Differences between revisions 2 and 4 (spanning 2 versions)
Revision 2 as of 2023-06-08 16:16:13
Size: 792
Comment:
Revision 4 as of 2023-06-08 17:42:51
Size: 1061
Comment:
Deletions are marked like this. Additions are marked like this.
Line 18: Line 18:
  * KAGRA detector status & Update of the KAGRA PEM from last meeting (Yokozawa)   * KAGRA detector status & Update of the KAGRA PEM from last meeting (Yokozawa)[[attachment:VKPEM230608.pdf|pdf]]

  * KAGRA schedule after O4a
   * Not fully decided yet
   * After the O4a run:
    * change to new prepared high power laser (First motivation is stabilize the temperature control)
    * OMC chamber treatment (Washimi-san's slide)
    * Preparing toward the cooling down
Line 25: Line 33:
  * Future PEM meeting -> April focusing on the PEM noise hunting
  * ET SPB meeting?

  * Next LVK meeting at Toyama, Japan

Virgo-KAGRA PEM meeting

Agenda

  • Publication issue
    • Seismic motion paper
      • Circulate to KAGRA collaboration
  • Status reports
    • KAGRA detector status & Update of the KAGRA PEM from last meeting (Yokozawa)pdf

    • KAGRA schedule after O4a
      • Not fully decided yet
      • After the O4a run:
        • change to new prepared high power laser (First motivation is stabilize the temperature control)
        • OMC chamber treatment (Washimi-san's slide)
        • Preparing toward the cooling down
    • Virgo status if there is (Irene)
  • KAGRA noise investigation (Washimi)
  • Others
    • Next LVK meeting at Toyama, Japan

KAGRA/Subgroups/PEM/Meeting/230608/Agenda (last edited 2023-06-08 19:37:15 by tatsuki.washimi)