Differences between revisions 1 and 2
Revision 1 as of 2023-05-12 07:03:54
Size: 5482
Comment:
Revision 2 as of 2023-05-12 07:17:12
Size: 6396
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
 * 2023/04/28(Fri) 17:00-  * 2023/05/12(Fri) 17:00-
Line 7: Line 7:

 * If you or your student/stuff have interested in the new PEM activity, please contact to me
  * New member
Line 24: Line 21:
Line 36: Line 34:
   * C2C support possible, if you have interested in having the presentation about PEM, please contact to me
Line 63: Line 60:
 * PRFPMI locked
  * 1.2 W output from IMC (7 W when O3GK)
   * Best more than 1.0 Mpc (Yokoyama-san announced)[[https://dac.icrr.u-tokyo.ac.jp/KAGRA/DAWG/Detchar/klog/klog24923|latest sensitivity]]
  * Activities this week
   * ASC using wave front sensors and ADS, BPC and so on
    * Higher frequency WFS to reduce the fluctuation of IR transmittance power
   * Tapping test day
    * Tapping both end (Explained later)
   * CAL day
    * Analysis is ongoing, we may believe the BNS range
   * Overnight silent run
    * We can start the keep the observation state
     * Implementation of the good oplev record guardian
     * Implementation of the high bandwidth WFS control
     * Lock loss study
 * Status
  * Sensitivity 1.2 -1.4 Mpc [[https://dac.icrr.u-tokyo.ac.jp/KAGRA/DAWG/Detchar/klog/klog25188|latest]]
  * From the results of CAL/DET day at 4/26, calibration is consistent with previous measurement
Line 79: Line 64:
  * (Future) Interferometer characterization
   * Increasing the laser power
   * Continuous tapping test
    * Center area at Saturday
   * Alignment sensing and controls
   * Control filter optimization
   * Suspension control
    * Now evaluating the suspension control noise
   * Increased the laser power
 * Effect of earthquake at Noto peninsula
  * 5th May : Magnitude 6.7 at Noto peninsula
   * Several earthquakes are still happened
  * Interferometer is already recovered
   * Re-alignment at PSL room
Line 89: Line 70:
 * Commissioning work
  * Alignment sensing and controls
   * We need the PR3 global control to keep the stable opleration
    * Trial is ongoing
    * If trial is not succeeded until the O4a, we will sometimes perform manual alignment
   * OMC alignment control problem
    * Fixing is ongoing
    * If trial is not succeeded until the O4a, we will sometimes perform manual trouble shooting
  * Tapping test and shaker injection
   * We performed the tapping test(Vibration injection test by hand) at 4/25 and 4/29
   * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=14941|Result(JGWDoc14941)]]
   * OMC chamber is most sensitive part, we performed the shaker injection test
    * Analysis is ongoing
  * Acoustic injection test
   * REFL table [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=25073|klog25073]]
   * POP table [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=25190|klog25190]]
  * Increasing the laser power
   * Toward the stable operation is higher priority, so if possible we will try to increase the laser power
  * Glitch investigation
   * ETMY oplev glitch
    * Solved by install the temperature control system
   * ITMY suspension glitch
    * Try to install the IR/GR filter in front of oplev QPD
   * IPC glitch
    * It sometimes happened that the time series sometimes jump during observation [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=24930|example(klog24930)]]
    * Trial of slim down the real time model
    * Trial the glitch reason by Sawada-san
   * 37 Hz glitch
    * It detected in OMC signal [[ https://klog.icrr.u-tokyo.ac.jp/osl/?r=25106|klog25106]]
    * 37 Hz and its harmonics frequency excited
    * Seeing in hveto analysis(?)
    * The reason is not understand yet
  * Lock loss investigation
   * Ongoing
Line 90: Line 105:
   * Currently, if the lock state is observation, this would be silent run
  
   * Night silent run restarted.
Line 99: Line 114:
   * writing    * Submit to CPC soon
Line 172: Line 187:
  * Results of tapping test [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=24958]]   * Daytime ground motion
  * Shaker injection OMC
  * Acoustic injection POP, REFL
Line 176: Line 193:
  * Oplev glitch investigation

Weekly PEM meeting

General announcement

  • O4a run will start from 24th May
    • 4 weeks run it will finish 21st Junne
    • Mostly onsite and Mitaka member will have a shift for observation
      • Not disagree that offsite member come KAGRA during run
    • CAL/DET week from 17th May
      • We will stop the innterferometer update
  • SEO budget to PEM is limiting
  • KAGRA visiting plan
    • Now, the budget of KAGRA is limiting, but if you want to visit Kamioka, please contact to Yokozawa

Meeting and Conference issue

  • XIII Einstein Telescope Symposium https://indico.ego-gw.it/event/562/abstracts/

