Differences between revisions 1 and 2
Revision 1 as of 2023-05-19 08:34:28
Size: 4883
Comment:
Revision 2 as of 2023-05-19 16:56:45
Size: 5241
Comment:
Deletions are marked like this. Additions are marked like this.
Line 155: Line 155:
  * Acoustic injection re-analysis
 
  * PEM injection sumnmary [[KAGRA/Subgroups/PEM/PEMinjection/O4]]
  * Acoustic injection analysis
    * Comparison of the different locations [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=25313]]
    * OMC area [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=25304]]
    * REFL area [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=25311]]
    * MCF area [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=25312]]

Weekly PEM meeting

General announcement

  • O4a run will start from 24th May
    • 4 weeks run it will finish 21st June
    • Mostly onsite and Mitaka member will have a shift for observation
      • Not disagree that offsite member come KAGRA during run
    • CAL/DET week from 17th May -
      • We will stop the interferometer update
  • SEO budget to PEM is limiting
  • KAGRA visiting plan
    • If you want to visit Kamioka, please contact to Yokozawa

Meeting and Conference issue

  • XIII Einstein Telescope Symposium https://indico.ego-gw.it/event/562/abstracts/

    • May 8–12, in Cagliari Italy
    • Washimi (online) : Schumann resonance amprification
    • Somiya (online) : Water NN
  • GWADW 2023
    • 21 - 27 May, Elba, Italy
    • One day could be the day for "KAGRA commissioning support" and "experiences/results in KAGRA" presentation
    • The 3rd generation can be a large topics because ET is now proceeding.
  • 10th KIW
    • 29,30th May
    • Washimi (SOC)
    • Hoshino
  • ICRC 2023 url

    • Nagoya
    • Deadline 2/20
    • Yokozawa will present about KAGRA PEM (oral)
    • Washimi will present about Schumann resonance and SGWB
  • JPS meeting (Tohoku U)
    • Limiting hotel
  • Other meetings url

If you have some presentation about PEM related, please contact to me.

Business travel

  • Depending on the situation of COVID-19
  • To Kamioka
    • Hoshino(planned)
  • From Kamioka
    • No

General issue

  • Status
  • Commissioning work
    • Manual alignment
      • PR3 : We will sometimes perform manual alignment
      • OMC : Check the control signals
      • manual(JGWDoc14969)

    • Tapping test and shaker injection
      • Washimi-san summarized the shaker/acoustic injectionswiki

      • 30 min acoustic injection test with one frequency
        • Data for noise subtraction
    • Glitch investigation
      • ITMY suspension glitch
        • Try to install the IR/GR filter in front of oplev QPD
      • IPC glitch
        • It sometimes happened that the time series sometimes jump during observation example(klog24930)

    • Lock loss investigation
      • Ongoing
    • Silent run
      • Keep the interferometer when no CAL/DET/PEM activities
    • Summary page update for O4a
  • 出張PEM injection (planning form)

Jurnal paper issue

Details are here!

  • Micro seismic analysis (Hoshino)
  • Acoustic reverberation time paper (Washimi+)
    • Suspend
    • Re-measurement before O4?
  • Tonga GIF paper
    • Referee comments

Preparation for O4

  • Environment will be fixed
    • Temperature became lower due to no human activity inside the experimental area(?)
  • Finalize the PEM installation
    • Accelerometer to C chamber and TMS table (Maybe postpone after O4a, lower priority)
    • Microphone to C chamber (Maybe postpone after O4a, lower priority)
  • Investigation of the PEM injection
    • Magnetic injection
      • After O4a?
  • Voltmeter preparation
    • AC power monitor installation
    • DC power monitor installation
  • After O4
    • RF monitor with mokugo
    • Tiltmeter
    • RI detector
    • Newtonian noise
  • Discussion with DET members
    • Daily summary page PEM

Progress report

Place for memo

KAGRA/Subgroups/PEM/Meeting/230519/Agenda (last edited 2023-05-19 16:56:45 by tatsuki.washimi)