⇤ ← Revision 1 as of 2023-03-17 10:28:43
Size: 5563
Comment:
|
← Revision 2 as of 2023-03-17 10:35:12 ⇥
Size: 5079
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
* 2023/03/10(Fri) 17:00- | * 2023/03/17(Fri) 17:00- |
Line 16: | Line 16: |
* VK PEM meeting * 2023/03/09 * Schumann resonance discussion * [[https://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/Meeting/230309/Agenda|wiki]] |
|
Line 22: | Line 17: |
* Registration : Finished * Washimi(Schumann resonance) * Fukunaga(Schumann resonance) * Miyamoto(Weather) |
* Washimi(Schumann resonance) * Fukunaga(Schumann resonance) * Miyamoto(Weather) |
Line 72: | Line 66: |
* Two hours with current best sensitivity | * Activities this week * Phase noise cancellation : Repairing the PZT * Circuit repairing : Common mode servo * Vibration investigation(future) * Alignment sensing and controls (Start using PRFPMI) |
Line 75: | Line 73: |
* MICH done, PRCL ongoing | * More tuning will be performed |
Line 77: | Line 75: |
* Investigation done (Washimi-san will report) * Re-measurement with better sensitivity |
* Now under the sensitivity curve |
Line 80: | Line 77: |
* Test done (Washimi-san will report) | * Test done |
Line 82: | Line 79: |
* The capper structure may inject the vibration, we will remove it next week * Already recovered * Sensitivity imporoved * Test done (Washimi-san will report) |
* Test done |
Line 88: | Line 82: |
* Yesterday, investigated | * Noise projection investigation |
Line 190: | Line 184: |
* Hammering and Shaker injection on PRFPMI [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=14870|JGW-G2314870]] * Schumann resonance [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=14868|JGW-G2314868]] |
* Hammering and Shaker injection on PRFPMI |
Weekly PEM meeting
- 2023/03/17(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
General announcement
- KAGRA visiting plan
- Now, the budget of KAGRA is limiting, but if you want to visit Kamioka, please contact to Yokozawa
- SEO budget
- For maintenance, observation and toward O5
Meeting and Conference issue
- JPS meeting (Online)
- Washimi(Schumann resonance)
- Fukunaga(Schumann resonance)
- Miyamoto(Weather)
- ICRC 2023
- Nagoya
- Deadline 2/20
- Yokozawa will present about KAGRA PEM
- LVK meeting
- 13 - 16 Mar
- ILANCE conference
- 27 - 30 Mar
- Kyoto University
- GWADW 2023
- 21 - 27 May, Elba, Italy
- One day could be the day for "KAGRA commissioning support" and "experiences/results in KAGRA" presentation
- The 3rd generation can be a large topics because ET is now proceeding.
- LVK Meeting
- 11 - 14 Sep.
- Toyama, Japan
- 10th KIW
- 29,30th May
Other meetings url
If you have some presentation about PEM related, please contact to me.
Business travel
- Depending on the situation of COVID-19
- To Kamioka
- Suzuki (3/19-3/21)
- From Kamioka
- No
General issue
- PRFPMI locked
- 1.2 W output from IMC (7 W when O3GK)
- Best ~0.8 Mpc
- Average ~0.6 Mpc(?)
- Activities this week
- Phase noise cancellation : Repairing the PZT
- Circuit repairing : Common mode servo
- Vibration investigation(future)
- Alignment sensing and controls (Start using PRFPMI)
- Noise hunting
- MICH and PRCL feed forward implementation
- More tuning will be performed
- Vibration of OMC leg
- Now under the sensitivity curve
- Vibration around IMC
- Test done
- Vibration around IFI chamber
- Test done
- Noise budget evaluation
- MICH, PRCL, CARM, Intensity, etc
- Noise projection investigation
- Suspension sensing noise
- Except for BS sensor noise evaluated
- MICH, PRCL, CARM, Intensity, etc
- Interferometer characterization
- Increasing the power at REFL table
- Alignment sensing and controls
- Control filter optimization
- Suspension control
- Now evaluating the suspension control noise
- Increased the laser power
- MICH and PRCL feed forward implementation
- 1.2 W output from IMC (7 W when O3GK)
出張PEM injection (planning form)
Jurnal paper issue
- ICA for E-run/O3GK (Kume, Kobayashi)
- Received the accept from CQG
- Micro seismic analysis (Hoshino)
- writing
- Acoustic reverberation time paper (Washimi+)
- Suspend
- Re-measurement before O4?
- Tonga GIF paper
- Playground application
Preparation for O4
- Many portable accelerometer to chamber and beam ducts
- Checking the vibration effect from vacuum pumps
- Evaluating the effect to OMC leg
- Remove after hammering test
- Finalize the PEM installation
- Accelerometer to C chamber and TMS table
- Microphone to C chamber
- Do we need both booth and field?
- Investigation of the PEM injection is just started
- Acoustic injection preparation
- Output sound smaller compared from O3GK's
- Magnetic injection
- After O4a?
- Acoustic injection preparation
- Voltmeter preparation
- We made the PEM channel
- K1:PEM-VOLT_{PSL,IMCREFL,REFL,ISS,AS}_TABLE_{GND,FLOAT,DIFF}
- K1:PEM-VOLT_OMC_CHAMBER_{GND,FLOAT,DIFF}
- AC power monitoring
- Bought transreducer
- Prepared
- DC power monitoring
- Arrived at Kamioka
- We made the PEM channel
- After O4
- RF monitor with mokugo
- Tiltmeter
- RI detector
- Newtonian noise
- Discussion with DET members
- Daily summary page PEM
Progress report
- Yuzurihara
- Pastavi
Data Quality Report slide
- Data quality evaluation
- Suzuki
- Water simulation
- Hoshino
- Seismic motion analysis
- Sato
- Sound source analysid
- Miyamoto
- Weather analysis
- Kume
- Report of paper progress
- Fukunaga
- Schumann resonance
- Kiyota
- Power line noise investigation
- Nishizawa
- Water newtonian noise
- Magnetic field analysis
- Washimi
- Hammering and Shaker injection on PRFPMI
- Yokozawa
- Ground motion Yend 1F