Differences between revisions 1 and 2
Revision 1 as of 2023-06-09 07:39:11
Size: 3862
Comment:
Revision 2 as of 2023-06-09 07:48:09
Size: 3773
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
 * 2023/06/02(Fri) 17:00-  * 2023/06/09(Fri) 17:00-
Line 33: Line 33:
  * LVK meeting at Toyama
   *
Line 34: Line 37:
   * Start the abstract submission
    * Abstract submission limit : 7th June, 14:00(JST)
Line 37: Line 38:
    * Yokozawa (Status(?))
    * Washimi (Noise hunting(?))
    * Hoshino (Microseismic forecast)
    * Other speaker?
    * Yokozawa (Status)
    * Washimi (Noise hunting)
    * Hoshino (Seismic forecast)

Weekly PEM meeting

General announcement

  • O4a run started from 24th May
    • 4 weeks run it will finish 21st June
  • SEO budget to PEM is limiting
  • KAGRA visiting plan
    • If you want to visit Kamioka, please contact to Yokozawa
  • Kiban S application
    • 高精度レーザーひずみ計観測網の広域展開による地殻活動の時空間マルチスケール観測
    • Yokozawa and Washimi would be co-investigator, about KAGRA environment and strain-mater

Meeting and Conference issue

  • 10th KIW
    • 29,30th May
    • Washimi (SOC)
    • Hoshino
  • ICRC 2023 url

    • Nagoya
    • Deadline 2/20
    • Yokozawa will present about KAGRA PEM (oral)
    • Washimi will present about Schumann resonance and SGWB
  • LVK meeting at Toyama
  • JPS meeting (Tohoku U)
    • Presentation about PEM
      • Yokozawa (Status)
      • Washimi (Noise hunting)
      • Hoshino (Seismic forecast)
  • Other meetings url

If you have some presentation about PEM related, please contact to me.

Business travel

  • Depending on the situation of COVID-19
  • To Kamioka
    • Hoshino(planned)
  • From Kamioka
    • Washimi (KIW)

General issue

  • Status
    • Sensitivity 1.1~1.4 Mpc latest

    • Depending on the PR3 alignment
    • IPC glitch
      • The rate became smaller after change the process of the detchar script
      • Currently, appeared again
    • Lock loss investigation
      • Ongoing
    • Summary page update for O4a
  • 出張PEM injection (planning form)

Jurnal paper issue

Details are here!

  • Micro seismic analysis (Hoshino)
  • Acoustic reverberation time paper (Washimi+)
    • Suspend
    • Re-measurement before O4?
  • Tonga GIF paper
    • Referee comments

Preparation for O4

  • Check the seismic motion around mozumi area
    • After Washimi-san back to Japan
    • Daytime ground motion
  • Start the O4a observation
    • Fixed the PRMs
    • No portable PEMs
  • Investigation of the PEM injection
    • Magnetic injection
      • After O4a?
  • Voltmeter preparation
    • AC power monitor installation
    • DC power monitor installation
  • After O4
    • RF monitor with mokugo
    • Tiltmeter
    • RI detector
    • Newtonian noise
  • Discussion with DET members
    • Daily summary page PEM

Progress report

  • Yuzurihara
    • Pastavi
    • Data Quality Report slide

    • Data quality evaluation
  • Hoshino
    • Seismic motion analysis
  • Sato
    • Sound source analysid
  • Miyamoto
    • Weather analysis
  • Takatani
    • Calculation of Schumann resonance
  • Kume
    • Noise subtraction
  • Nishizawa
    • Water newtonian noise
    • Magnetic field analysis
  • Washimi
  • Yokozawa
    • PR3 oplev

Place for memo

KAGRA/Subgroups/PEM/Meeting/230609/Agenda (last edited 2023-06-09 07:55:36 by TakaakiYokozawa)