Size: 4861
Comment:
|
← Revision 6 as of 2023-01-13 16:39:15 ⇥
Size: 4028
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 8: | Line 8: |
* Author list application 2022 * [kagra 05488] * Finished |
|
Line 13: | Line 9: |
* [[attachment:authorlisttasklist_PEM_2023.pdf|task list 2023]] * Deadline: January 6 (Fri), 2023 * Also, please contact to me if there are question or consultation |
* Posted |
Line 18: | Line 12: |
* Welcome to visit KAGRA site * Please contact to Ohashi-san |
* Now, the budget of KAGRA is limiting, but if you want to visit Kamioka, please contact to Yokozawa |
Line 21: | Line 14: |
* Important discussion with ET people * Magnetic field from infrastructure * If you want to join the discussion, please let Yokozawa know. * Visiting to Virgo site * By C2C budget * Contact to Virgo people * Next year? |
|
Line 49: | Line 34: |
* Miyamoto(12/12-24) * Kiyota(12/18-24) |
* Hoshino, Sato(1/15-18) |
Line 58: | Line 43: |
* Silent run sometimes performed * 2022/12/28 evening - 2023/01/14 morning * Overnight * Silent run sometimes performed * 2022/12/28 evening - 2023/01/14 morning * Overnight |
|
Line 67: | Line 61: |
* ALS noise hunting * 0.4 Hz phase noise * Implementation of the phase noise cancellation * Air disturbance noise * Need silent PSL room ? * 10 Hz harmonics line noise? |
* Implementation of the PNC(Phase Noise Cancellation) to reduce the 0.4Hz resonant peak * In vac optical table and put the steering mirror on it * Reducing the air disturbance |
Line 78: | Line 69: |
* OMC status * Pumping down : ongoing * We succeeded to lock the OMC LSC and ASC * Implemented the OMC ASC using beacom from the ETMX drum head mode |
|
Line 83: | Line 70: |
* Suspension commissioning * Check the long term stability of the suspensions with the control loop for the observation mode * Investigating the ACC, geophone, seismometer and LVDT for reducing the low frequency fluctuation |
* Repair the leak at OMC area * End of January? |
Line 87: | Line 73: |
* ISS/High power laser * ISS characterization is ongoing * Hammering test(?) * High power laser : Check the stability of IMC LSC lock * Beam profile measurement |
* High power laser : PLL with new laser * During the repairing work? |
Line 111: | Line 94: |
* meeting : 12/21 13:00-15:00 | * Playground application |
Line 122: | Line 106: |
* 東洋テクニカ meting : 12/22(木) 16:00~ | |
Line 173: | Line 157: |
* Washimi [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=14597|JGW-G2214597]] * Magnetic injection |
* Washimi * Virgo mag * SEM update |
Weekly PEM meeting
- 2022/12/23(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
General announcement
- Task list generation 2023
- Posted
- KAGRA visiting plan
- Now, the budget of KAGRA is limiting, but if you want to visit Kamioka, please contact to Yokozawa
Meeting and Conference issue
- JPS meeting (Online)
- Registration : Finished
- Washimi(Schumann resonance)
- Fulunaga(Schumann resonance)
- Miyamoto(Weather)
- Registration : Finished
- GR23 in Beijin, China
- GWPAW2022 in Melbourne Australia (5-9 December)
Other meetings url
If you have some presentation about PEM related, please contact to me.
Business travel
- Depending on the situation of COVID-19
- To Kamioka
- Hoshino, Sato(1/15-18)
- From Kamioka
General issue
- FPMI lock
- Lock enable
- Silent run sometimes performed
- 2022/12/28 evening - 2023/01/14 morning
- Overnight
- Silent run sometimes performed
- 2022/12/28 evening - 2023/01/14 morning
- Overnight
- Trial for DC readout with ISS control
- ALS CARM/DARM tuning
- PRFPMI lock trial
- PRMI lock stable
- Establish the initial alignment
- Bottle neck is the noise level of ALS
- It made difficult to hand over from GR to IR
- Implementation of the PNC(Phase Noise Cancellation) to reduce the 0.4Hz resonant peak
- In vac optical table and put the steering mirror on it
- Reducing the air disturbance
- ASC implementation
- Evaluate offset map
- Trial of the implementation of the ASC loop
- Repair the leak at OMC area
- End of January?
- High power laser : PLL with new laser
- During the repairing work?
出張PEM injection (planning form)
Jurnal paper issue
- ICA for E-run/O3GK (Kume, Kobayashi)
- Micro seismic analysis (Hoshino)
- writing
- Acoustic reverberation time paper (Washimi+)
- Suspend
- Re-measurement before O4?
- Tonga GIF paper
- Playground application
Preparation for O4
- Weather station
- 2nd weather station installed
- Rain and snow
- Investigation of the PEM injection is just started
- Preparing the function generator
- Acoustic injection preparation
- Magnetic injection
- Portable PEM injectors
- Voltmeter preparation
- We made the PEM channel
- K1:PEM-VOLT_{PSL,IMCREFL,REFL,ISS,AS}_TABLE_{GND,FLOAT,DIFF}
- K1:PEM-VOLT_OMC_CHAMBER_{GND,FLOAT,DIFF}
- AC power monitoring
- Bought transreducer
- We made the PEM channel
- Schumann resonance outside
- Measured from end of Aug. (Now finished)
- After O4
- RF monitor with mokugo
- Tiltmeter
- RI detector
- Newtonian noise
- Discussion with DET members
- Daily summary page PEM
Progress report
- Yuzurihara
- Pastavi
Data Quality Report slide
- Data quality evaluation
- Suzuki
- Water simulation
- Hoshino
- Seismic motion analysis
- Miyamoto
- Weather analysis
- Kume
- Report of paper progress
- Fukunaga
- Schumann resonance
- Kiyota
- Power line noise investigation
- Nishizawa
- Water newtonian noise
- Magnetic field analysis
- Washimi
- Virgo mag
- SEM update
- Yokozawa
- New PEM preparation