Size: 4900
Comment:
|
Size: 4801
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 54: | Line 54: |
* Kiyota(12/18-24) | |
Line 59: | Line 60: |
* Overall schedule * OMC : LSC and ASL locked * DC readout done |
* momentary blackout * 2022/12/15 9:45 * Recovered |
Line 63: | Line 64: |
* EYC cooling down * Opened the gate valve between EYC and TMSY * Started the duct shield cooling down |
* FPMI lock * Lock enable * Trial for DC readout with ISS control |
Line 67: | Line 68: |
* Interferometer overall * PRMI lock succeeded * PRFPMI Lock trial |
* PRFPMI lock trial * PRMI lock stable * Establish the initial alignment * Bottle neck is the noise level of ALS * It made difficult to hand over from GR to IR |
Line 71: | Line 74: |
* FPMI lock succeeded * DARM(AS17), CARM(REFL45), MICH(REFL51->POP17) * Latest sensitivity [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=22097|klog22097]] * Calibration evaluation * Control filter optimization * Interferometer characterization |
* ALS noise hunting * We found ondotori was one of the noise which made twin glitch * 0.4 Hz unknown peak |
Line 78: | Line 78: |
* X arm commissioning * End X IM 86K |
* ASC implementation * Evaluate offset map * Trial of the implementation of the ASC loop |
Line 81: | Line 82: |
* Y arm commissioning * IY, EY duct shield cooling |
* OMC status * Pumping down : ongoing * We succeeded to lock the OMC LSC and ASC * Implemented the OMC ASC using beacom from the ETMX drum head mode |
Line 84: | Line 87: |
* New high power laser * PMC locked * IMC locked * ISS * Control loop done * Characterization is ongoing |
* Suspension commissioning * Check the long term stability of the suspensions with the control loop for the observation mode * Investigating the ACC, geophone, seismometer and LVDT for reducing the low frequency fluctuation |
Line 92: | Line 91: |
* ASC preparation * Sensing matrix measurements * Offset evaluation * Schedule * [[attachment:Schedule_220325.pdf|attachment]] * PEM schedule * Re-installation of PEMs toward O4 |
* ISS/High power laser * ISS characterization is ongoing * High power laser : Check the stability of IMC LSC lock |
Line 123: | Line 116: |
* Weather in KAGRA entrance * New weather station * Calibration |
* 2nd weather station * Rain and snow |
Line 128: | Line 120: |
* New DAC preparation * Acoustic injection at PSL/IMMCS/X/Y-end * Magnetic injection (After Washimi-san visiting to Virgo) |
* Preparing the function generator * Acoustic injection preparation * Magnetic injection |
Line 137: | Line 129: |
* Need the AC power monitor? | * AC power monitoring * Bought transreducer |
Line 140: | Line 133: |
* Measured from end of Aug. * Position slightly changed * X(to be the angle between X and Y to 90 deg) * Z(-10 cm) * Prepared the AC power supply and LAN cable * Start the measurement of the electric field |
* Measured from end of Aug. (Now finished) |
Line 187: | Line 175: |
* Magnetic injection | |
Line 189: | Line 178: |
* Discussion in F2F meeting | * Removed the ondotori |
Weekly PEM meeting
- 2022/12/16(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
General announcement
- Author list application 2022
- [kagra 05488]
- If you have question or consultation, please contact to Yokozawa and Washimi-san
- Task list generation 2023
- Also, please contact to me if there are question or consultation
- KAGRA visiting plan
- Welcome to visit KAGRA site
- Please contact to Ohashi-san
- Important discussion with ET people
- Magnetic field from infrastructure
- If you want to join the discussion, please let Yokozawa know.
- Visiting to Virgo site
- By C2C budget
- Contact to Virgo people
- Next year?
Meeting and Conference issue
第7回 宇宙素粒子若手の会 秋の研究会 https://www.icrr.u-tokyo.ac.jp/YMAP/event/conf2022/index.html
- 12/9, 10 @ 神岡
- Registration : 〜11/20
- JPS meeting (Online)
- Registration : Finished
- Washimi(Schumann resonance)
- Fulunaga(Schumann resonance)
- Miyamoto(Weather)
- Registration : Finished
- GR23 in Beijin, China
- GWPAW2022 in Melbourne Australia (5-9 December)
Other meetings url
If you have some presentation about PEM related, please contact to me.
Business travel
- Depending on the situation of COVID-19
- To Kamioka
- Miyamoto(12/12-24)
- Kiyota(12/18-24)
- From Kamioka
General issue
- momentary blackout
- 2022/12/15 9:45
- Recovered
- FPMI lock
- Lock enable
- Trial for DC readout with ISS control
- PRFPMI lock trial
- PRMI lock stable
- Establish the initial alignment
- Bottle neck is the noise level of ALS
- It made difficult to hand over from GR to IR
- ALS noise hunting
- We found ondotori was one of the noise which made twin glitch
- 0.4 Hz unknown peak
- ASC implementation
- Evaluate offset map
- Trial of the implementation of the ASC loop
- OMC status
- Pumping down : ongoing
- We succeeded to lock the OMC LSC and ASC
- Implemented the OMC ASC using beacom from the ETMX drum head mode
- Suspension commissioning
- Check the long term stability of the suspensions with the control loop for the observation mode
- Investigating the ACC, geophone, seismometer and LVDT for reducing the low frequency fluctuation
- ISS/High power laser
- ISS characterization is ongoing
- High power laser : Check the stability of IMC LSC lock
出張PEM injection (planning form)
Jurnal paper issue
- ICA for E-run/O3GK (Kume, Kobayashi)
- Micro seismic analysis (Hoshino)
- writing
- Acoustic reverberation time paper (Washimi+)
- Suspend
- Re-measurement before O4?
Preparation for O4
- Weather station
- 2nd weather station
- Rain and snow
- Investigation of the PEM injection is just started
- Preparing the function generator
- Acoustic injection preparation
- Magnetic injection
- Portable PEM injectors
- Voltmeter preparation
- We made the PEM channel
- K1:PEM-VOLT_{PSL,IMCREFL,REFL,ISS,AS}_TABLE_{GND,FLOAT,DIFF}
- K1:PEM-VOLT_OMC_CHAMBER_{GND,FLOAT,DIFF}
- AC power monitoring
- Bought transreducer
- We made the PEM channel
- Schumann resonance outside
- Measured from end of Aug. (Now finished)
- After O4
- RF monitor with mokugo
- Tiltmeter
- RI detector
- Newtonian noise
- Discussion with DET members
- Daily summary page PEM
Progress report
- Yuzurihara
- Pastavi
Data Quality Report slide
- Data quality evaluation
- Suzuki
- Water simulation
- Hoshino
- Seismic motion analysis
- Miyamoto
- Weather analysis
- Kume
- Report of paper progress
- Fukunaga
- Schumann resonance
- Kiyota
- Power line noise investigation
- Nishizawa
- Water newtonian noise
- Magnetic field analysis
- Washimi
- Report the Virgo/ET visiting
- Magnetic injection
- Yokozawa
- Removed the ondotori