Differences between revisions 1 and 5 (spanning 4 versions)
Revision 1 as of 2023-03-06 08:28:19
Size: 700
Comment:
Revision 5 as of 2023-03-09 17:40:36
Size: 893
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:

 * How to access the JGWdoc for LV people : [[https://dcc.ligo.org/LIGO-L2000007]]
Line 17: Line 19:
 * KAGRA detector status & Update of the KAGRA PEM from last meeting (Yokozawa)  * KAGRA detector status & Update of the KAGRA PEM from last meeting (Yokozawa)[[attachment:VKPEM_230309.pdf|pdf]]
 * Virgo status (Irene)
Line 19: Line 22:
 * Virgo status (Irene)  * Status of KAGRA Schumann resonance study
  * Underground/outside Virgo site (Washimi)
  * Long term stability (Fukunaga)

 * Status of Virgo Schumann resonance study
  * Status (Francesca)
Line 21: Line 29:
 * Status of KAGRA Schumann resonance study
  * Long term stability (Fukunaga)
  * Underground/outside Virgo site (Washimi)

Virgo-KAGRA PEM meeting

Agenda

  • Publication issue
    • O3GK ICA Paper
    • Seismic motion paper
      • Writing
  • KAGRA detector status & Update of the KAGRA PEM from last meeting (Yokozawa)pdf

  • Virgo status (Irene)
  • Status of KAGRA Schumann resonance study
    • Underground/outside Virgo site (Washimi)
    • Long term stability (Fukunaga)
  • Status of Virgo Schumann resonance study
    • Status (Francesca)
  • Others
    • Future PEM meeting

KAGRA/Subgroups/PEM/Meeting/230309/Agenda (last edited 2023-03-13 08:39:27 by TakaakiYokozawa)