Differences between revisions 2 and 3
Revision 2 as of 2022-11-03 10:19:12
Size: 5501
Comment:
Revision 3 as of 2022-11-04 16:25:56
Size: 5545
Comment:
Deletions are marked like this. Additions are marked like this.
Line 30: Line 30:
  * [[https://www.lowbg.org/ugap/ws/lb2022/index.html]]   * [[https://www.lowbg.org/ugap/ws/lb2022/index.html]]
Line 45: Line 45:
  * GWPAW2022 in Melbourne Australia
  * GRASS 2022 in Padova, Italy
  * GWPAW2022 in Melbourne Australia (5-9 December)
Line 194: Line 194:
  * Voltmonitor   * Voltmonitor [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=22742|klog22742]]

Weekly PEM meeting

General announcement

  • KAGRA visiting plan
    • Welcome to visit KAGRA site
    • Please contact to Ohashi-san
  • Important discussion with ET people
    • Magnetic field from infrastructure
    • If you want to join the discussion, please let Yokozawa know.
  • Visiting to Virgo site
    • By C2C budget
    • Contact to Virgo people
      • Next year?
    • Washimi will visit Virgo in mid. Nov (NAOJ budget)

Meeting and Conference issue

  • 第3回新学術「地下宇宙」若手研究会@つくば国際会議場
  • 第8回極低放射能技術研究@つくば国際会議場
  • ET annual meeting @ EGO
    • Nov.15-17
  • The 30th KAGRA Face-to-Face meeting in hybrid style
    • Nov 30-Dec 1, 2022 JST
    • url

    • registration page (Nov. 11th)

    • Please have a presentation for master thesis
  • JPS meeting (Online)
    • Registration : 11/15〜12/1
  • GR23 in Beijin, China
  • GWPAW2022 in Melbourne Australia (5-9 December)
  • Other meetings url

If you have some presentation about PEM related, please contact to me.

Business travel

  • Depending on the situation of COVID-19
  • To Kamioka
  • From Kamioka
    • Washimi go to Itary
      • 11/8 : Gran Sasso (GSSI, LNGS)
      • 11/10~19 : Virgo

General issue

  • Overall schedule
    • All leak test at center area was performed
      • OMC : In air, finalize will be performed next week.
      • TMSY : In vac, leak test done, opened the gate valve after 15th Nov.
    • ETMY cooling down will start from 15th Nov.
  • Interferometer overall
    • Initial alignment experiment
      • 16:00- everyday
    • PRMI lock trial
      • Search the good alignment
        • ADS engaged and alignment of the IMMT1,2 and PRM
    • FPMI lock succeeded
      • DARM(AS17), CARM(REFL45), MICH(REFL51->POP17)

      • Latest sensitivity klog22097

      • Calibration evaluation
      • Control filter optimization
      • Interferometer characterization
    • X arm commissioning
      • End X IM 85K
      • We will start the noise budget of the new oplev again
      • OMC ASC using the Xend test mass
        • Signal was detected in OMC PD
    • Y arm commissioning
      • IY duct shield cooling
    • New high power laser
      • PMC locked
    • ISS
      • Control loop done
      • Characterization is ongoing
    • ASC preparation
      • Sensing matrix measurements
  • Schedule
  • PEM schedule
    • Re-installation of PEMs toward O4
  • 出張PEM injection (planning form)

Jurnal paper issue

Details are here!

Preparation for O4

  • Weather station
    • Weather in KAGRA entrance
    • New weather station
    • Calibration
  • Investigation of the PEM injection is just started
    • New DAC preparation
    • Acoustic injection at PSL/IMMCS/X/Y-end
    • Magnetic injection (After Washimi-san visiting to Virgo)
    • Portable PEM injectors
  • Voltmeter preparation
    • We made the PEM channel
      • K1:PEM-VOLT_{PSL,IMCREFL,REFL,ISS,AS}_TABLE_{GND,FLOAT,DIFF}
      • K1:PEM-VOLT_OMC_CHAMBER_{GND,FLOAT,DIFF}
    • Need the AC power monitor?
  • Schumann resonance outside
    • Measured from end of Aug.
    • Position slightly changed
      • X(to be the angle between X and Y to 90 deg)
      • Z(-10 cm)
    • Prepared the AC power supply and LAN cable
    • Start the measurement of the electric field
  • After O4
    • RF monitor with mokugo
    • Tiltmeter
    • RI detector
    • Newtonian noise
  • Discussion with DET members
    • Daily summary page PEM

Progress report

  • Yuzurihara
    • Pastavi
    • Data Quality Report slide

    • Data quality evaluation
  • Suzuki
    • Water simulation
  • Hoshino
    • Seismic motion analysis
  • Miyamoto
    • Weather analysis
  • Kume
    • Report of paper progress
  • Fukunaga
    • Schumann resonance
  • Kiyota
    • Power line noise investigation
  • Nishizawa
    • Water newtonian noise
    • Magnetic field analysis
  • Washimi
  • Yokozawa
    • Report of the VK PEM meeting

Place for memo

KAGRA/Subgroups/PEM/Meeting/221104/Agenda (last edited 2022-11-04 16:39:52 by tatsuki.washimi)