasound * Hoshino : Seismic and ocean |
Line 54: | Line 60: |
* ET symposium in Budapest, Hungary * GR23 in Beijin, China * GWPAW2022 in Melbourne Australia * GRASS 2022 in Padova, Italy |
|
Line 73: | Line 84: |
* Mirror position changed ~2 mm both vertical and horizontal(now investigating) | |
Line 76: | Line 88: |
* PR2 -> Done * SR2 -> Done |
|
Line 77: | Line 91: |
* BS First contact done | * BS -> Done * PR3 * SR3 * SRM ?? |
Line 81: | Line 98: |
* IY 3.8e-3 Pa * EY 9.3e-4 Pa |
* Leak check and its repairing * Next step is IR lock with Yarm * OMC commissioning * Bring back to Kamioka and checked * Start the install and alignment from next week * New laser * Accepted to move to Kamioka |
Line 92: | Line 116: |
* TOBA (FY2022?) | |
Line 151: | Line 175: |
* Pastavi * IMMT1 glitch * TCam |
|
Line 177: | Line 198: |
* JpGU report [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=14088|JGW-G2214088]] | * Preparation of barometer |
Line 180: | Line 201: |
* | * oplev beam noise and windshield |
Weekly PEM meeting
- 2022/06/03(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
General announcement
- Discussion with the TOBA member
- TOBA is not operating now
- Environmental noise investigation, especially seismic and magnetic noise were well done
- Investigation of the environmental noise in CLIO or some KAGRA related site is more important
- Yokozawa and Washimi-san will visit CLIO site in near future
- Important discussion with ET people
- Magnetic field
- Seismic noise and infrastructure noise (11th July?)
- If you want to join the discussion, please let Yokozawa know.
- Visiting to Virgo site
- By C2C budget
- Contact to Virgo people
- August? : After KAGRA F2F meeting conflict with vacance?
- September? : After JPS meeting and can join the LVK meeting onsite, concern of the KAGRA schedule.
- Visiting to the LIGO site
- We don't have any idea now, but if you have interested in, I will start the coordinate
Meeting and Conference issue
- JpGU 2022 (日本地球惑星科学連合2022年大会)
- 2022年5月22日(日)~6月3日(金) @ 幕張メッセ
緊急セッション「気象津波の発生を伴ったトンガ海底火山噴火」https://www.jpgu.org/meeting_j2022/program.php#late-breaking_session
Washimi JGWDoc14006 (Submitted)
KIW9 url
- June 6-8 online
- registration deadline May31 2022
UGAP2022 url
- 6/13-15 @ Tokyo University of Science (Noda)
- Washimi (lightning monitor)
- KAGRA F2F meeting
- August 1-3
- Hongo campus
- LVK meeting
- 12-15 September
- Cardiff Unviersity, UK
- JPS meeting
- 2022/9/6-8 Okayama
- Washimi : Infrasound
- Hoshino : Seismic and ocean
- 日本天文学会
- 9/13-15
- 新潟大学
- ET symposium in Budapest, Hungary
- GR23 in Beijin, China
- GWPAW2022 in Melbourne Australia
- GRASS 2022 in Padova, Italy
Other meetings url
If you have some presentation about PEM related, please contact to me.
Business travel
- Depending on the situation of COVID-19
- To Kamioka
- No
- From Kamioka
- Washimi (UGAP, Noda)
General issue
- Procedure toward X arm commissioning
- Radiation shield cooling Xend
- IM temperature below 200K
- Finesse is not changed
- Mirror position changed ~2 mm both vertical and horizontal(now investigating)
- Radiation shield cooling Xend
- Mid-size baffle
First contact -> Suspension health check -> Mid size baffle install
PR2 -> Done
SR2 -> Done
PRM -> Done
BS -> Done
- PR3
- SR3
- SRM ??
- Y arm commissioning
- Pumping down started
- Leak check and its repairing
- Next step is IR lock with Yarm
- OMC commissioning
- Bring back to Kamioka and checked
- Start the install and alignment from next week
- New laser
- Accepted to move to Kamioka
- Schedule
- PEM schedule
- Re-installation of PEMs toward O4
出張PEM injection (planning form)
- TAMA300 (June 22?)
Jurnal paper issue
PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) JGW-P2113405
- Tonga paper (Washimi+)
- Internal seminor : 5/18
- Plauground data application (KSC board) : Approved from KSC board
- PWT circulation : 5/25
- CPC submission (target) : 5/30
- Journal submission (target) : 6/13
- Micro seismic analysis (Hoshini)
- writing
- Acoustic reverberation time paper (Washimi+)
- Suspend
- Re-measurement before O4?
- ICA for E-run/O3GK (Kume, Kobayashi)
- Sibmitted to CPC
Preparation for O4
- Barometers and infrasound placement underground
- Discuss by Washimi-san later
- Magnetic field underground
- Discuss with Virgo member next week
- Fan, ...
- Seismic and infrastructure noise
- Magnetmeters for the Schumann resonance
- ADU (Washimi)
- Discussing with technicians (AEL, FCL)
PEM injection (planning form)
Low-frequency sound injectorklog16829
- Acoustic injection at X/Y-end
- Magnetic injection (I want to start the preparation soon)
- After O4
- RF monitor with mokugo
- Tiltmeter
- RI detector
- Newtonian noise
- Discussion with DET members
- Daily summary page PEM
Progress report
- Yuzurihara
- Data Quality Report
- Data quality evaluation
- Suzuki
- Poster for GWADW2022
- Water simulation
- Hoshino
- Seismic motion analysis
- Kume
- Report of paper progress
- Fukunaga
- Schumann resonance
- Kiyota
- Take over Kobayashi-san's work
- Nishizawa
- Magnetic field analysis
- Washimi
- Preparation of barometer
- Yokozawa
- oplev beam noise and windshield