⇤ ← Revision 1 as of 2023-05-12 07:03:54
Size: 5482
Comment:
|
← Revision 2 as of 2023-05-12 07:17:12 ⇥
Size: 6396
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
* 2023/04/28(Fri) 17:00- | * 2023/05/12(Fri) 17:00- |
Line 7: | Line 7: |
* If you or your student/stuff have interested in the new PEM activity, please contact to me * New member |
|
Line 24: | Line 21: |
Line 36: | Line 34: |
* C2C support possible, if you have interested in having the presentation about PEM, please contact to me | |
Line 63: | Line 60: |
* PRFPMI locked * 1.2 W output from IMC (7 W when O3GK) * Best more than 1.0 Mpc (Yokoyama-san announced)[[https://dac.icrr.u-tokyo.ac.jp/KAGRA/DAWG/Detchar/klog/klog24923|latest sensitivity]] * Activities this week * ASC using wave front sensors and ADS, BPC and so on * Higher frequency WFS to reduce the fluctuation of IR transmittance power * Tapping test day * Tapping both end (Explained later) * CAL day * Analysis is ongoing, we may believe the BNS range * Overnight silent run * We can start the keep the observation state * Implementation of the good oplev record guardian * Implementation of the high bandwidth WFS control * Lock loss study |
* Status * Sensitivity 1.2 -1.4 Mpc [[https://dac.icrr.u-tokyo.ac.jp/KAGRA/DAWG/Detchar/klog/klog25188|latest]] * From the results of CAL/DET day at 4/26, calibration is consistent with previous measurement |
Line 79: | Line 64: |
* (Future) Interferometer characterization * Increasing the laser power * Continuous tapping test * Center area at Saturday * Alignment sensing and controls * Control filter optimization * Suspension control * Now evaluating the suspension control noise * Increased the laser power |
* Effect of earthquake at Noto peninsula * 5th May : Magnitude 6.7 at Noto peninsula * Several earthquakes are still happened * Interferometer is already recovered * Re-alignment at PSL room |
Line 89: | Line 70: |
* Commissioning work * Alignment sensing and controls * We need the PR3 global control to keep the stable opleration * Trial is ongoing * If trial is not succeeded until the O4a, we will sometimes perform manual alignment * OMC alignment control problem * Fixing is ongoing * If trial is not succeeded until the O4a, we will sometimes perform manual trouble shooting * Tapping test and shaker injection * We performed the tapping test(Vibration injection test by hand) at 4/25 and 4/29 * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=14941|Result(JGWDoc14941)]] * OMC chamber is most sensitive part, we performed the shaker injection test * Analysis is ongoing * Acoustic injection test * REFL table [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=25073|klog25073]] * POP table [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=25190|klog25190]] * Increasing the laser power * Toward the stable operation is higher priority, so if possible we will try to increase the laser power * Glitch investigation * ETMY oplev glitch * Solved by install the temperature control system * ITMY suspension glitch * Try to install the IR/GR filter in front of oplev QPD * IPC glitch * It sometimes happened that the time series sometimes jump during observation [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=24930|example(klog24930)]] * Trial of slim down the real time model * Trial the glitch reason by Sawada-san * 37 Hz glitch * It detected in OMC signal [[ https://klog.icrr.u-tokyo.ac.jp/osl/?r=25106|klog25106]] * 37 Hz and its harmonics frequency excited * Seeing in hveto analysis(?) * The reason is not understand yet * Lock loss investigation * Ongoing |
|
Line 90: | Line 105: |
* Currently, if the lock state is observation, this would be silent run |
* Night silent run restarted. |
Line 99: | Line 114: |
* writing | * Submit to CPC soon |
Line 172: | Line 187: |
* Results of tapping test [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=24958]] | * Daytime ground motion * Shaker injection OMC * Acoustic injection POP, REFL |
Line 176: | Line 193: |
* Oplev glitch investigation |
Weekly PEM meeting
- 2023/05/12(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
General announcement
- O4a run will start from 24th May
- 4 weeks run it will finish 21st Junne
- Mostly onsite and Mitaka member will have a shift for observation
- Not disagree that offsite member come KAGRA during run
- CAL/DET week from 17th May
- We will stop the innterferometer update
- SEO budget to PEM is limiting
- KAGRA visiting plan
- Now, the budget of KAGRA is limiting, but if you want to visit Kamioka, please contact to Yokozawa
Meeting and Conference issue
XIII Einstein Telescope Symposium https://indico.ego-gw.it/event/562/abstracts/
- May 8–12, in Cagliari Italy
- Washimi (online) : Schumann resonance amprification
- Somiya (online) : Water NN
- GWADW 2023
- 21 - 27 May, Elba, Italy
- One day could be the day for "KAGRA commissioning support" and "experiences/results in KAGRA" presentation
- The 3rd generation can be a large topics because ET is now proceeding.
