Size: 4028
Comment:
|
← Revision 5 as of 2023-01-20 16:59:18 ⇥
Size: 4236
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
* 2022/12/23(Fri) 17:00- | * 2023/01/20(Fri) 17:00- |
Line 8: | Line 8: |
* Task list generation 2023 * Posted |
|
Line 14: | Line 11: |
* SEO budget * For maintenance, observation and toward O5 |
|
Line 23: | Line 22: |
* 2nd SPB workshop * [[https://indico.ego-gw.it/event/525/|url]] * Yokozawa will present the KAGRA status * LVK meeting * [[https://sites.northwestern.edu/lvk2023ciera/|url]] |
|
Line 24: | Line 30: |
* GWPAW2022 in Melbourne Australia (5-9 December) | |
Line 26: | Line 31: |
* Other meetings [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/DAWG/conferences|url]] | * Other meetings [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/DAWG/conferences|url]] |
Line 41: | Line 46: |
* Site work * 1/30 - 2/3 Repair the leak at OMC area * PLL with new laser |
|
Line 44: | Line 53: |
* 2022/12/28 evening - 2023/01/14 morning | * 2022/12/28 evening - 2023/01/14 morning [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=23463|klog23463]] |
Line 46: | Line 55: |
* Silent run sometimes performed * 2022/12/28 evening - 2023/01/14 morning * Overnight * Trial for DC readout with ISS control * ALS CARM/DARM tuning |
* FPMI with DC readout and ISS locked * 2023/01/15 6:10:00 - 8:10:00(JST) [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=23575|klog23575]] * 2023/01/19 7:10:00 - 9:10:00(JST) [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=23638|klog23638]] |
Line 60: | Line 64: |
* How to brand for hand over | |
Line 69: | Line 73: |
* Repair the leak at OMC area * End of January? * High power laser : PLL with new laser * During the repairing work? |
|
Line 98: | Line 96: |
* Weather station * 2nd weather station installed * Rain and snow |
|
Line 107: | Line 101: |
* Portable PEM injectors | * Portable PEM injectors |
Line 115: | Line 109: |
* Schumann resonance outside * Measured from end of Aug. (Now finished) |
|
Line 130: | Line 121: |
* Oshino * Update the daily summary page |
|
Line 134: | Line 128: |
* Brief report of the silent run | |
Line 158: | Line 153: |
* Virgo mag | |
Line 160: | Line 154: |
* VK mag | |
Line 162: | Line 157: |
* New PEM preparation | * Interesting topic during silent run |
Weekly PEM meeting
- 2023/01/20(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
General announcement
- KAGRA visiting plan
- Now, the budget of KAGRA is limiting, but if you want to visit Kamioka, please contact to Yokozawa
- SEO budget
- For maintenance, observation and toward O5
Meeting and Conference issue
- JPS meeting (Online)
- Registration : Finished
- Washimi(Schumann resonance)
- Fulunaga(Schumann resonance)
- Miyamoto(Weather)
- Registration : Finished
- 2nd SPB workshop
- Yokozawa will present the KAGRA status
- LVK meeting
- GR23 in Beijin, China
Other meetings url
If you have some presentation about PEM related, please contact to me.
Business travel
- Depending on the situation of COVID-19
- To Kamioka
- Hoshino, Sato(1/15-18)
- From Kamioka
General issue
- Site work
- 1/30 - 2/3 Repair the leak at OMC area
- PLL with new laser
- FPMI lock
- PRFPMI lock trial
- PRMI lock stable
- Establish the initial alignment
- Bottle neck is the noise level of ALS
- It made difficult to hand over from GR to IR
- How to brand for hand over
- Implementation of the PNC(Phase Noise Cancellation) to reduce the 0.4Hz resonant peak
- In vac optical table and put the steering mirror on it
- Reducing the air disturbance
- It made difficult to hand over from GR to IR
- ASC implementation
- Evaluate offset map
- Trial of the implementation of the ASC loop
出張PEM injection (planning form)
Jurnal paper issue
- ICA for E-run/O3GK (Kume, Kobayashi)
- Micro seismic analysis (Hoshino)
- writing
- Acoustic reverberation time paper (Washimi+)
- Suspend
- Re-measurement before O4?
- Tonga GIF paper
- Playground application
Preparation for O4
- Investigation of the PEM injection is just started
- Preparing the function generator
- Acoustic injection preparation
- Magnetic injection
- Portable PEM injectors
- Voltmeter preparation
- We made the PEM channel
- K1:PEM-VOLT_{PSL,IMCREFL,REFL,ISS,AS}_TABLE_{GND,FLOAT,DIFF}
- K1:PEM-VOLT_OMC_CHAMBER_{GND,FLOAT,DIFF}
- AC power monitoring
- Bought transreducer
- We made the PEM channel
- After O4
- RF monitor with mokugo
- Tiltmeter
- RI detector
- Newtonian noise
- Discussion with DET members
- Daily summary page PEM
Progress report
- Oshino
- Update the daily summary page
- Yuzurihara
- Pastavi
Data Quality Report slide
- Data quality evaluation
- Brief report of the silent run
- Suzuki
- Water simulation
- Hoshino
- Seismic motion analysis
- Miyamoto
- Weather analysis
- Kume
- Report of paper progress
- Fukunaga
- Schumann resonance
- Kiyota
- Power line noise investigation
- Nishizawa
- Water newtonian noise
- Magnetic field analysis
- Washimi
- SEM update
- VK mag
- Yokozawa
- Interesting topic during silent run