⇤ ← Revision 1 as of 2023-02-24 07:45:59
Size: 4457
Comment:
|
← Revision 2 as of 2023-02-24 08:04:04 ⇥
Size: 5199
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
* 2023/02/17(Fri) 17:00- | * 2023/02/24(Fri) 17:00- |
Line 7: | Line 7: |
* Tasklist 2023 application * Deadline : 2/22(Wed) 17:00(JST) * Based on this application, we will discuss the author list end of this year, please submit your task. * If you plan to submit PEM tasks, please contact to Yokozawa and Washimi-san |
|
Line 32: | Line 26: |
* Deadline abstract submission 20th Feb(?) | * Yokozawa will present about KAGRA PEM |
Line 66: | Line 60: |
* Miyamoto (2/12-18) | |
Line 73: | Line 66: |
* PRFPMI with AS17 + OMC DC readout done | * PRFPMI locked |
Line 75: | Line 68: |
* Future work * Vibration effect to OMC leg * Feedforward MICH/PRCL to DARM * Check the scattering light * Improve the suspension control * Alignment sensing and control |
* ~30 min with current best sensitivity * Noise hunting * MICH and PRCL feed forward implementation * MICH done, PRCL ongoing * Vibration of OMC leg * Investigation done, hunting ongoing * Turn off instrument * TMP and related pumps off * FFUs, coolers, dry air * Temperature control difficult * Will stop more instruments * Vibration and sound around * Some peaks disappeared after stopped the TMP * Several peak remained with CARM related * Hammering test to optical table, chamber, beam duct and chamber leg, ... * Noise budget evaluation * MICH, PRCL, CARM, Intensity, etc |
Line 82: | Line 86: |
* Control filter optimization * Suspension control * Now evaluating the suspension control noise * IMC's -> much less than sensitivity curve * PR's ongoing * BS : suspect point |
|
Line 92: | Line 102: |
* Received the accept from CQG | |
Line 106: | Line 117: |
* Investigation of the PEM injection is just started * Acoustic injection preparation * Portable + SR3 PEM system recovery * Magnetic injection * After O4a? |
* Many portable accelerometer to chamber and beam ducts * Checking the vibration effect from vacuum pumps * Evaluating the effect to OMC leg * Remove after hammering test |
Line 116: | Line 126: |
* Investigation of the PEM injection is just started * Acoustic injection preparation * Output sound smaller compared from O3GK's * Magnetic injection * After O4a? |
|
Line 123: | Line 139: |
* Prepared * DC power monitoring * Arrived at Kamioka |
|
Line 163: | Line 182: |
* VK mag | |
Line 167: | Line 185: |
* Current commissioning | * Vibration around OMC area [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=14836|JGWDoc14836]] |
Weekly PEM meeting
- 2023/02/24(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
General announcement
- KAGRA visiting plan
- Now, the budget of KAGRA is limiting, but if you want to visit Kamioka, please contact to Yokozawa
- SEO budget
- For maintenance, observation and toward O5
Meeting and Conference issue
- JPS meeting (Online)
- Registration : Finished
- Washimi(Schumann resonance)
- Fukunaga(Schumann resonance)
- Miyamoto(Weather)
- Registration : Finished
- ICRC 2023
- Nagoya
- Deadline 2/20
- Yokozawa will present about KAGRA PEM
- 電離層とシューマン共振スペクトルの時間変動
- 2/21(Tue) 16:00-
- LVK meeting
- 13 - 16 Mar
- ILANCE conference
- 27 - 30 Mar
- Kyoto University
- GWADW 2023
- 21 - 27 May, Elba, Italy
- One day could be the day for "KAGRA commissioning support" and "experiences/results in KAGRA" presentation
- The 3rd generation can be a large topics because ET is now proceeding.
- LVK Meeting
- 11 - 14 Sep.
- Toyama, Japan
- 10th KIW
- 29,30th May
Other meetings url
If you have some presentation about PEM related, please contact to me.
Business travel
- Depending on the situation of COVID-19
- To Kamioka
- Fukunaga (2/20-2/24)
- From Kamioka
- No
General issue
- PRFPMI locked
- 1.2 W output from IMC (7 W when O3GK)
- ~30 min with current best sensitivity
- Noise hunting
- MICH and PRCL feed forward implementation
- MICH done, PRCL ongoing
- Vibration of OMC leg
- Investigation done, hunting ongoing
- Turn off instrument
- TMP and related pumps off
- FFUs, coolers, dry air
- Temperature control difficult
- Will stop more instruments
- Vibration and sound around
- Some peaks disappeared after stopped the TMP
- Several peak remained with CARM related
- Hammering test to optical table, chamber, beam duct and chamber leg, ...
- Noise budget evaluation
- MICH, PRCL, CARM, Intensity, etc
- Interferometer characterization
- Control filter optimization
- Suspension control
- Now evaluating the suspension control noise
IMC's -> much less than sensitivity curve
- PR's ongoing
- BS : suspect point
- Now evaluating the suspension control noise
- Increased the laser power
- MICH and PRCL feed forward implementation
出張PEM injection (planning form)
Jurnal paper issue
- ICA for E-run/O3GK (Kume, Kobayashi)
- Received the accept from CQG
- Micro seismic analysis (Hoshino)
- writing
- Acoustic reverberation time paper (Washimi+)
- Suspend
- Re-measurement before O4?
- Tonga GIF paper
- Playground application
Preparation for O4
- Many portable accelerometer to chamber and beam ducts
- Checking the vibration effect from vacuum pumps
- Evaluating the effect to OMC leg
- Remove after hammering test
- Finalize the PEM installation
- Accelerometer to C chamber and TMS table
- Microphone to C chamber
- Do we need both booth and field?
- Investigation of the PEM injection is just started
- Acoustic injection preparation
- Output sound smaller compared from O3GK's
- Magnetic injection
- After O4a?
- Acoustic injection preparation
- Voltmeter preparation
- We made the PEM channel
- K1:PEM-VOLT_{PSL,IMCREFL,REFL,ISS,AS}_TABLE_{GND,FLOAT,DIFF}
- K1:PEM-VOLT_OMC_CHAMBER_{GND,FLOAT,DIFF}
- AC power monitoring
- Bought transreducer
- Prepared
- DC power monitoring
- Arrived at Kamioka
- We made the PEM channel
- After O4
- RF monitor with mokugo
- Tiltmeter
- RI detector
- Newtonian noise
- Discussion with DET members
- Daily summary page PEM
Progress report
- Yuzurihara
- Pastavi
Data Quality Report slide
- Data quality evaluation
- Suzuki
- Water simulation
- Hoshino
- Seismic motion analysis
- Miyamoto
- Weather analysis
- Kume
- Report of paper progress
- Fukunaga
- Schumann resonance
- Kiyota
- Power line noise investigation
- Nishizawa
- Water newtonian noise
- Magnetic field analysis
- Washimi
- PRFPMI OMC leg
- Yokozawa
Vibration around OMC area JGWDoc14836