Differences between revisions 2 and 3
Revision 2 as of 2023-04-14 07:12:52
Size: 5063
Comment:
Revision 3 as of 2023-04-14 07:26:04
Size: 5095
Comment:
Deletions are marked like this. Additions are marked like this.
Line 166: Line 166:
  * Oplev glitch investigation

Weekly PEM meeting

General announcement

  • If you or your student/stuff have interested in the new PEM activity, please contact to me
  • O4a run will start from 24th May
    • 4 weeks run it will finish 21st Junne
    • Mostly onsite and Mitaka member will have a shift for observation
      • Not disagree that offsite member come KAGRA during run
    • CAL/DET week from 17th May
      • We will stop the innterferometer update
  • KAGRA visiting plan
    • Now, the budget of KAGRA is limiting, but if you want to visit Kamioka, please contact to Yokozawa
  • RRT shift

Meeting and Conference issue

  • XIII Einstein Telescope Symposium https://indico.ego-gw.it/event/562/abstracts/

    • May 8–12, in Cagliari Italy
    • Washimi (online) : Schumann resonance amprification
    • Somiya (online) : Water NN
  • GWADW 2023
    • 21 - 27 May, Elba, Italy
    • One day could be the day for "KAGRA commissioning support" and "experiences/results in KAGRA" presentation
    • The 3rd generation can be a large topics because ET is now proceeding.
  • 10th KIW
    • 29,30th May
    • C2C support possible, if you have interested in having the presentation about PEM, please contact to me
    • Washimi (SOC)
    • Hoshino
  • ICRC 2023 url

    • Nagoya
    • Deadline 2/20
    • Yokozawa will present about KAGRA PEM (oral)
    • Washimi will present about Schumann resonance and SGWB
  • JPS meeting (Tohoku U)
    • Limiting hotel
  • Other meetings url

If you have some presentation about PEM related, please contact to me.

Business travel

  • Depending on the situation of COVID-19
  • To Kamioka
    • No
  • From Kamioka
    • No

General issue

  • PRFPMI locked
    • 1.2 W output from IMC (7 W when O3GK)
      • Best 1.0 Mpc (?)
    • Activities this week
      • ASC using wave front sensors and ADS, BPC and so on
        • BPC at center area
        • Problem of the discrepancy between green and IR
        • Problem of how to align to the OMC after ASC performing
      • MICH and PRCL feed forward implementation
        • To find the time
    • (Future) Interferometer characterization
      • Increasing the power at REFL table
      • MICH controls investigation
        • POP table to REFL table
        • Simulation
      • Alignment sensing and controls
      • Control filter optimization
      • Suspension control
        • Now evaluating the suspension control noise
      • Increased the laser power
  • 出張PEM injection (planning form)

Jurnal paper issue

Details are here!

  • Micro seismic analysis (Hoshino)
  • Acoustic reverberation time paper (Washimi+)
    • Suspend
    • Re-measurement before O4?
  • Tonga GIF paper
    • Referee comments

Preparation for O4

  • Discussion of the portable PEM channels
    • klog24621

    • Still under investigation with the results of the tapping test
  • Finalize the PEM installation
    • Accelerometer to C chamber and TMS table (Maybe postpone after O4a, lower priority)
    • Microphone to C chamber (Maybe postpone after O4a, lower priority)
  • Investigation of the PEM injection is just started
    • Tapping test is higher priority
    • Acoustic injection preparation
      • Output sound smaller compared from O3GK's
    • Magnetic injection
      • After O4a?
  • Voltmeter preparation
    • We made the PEM channel
      • K1:PEM-VOLT_{PSL,IMCREFL,REFL,ISS,AS}_TABLE_{GND,FLOAT,DIFF}
      • K1:PEM-VOLT_OMC_CHAMBER_{GND,FLOAT,DIFF}
    • AC power monitoring
      • Bought transreducer
      • Prepared
    • DC power monitoring
      • Arrived at Kamioka
  • After O4
    • RF monitor with mokugo
    • Tiltmeter
    • RI detector
    • Newtonian noise
  • Discussion with DET members
    • Daily summary page PEM

Progress report

  • Yuzurihara
    • Pastavi
    • Data Quality Report slide

    • Data quality evaluation
  • Hoshino
    • Seismic motion analysis
  • Sato
    • Sound source analysid
  • Miyamoto
    • Weather analysis
  • Kume
    • Noise subtraction
  • Nishizawa
    • Water newtonian noise
    • Magnetic field analysis
  • Washimi
  • Yokozawa
    • Morning silent run
    • Oplev glitch investigation

Place for memo

KAGRA/Subgroups/PEM/Meeting/230414/Agenda (last edited 2023-04-14 07:28:26 by TakaakiYokozawa)