Differences between revisions 1 and 2
Revision 1 as of 2023-04-28 08:41:00
Size: 5320
Comment:
Revision 2 as of 2023-04-28 08:49:10
Size: 5410
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
 * 2023/04/21(Fri) 17:00-  * 2023/04/28(Fri) 17:00-
Line 65: Line 65:
   * Best 1.0 Mpc (?)    * Best more than 1.0 Mpc (Yokoyama-san announced)[[https://dac.icrr.u-tokyo.ac.jp/KAGRA/DAWG/Detchar/klog/klog24923|latest sensitivity]]
Line 69: Line 69:
    * Problem of how to align to the OMC after ASC performing
   * MICH and PRCL feed forward implementation
    * To find the time
   * Tapping test day
    * Tapping both end (Explained later)
   * CAL day
    * Analysis is ongoing, we may believe the BNS range
   * Overnight silent run
    * We can start the keep the observation state
     * Implementation of the good oplev record guardian
     * Implementation of the high bandwidth WFS control
     * Lock loss study
Line 73: Line 80:
   * Increasing the power at REFL table
   * MICH controls investigation
    * POP table to REFL table
    *
Simulation
   * Increasing the laser power
   * Continuous tapping test
    * Center area at Saturday
Line 84: Line 90:
   * 4/21 [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=24905|klog24905]]
   * 4/20 [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=24891|klog24391]] [[https://dac.icrr.u-tokyo.ac.jp/KAGRA/DAWG/Detchar/klog/klog24891|sensitivity]]
   * Currently, if the lock state is observation, this would be silent run
Line 106: Line 111:
 * Discussion of the portable PEM channels
  * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=24621|klog24621]]
  * Still under investigation with the results of the tapping test
 * Environment will be fixed today
  * Turned off the cooler and heater at the same time
  * High resolution heater
Line 114: Line 119:
 * Investigation of the PEM injection is just started  * Investigation of the PEM injection

Weekly PEM meeting

General announcement

  • If you or your student/stuff have interested in the new PEM activity, please contact to me
    • New member
  • O4a run will start from 24th May
    • 4 weeks run it will finish 21st Junne
    • Mostly onsite and Mitaka member will have a shift for observation
      • Not disagree that offsite member come KAGRA during run
    • CAL/DET week from 17th May
      • We will stop the innterferometer update
  • SEO budget to PEM is limiting
  • KAGRA visiting plan
    • Now, the budget of KAGRA is limiting, but if you want to visit Kamioka, please contact to Yokozawa

Meeting and Conference issue

  • XIII Einstein Telescope Symposium https://indico.ego-gw.it/event/562/abstracts/

    • May 8–12, in Cagliari Italy
    • Washimi (online) : Schumann resonance amprification
    • Somiya (online) : Water NN
  • GWADW 2023
    • 21 - 27 May, Elba, Italy
    • One day could be the day for "KAGRA commissioning support" and "experiences/results in KAGRA" presentation
    • The 3rd generation can be a large topics because ET is now proceeding.
  • 10th KIW
    • 29,30th May
    • C2C support possible, if you have interested in having the presentation about PEM, please contact to me
    • Washimi (SOC)
    • Hoshino
  • ICRC 2023 url

    • Nagoya
    • Deadline 2/20
    • Yokozawa will present about KAGRA PEM (oral)
    • Washimi will present about Schumann resonance and SGWB
  • JPS meeting (Tohoku U)
    • Limiting hotel
  • Other meetings url

If you have some presentation about PEM related, please contact to me.

Business travel

  • Depending on the situation of COVID-19
  • To Kamioka
    • No
  • From Kamioka
    • No

General issue

  • PRFPMI locked
    • 1.2 W output from IMC (7 W when O3GK)
    • Activities this week
      • ASC using wave front sensors and ADS, BPC and so on
        • Higher frequency WFS to reduce the fluctuation of IR transmittance power
      • Tapping test day
        • Tapping both end (Explained later)
      • CAL day
        • Analysis is ongoing, we may believe the BNS range
      • Overnight silent run
        • We can start the keep the observation state
          • Implementation of the good oplev record guardian
          • Implementation of the high bandwidth WFS control
          • Lock loss study
    • (Future) Interferometer characterization
      • Increasing the laser power
      • Continuous tapping test
        • Center area at Saturday
      • Alignment sensing and controls
      • Control filter optimization
      • Suspension control
        • Now evaluating the suspension control noise
      • Increased the laser power
    • Silent run
      • Currently, if the lock state is observation, this would be silent run
  • 出張PEM injection (planning form)

Jurnal paper issue

Details are here!

  • Micro seismic analysis (Hoshino)
  • Acoustic reverberation time paper (Washimi+)
    • Suspend
    • Re-measurement before O4?
  • Tonga GIF paper
    • Referee comments

Preparation for O4

  • Environment will be fixed today
    • Turned off the cooler and heater at the same time
    • High resolution heater
  • Finalize the PEM installation
    • Accelerometer to C chamber and TMS table (Maybe postpone after O4a, lower priority)
    • Microphone to C chamber (Maybe postpone after O4a, lower priority)
  • Investigation of the PEM injection
    • Tapping test is higher priority
    • Acoustic injection preparation
      • Output sound smaller compared from O3GK's
    • Magnetic injection
      • After O4a?
  • Voltmeter preparation
    • We made the PEM channel
      • K1:PEM-VOLT_{PSL,IMCREFL,REFL,ISS,AS}_TABLE_{GND,FLOAT,DIFF}
      • K1:PEM-VOLT_OMC_CHAMBER_{GND,FLOAT,DIFF}
    • AC power monitoring
      • Bought transreducer
      • Prepared
    • DC power monitoring
      • Arrived at Kamioka
  • After O4
    • RF monitor with mokugo
    • Tiltmeter
    • RI detector
    • Newtonian noise
  • Discussion with DET members
    • Daily summary page PEM

Progress report

  • Yuzurihara
    • Pastavi
    • Data Quality Report slide

    • Data quality evaluation
  • Hoshino
    • Seismic motion analysis
  • Sato
    • Sound source analysid
  • Miyamoto
    • Weather analysis
  • Takatani
    • Calculation of Schumann resonance
  • Kume
    • Noise subtraction
  • Nishizawa
    • Water newtonian noise
    • Magnetic field analysis
  • Washimi
  • Yokozawa
    • Morning silent run
    • Oplev glitch investigation

Place for memo

KAGRA/Subgroups/PEM/Meeting/230428/Agenda (last edited 2023-04-28 17:08:59 by tatsuki.washimi)