Size: 5811
Comment:
|
← Revision 3 as of 2022-11-25 14:31:48 ⇥
Size: 5828
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 20: | Line 20: |
* Washimi will visit Virgo in mid. Nov (NAOJ budget) | |
Line 27: | Line 26: |
* 鷲見 [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=14530|JGW-G2214530]] | |
Line 31: | Line 31: |
* ET annual meeting @ EGO * Nov.15-17 |
* 鷲見 [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=14535|JGW-G2214535]] |
Line 62: | Line 60: |
* Washimi go to Itary * 11/8 : Gran Sasso (GSSI, LNGS) * 11/10~19 : Virgo |
|
Line 212: | Line 207: |
* Virgo visiting | * |
Weekly PEM meeting
- 2022/11/25(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
General announcement
- KAGRA visiting plan
- Welcome to visit KAGRA site
- Please contact to Ohashi-san
- Important discussion with ET people
- Magnetic field from infrastructure
- If you want to join the discussion, please let Yokozawa know.
- Visiting to Virgo site
- By C2C budget
- Contact to Virgo people
- Next year?
Meeting and Conference issue
- 第3回新学術「地下宇宙」若手研究会@つくば国際会議場
- 2022年11月23日(水)~24日(木)
鷲見 JGW-G2214530
- 第8回極低放射能技術研究@つくば国際会議場
- 2022年11月24日(木)~26日(土)
鷲見 JGW-G2214535
- The 30th KAGRA Face-to-Face meeting in hybrid style
- Nov 30-Dec 1, 2022 JST
registration page (Nov. 11th)
- Please have a presentation for master thesis
第7回 宇宙素粒子若手の会 秋の研究会 https://www.icrr.u-tokyo.ac.jp/YMAP/event/conf2022/index.html
- 12/9, 10 @ 神岡
- Registration : 〜11/20
- JPS meeting (Online)
- Registration : 11/15〜12/1
- GR23 in Beijin, China
- GWPAW2022 in Melbourne Australia (5-9 December)
Other meetings url
If you have some presentation about PEM related, please contact to me.
Business travel
- Depending on the situation of COVID-19
- To Kamioka
- 11/13-11/23 Kiyota
- From Kamioka
General issue
- Overall schedule
- OMC : Started the pumping down
- Review for beacom and pumping down
- TMSY : In vac, leak test done, opened the gate valve after 22nd Nov.
- OMC : Started the pumping down
- IMC trouble
- Function generator broken
- Repaired
- Function generator broken
- Interferometer overall
- Initial alignment experiment
- 16:00- everyday
- Initial alignment experiment
- Suspension
- Implemented the IP filter
- PRMI lock trial
- Search the good alignment
- ADS engaged and alignment of the IMMT1,2 and PRM
- Search the good alignment
- FPMI lock succeeded
DARM(AS17), CARM(REFL45), MICH(REFL51->POP17)
Latest sensitivity klog22097
- Calibration evaluation
- Control filter optimization
- Interferometer characterization
- X arm commissioning
- End X IM 85K
- We will start the noise budget of the new oplev again
- OMC ASC using the Xend test mass
- Signal was detected in OMC PD
- Y arm commissioning
- IY duct shield cooling
- New high power laser
- PMC locked
- ISS
- Control loop done
- Characterization is ongoing
- ASC preparation
- Sensing matrix measurements
- Offset evaluation
- OMC
- First contact applied
- Magnet recovery
- Alignment
- OMC locked
- Schedule
- PEM schedule
- Re-installation of PEMs toward O4
出張PEM injection (planning form)
Jurnal paper issue
- ICA for E-run/O3GK (Kume, Kobayashi)
- Micro seismic analysis (Hoshino)
- writing
- Acoustic reverberation time paper (Washimi+)
- Suspend
- Re-measurement before O4?
Preparation for O4
- Weather station
- Weather in KAGRA entrance
- New weather station
- Calibration
- Investigation of the PEM injection is just started
- New DAC preparation
- Acoustic injection at PSL/IMMCS/X/Y-end
- Magnetic injection (After Washimi-san visiting to Virgo)
- Portable PEM injectors
- Voltmeter preparation
- We made the PEM channel
- K1:PEM-VOLT_{PSL,IMCREFL,REFL,ISS,AS}_TABLE_{GND,FLOAT,DIFF}
- K1:PEM-VOLT_OMC_CHAMBER_{GND,FLOAT,DIFF}
- Need the AC power monitor?
- We made the PEM channel
- Schumann resonance outside
- Measured from end of Aug.
- Position slightly changed
- X(to be the angle between X and Y to 90 deg)
- Z(-10 cm)
- Prepared the AC power supply and LAN cable
- Start the measurement of the electric field
- After O4
- RF monitor with mokugo
- Tiltmeter
- RI detector
- Newtonian noise
- Discussion with DET members
- Daily summary page PEM
Progress report
- Yuzurihara
- Pastavi
Data Quality Report slide
- Data quality evaluation
- Suzuki
- Water simulation
- Hoshino
- Seismic motion analysis
- Miyamoto
- Weather analysis
- Kume
- Report of paper progress
- Fukunaga
- Schumann resonance
- Kiyota
- Power line noise investigation
- Nishizawa
- Water newtonian noise
- Magnetic field analysis
- Washimi
- Yokozawa