    • May 8–12, in Cagliari Italy
    • Washimi (online) : Schumann resonance amprification
    • Somiya (online) : Water NN
  • GWADW 2023
    • 21 - 27 May, Elba, Italy
    • One day could be the day for "KAGRA commissioning support" and "experiences/results in KAGRA" presentation
    • The 3rd generation can be a large topics because ET is now proceeding.
  • 10th KIW
    • 29,30th May
    • Washimi (SOC)
    • Hoshino
  • ICRC 2023 url

    • Nagoya
    • Deadline 2/20
    • Yokozawa will present about KAGRA PEM (oral)
    • Washimi will present about Schumann resonance and SGWB
  • JPS meeting (Tohoku U)
    • Limiting hotel
  • Other meetings url

If you have some presentation about PEM related, please contact to me.

Business travel

  • Depending on the situation of COVID-19
  • To Kamioka
    • No
  • From Kamioka
    • No

General issue

  • Status
    • Sensitivity 1.2 -1.4 Mpc latest

    • From the results of CAL/DET day at 4/26, calibration is consistent with previous measurement
  • Effect of earthquake at Noto peninsula
    • 5th May : Magnitude 6.7 at Noto peninsula
      • Several earthquakes are still happened
    • Interferometer is already recovered
      • Re-alignment at PSL room
  • Commissioning work
    • Alignment sensing and controls
      • We need the PR3 global control to keep the stable opleration
        • Trial is ongoing
        • If trial is not succeeded until the O4a, we will sometimes perform manual alignment
      • OMC alignment control problem
        • Fixing is ongoing
        • If trial is not succeeded until the O4a, we will sometimes perform manual trouble shooting
    • Tapping test and shaker injection
      • We performed the tapping test(Vibration injection test by hand) at 4/25 and 4/29
      • Result(JGWDoc14941)

      • OMC chamber is most sensitive part, we performed the shaker injection test
        • Analysis is ongoing
    • Acoustic injection test
    • Increasing the laser power
      • Toward the stable operation is higher priority, so if possible we will try to increase the laser power
    • Glitch investigation
      • ETMY oplev glitch
        • Solved by install the temperature control system
      • ITMY suspension glitch
        • Try to install the IR/GR filter in front of oplev QPD
      • IPC glitch
        • It sometimes happened that the time series sometimes jump during observation example(klog24930)

        • Trial of slim down the real time model
        • Trial the glitch reason by Sawada-san
      • 37 Hz glitch
        • It detected in OMC signal klog25106

        • 37 Hz and its harmonics frequency excited
        • Seeing in hveto analysis(?)
        • The reason is not understand yet
    • Lock loss investigation
      • Ongoing
    • Silent run
      • Night silent run restarted.
  • 出張PEM injection (planning form)

Jurnal paper issue

Details are here!

  • Micro seismic analysis (Hoshino)
  • Acoustic reverberation time paper (Washimi+)
    • Suspend
    • Re-measurement before O4?
  • Tonga GIF paper
    • Referee comments

Preparation for O4

  • Environment will be fixed today
    • Turned off the cooler and heater at the same time
    • High resolution heater
  • Finalize the PEM installation
    • Accelerometer to C chamber and TMS table (Maybe postpone after O4a, lower priority)
    • Microphone to C chamber (Maybe postpone after O4a, lower priority)
  • Investigation of the PEM injection
    • Tapping test is higher priority
    • Acoustic injection preparation
      • Output sound smaller compared from O3GK's
    • Magnetic injection
      • After O4a?
  • Voltmeter preparation
    • We made the PEM channel
      • K1:PEM-VOLT_{PSL,IMCREFL,REFL,ISS,AS}_TABLE_{GND,FLOAT,DIFF}
      • K1:PEM-VOLT_OMC_CHAMBER_{GND,FLOAT,DIFF}
    • AC power monitoring
      • Bought transreducer
      • Prepared
    • DC power monitoring
      • Arrived at Kamioka
  • After O4
    • RF monitor with mokugo
    • Tiltmeter
    • RI detector
    • Newtonian noise
  • Discussion with DET members
    • Daily summary page PEM

Progress report

  • Yuzurihara
    • Pastavi
    • Data Quality Report slide

    • Data quality evaluation
  • Hoshino
    • Seismic motion analysis
  • Sato
    • Sound source analysid
  • Miyamoto
    • Weather analysis
  • Takatani
    • Calculation of Schumann resonance
  • Kume
    • Noise subtraction
  • Nishizawa
    • Water newtonian noise
    • Magnetic field analysis
  • Washimi
    • Daytime ground motion
    • Shaker injection OMC
    • Acoustic injection POP, REFL
  • Yokozawa
    • Morning silent run

Place for memo

KAGRA/Subgroups/PEM/Meeting/230512/Agenda (last edited 2023-05-12 07:17:12 by TakaakiYokozawa)