⇤ ← Revision 1 as of 2022-08-19 08:33:44
Size: 5401
Comment:
|
Size: 5337
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
* 2022/08/05(Fri) 17:00- | * 2022/08/19(Fri) 17:00- |
Line 14: | Line 14: |
* Meeting of Seismic noise and infrastructure noise (11th July) | |
Line 23: | Line 22: |
* KAGRA F2F meeting * August 1-3 * Hongo campus * Wiki page [[https://dac.icrr.u-tokyo.ac.jp/KAGRA/KSC/f2f/2022August|url]] * Be careful of traveling |
|
Line 39: | Line 32: |
* Onsite | |
Line 57: | Line 51: |
* End of August(?) Fukunaga | * 8/16-8/27 Fukunaga and OMU M1 student * 8/29-9/3 Miyamoto |
Line 59: | Line 54: |
* F2F related (8/1~3, UT Hongo) | * JPS meeting (9/4-9/8) |
Line 64: | Line 59: |
* 7/11 - 8/12 Suspension commissioning Type-B * 8/5 Acceptance check PRM~PR2 * 8/13 - 8/19 Acceptance check ~SRM * 8/22 - 8/26 Closing the center area ~PR2 |
* 7/11 - 8/19 Suspension commissioning Type-B * (Done) 8/5 Acceptance check suspension PRM~PR2 * (Done?) 8/19 Acceptance check interferometer MICH and suspension BS~SRM * 8/22 - 8/26 Closing the center area PRM~PR2 |
Line 76: | Line 71: |
* New suspension control using MN TILT oplev * Power budget TMSX |
|
Line 78: | Line 75: |
* Pumping down ongoing * Installed the ion pums to IXC and IYC * Oplev centering * IY duct shield cooling (8/5-) |
* IY duct shield cooling * TMSY vacuum preparation |
Line 86: | Line 81: |
* Temperature monitor | |
Line 89: | Line 85: |
* Calibration confirmation | * Very stable ~6h lock * ALS noise after fiber noise cancellation is dominant source |
Line 91: | Line 88: |
* Noise budget | * Find IR resonance improved |
Line 95: | Line 93: |
* TCam analysis * Find the beam position * OMC alignment |
|
Line 134: | Line 137: |
* We discussed with GIF group next Tuesday | |
Line 194: | Line 196: |
* PEM MAP update * Onsite Schumann resonance meeting |
* Schumann resonance measurement |
Line 199: | Line 200: |
* Onsite DeepClean discussion |
Weekly PEM meeting
- 2022/08/19(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
General announcement
- KAGRA visiting plan
- Welcome to visit KAGRA site
- Please contact to Ohashi-san
- Important discussion with ET people
- Magnetic field from infrastructure
- If you want to join the discussion, please let Yokozawa know.
- Visiting to Virgo site
- By C2C budget
- Contact to Virgo people
- Next year?
Meeting and Conference issue
- LVK meeting
- 12-15 September
- Cardiff Unviersity, UK
- JPS meeting
- 2022/9/6-8 Okayama
- Washimi : Infrasound
- Hoshino : Seismic and ocean
- Onsite
- 日本天文学会
- 9/13-15
- 新潟大学
- ET symposium in Budapest, Hungary
- GR23 in Beijin, China
- GWPAW2022 in Melbourne Australia
- GRASS 2022 in Padova, Italy
Other meetings url
If you have some presentation about PEM related, please contact to me.
Business travel
- Depending on the situation of COVID-19
- To Kamioka
- 8/16-8/27 Fukunaga and OMU M1 student
- 8/29-9/3 Miyamoto
- From Kamioka
- JPS meeting (9/4-9/8)
General issue
- Overall schedule
- 7/11 - 8/19 Suspension commissioning Type-B
- (Done) 8/5 Acceptance check suspension PRM~PR2
- (Done?) 8/19 Acceptance check interferometer MICH and suspension BS~SRM
- 8/22 - 8/26 Closing the center area PRM~PR2
- 8/29 - 9/2 Closing the center area ~SRM
- 9/5 - 9/9 Leak test
- X arm commissioning
- End X IM 81K
- Investigation of the noise in the new oplev light source
- Investigation of the TMSX beam shape
- Investigation of the ADC noise
- New suspension control using MN TILT oplev
- Power budget TMSX
- Y arm commissioning
- IY duct shield cooling
- TMSY vacuum preparation
- Beam dump around IFI
- Many ghost beam
- beam dumper from reflection beam of the PRM
- Temperature monitor
- ALS CARM/DARM
- ALS CARM/DARM lock succeeded
- Very stable ~6h lock
- ALS noise after fiber noise cancellation is dominant source
- Transfer function measurement Type-A suspension
- ALS CARM/DARM lock succeeded
- Find IR resonance improved
- MICH 3f lock
- Actuation efficiency measurement
- TCam analysis
- Find the beam position
- OMC alignment
- Discussion of closing center area
- Oplev pylon
- Beam duct re-installation
- New gate valve
- Closing chambers around BS area
- Schedule
- PEM schedule
- Re-installation of PEMs toward O4
出張PEM injection (planning form)
- TAMA300 (retrieve the PEM)
Jurnal paper issue
- ICA for E-run/O3GK (Kume, Kobayashi)
- Tonga paper (Washimi+)
- English correction : finished
- Submitted to arXiv(v2) and PTEP
- Micro seismic analysis (Hoshino)
- writing
- Acoustic reverberation time paper (Washimi+)
- Suspend
- Re-measurement before O4?
Preparation for O4
- Barometers and infrasound placement underground
- Set the temperature, humidity and barometer to each station
- Check the cabling at Yarm
- Search the PEMs for air monitor
- Seismic and infrastructure noise
- Call for analysis person
- After infrasound microphone installation
- Magnetmeters for the Schumann resonance
- Fukunaga-san's report
- ADU (Washimi)
- Discussing with technicians (AEL, FCL)
- Weather station
- Weather in KAGRA entrance
- New weather station
- Calibration
PEM injection (planning form)
Low-frequency sound injectorklog16829
- Acoustic injection at X/Y-end
- Magnetic injection (I want to start the preparation soon)
- After O4
- RF monitor with mokugo
- Tiltmeter
- RI detector
- Newtonian noise
- Discussion with DET members
- Daily summary page PEM
Progress report
- Yuzurihara
- Pastavi
- Data Quality Report
- Data quality evaluation
- Suzuki
- Water simulation
- Hoshino
- Seismic motion analysis
- Kume
- Report of paper progress
- Fukunaga
- Schumann resonance
- Kiyota
- Take over Kobayashi-san's work
- Nishizawa
- Water newtonian noise
- Magnetic field analysis
- Washimi
- Schumann resonance measurement
- Yokozawa
- Investigating the MN oplev glitch