- 10th KIW
- 29,30th May
- Washimi (SOC)
- Hoshino
ICRC 2023 url
- Nagoya
- Deadline 2/20
- Yokozawa will present about KAGRA PEM (oral)
- Washimi will present about Schumann resonance and SGWB
- JPS meeting (Tohoku U)
- Limiting hotel
Other meetings url
If you have some presentation about PEM related, please contact to me.
Business travel
- Depending on the situation of COVID-19
- To Kamioka
- No
- From Kamioka
- No
General issue
- Status
Sensitivity 1.2 -1.4 Mpc latest
- From the results of CAL/DET day at 4/26, calibration is consistent with previous measurement
- Effect of earthquake at Noto peninsula
- 5th May : Magnitude 6.7 at Noto peninsula
- Several earthquakes are still happened
- Interferometer is already recovered
- Re-alignment at PSL room
- 5th May : Magnitude 6.7 at Noto peninsula
- Commissioning work
- Alignment sensing and controls
- We need the PR3 global control to keep the stable opleration
- Trial is ongoing
- If trial is not succeeded until the O4a, we will sometimes perform manual alignment
- OMC alignment control problem
- Fixing is ongoing
- If trial is not succeeded until the O4a, we will sometimes perform manual trouble shooting
- We need the PR3 global control to keep the stable opleration
- Tapping test and shaker injection
- We performed the tapping test(Vibration injection test by hand) at 4/25 and 4/29
- OMC chamber is most sensitive part, we performed the shaker injection test
- Analysis is ongoing
- Acoustic injection test
- Increasing the laser power
- Toward the stable operation is higher priority, so if possible we will try to increase the laser power
- Glitch investigation
- ETMY oplev glitch
- Solved by install the temperature control system
- ITMY suspension glitch
- Try to install the IR/GR filter in front of oplev QPD
- IPC glitch
It sometimes happened that the time series sometimes jump during observation example(klog24930)
- Trial of slim down the real time model
- Trial the glitch reason by Sawada-san
- 37 Hz glitch
It detected in OMC signal klog25106
- 37 Hz and its harmonics frequency excited
- Seeing in hveto analysis(?)
- The reason is not understand yet
- ETMY oplev glitch
- Lock loss investigation
- Ongoing
- Silent run
- Night silent run restarted.
- Alignment sensing and controls
出張PEM injection (planning form)
Jurnal paper issue
- Micro seismic analysis (Hoshino)
- Submit to CPC soon
- Acoustic reverberation time paper (Washimi+)
- Suspend
- Re-measurement before O4?
- Tonga GIF paper
- Referee comments
Preparation for O4
- Environment will be fixed today
- Turned off the cooler and heater at the same time
- High resolution heater
- Finalize the PEM installation
- Accelerometer to C chamber and TMS table (Maybe postpone after O4a, lower priority)
- Microphone to C chamber (Maybe postpone after O4a, lower priority)
- Investigation of the PEM injection
- Tapping test is higher priority
- Acoustic injection preparation
- Output sound smaller compared from O3GK's
- Magnetic injection
- After O4a?
- Voltmeter preparation
- We made the PEM channel
- K1:PEM-VOLT_{PSL,IMCREFL,REFL,ISS,AS}_TABLE_{GND,FLOAT,DIFF}
- K1:PEM-VOLT_OMC_CHAMBER_{GND,FLOAT,DIFF}
- AC power monitoring
- Bought transreducer
- Prepared
- DC power monitoring
- Arrived at Kamioka
- We made the PEM channel
- After O4
- RF monitor with mokugo
- Tiltmeter
- RI detector
- Newtonian noise
- Discussion with DET members
- Daily summary page PEM
Progress report
- Yuzurihara
- Pastavi
Data Quality Report slide
- Data quality evaluation
- Hoshino
- Seismic motion analysis
- Sato
- Sound source analysid
- Miyamoto
- Weather analysis
- Takatani
- Calculation of Schumann resonance
- Kume
- Noise subtraction
- Nishizawa
- Water newtonian noise
- Magnetic field analysis
- Washimi
- Daytime ground motion
- Shaker injection OMC
- Acoustic injection POP, REFL
- Yokozawa
- Morning silent run