Size: 3793
Comment:
|
← Revision 4 as of 2023-06-09 07:55:36 ⇥
Size: 3955
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 37: | Line 37: |
* 16-19 September 2023 | |
Line 52: | Line 53: |
* Washimi (KIW) | * No |
Line 58: | Line 59: |
* Situation didn't change from last week | |
Line 69: | Line 71: |
* Schedule after O4a * Discussing |
|
Line 85: | Line 90: |
* Referee comments | * Accepted |
Line 93: | Line 98: |
* Schumann resonance measurement |
|
Line 95: | Line 102: |
* No portable PEMs | * PEM working check [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=25527|klog25527]] |
Line 141: | Line 148: |
* PEM injection sumnmary [[KAGRA/Subgroups/PEM/PEMinjection/O4]] * Street view |
* PEM MAP * Schumann resonance measurement |
Line 145: | Line 152: |
* PR3 oplev |
* Post O4a measurement |
Weekly PEM meeting
- 2023/06/09(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
General announcement
- O4a run started from 24th May
- 4 weeks run it will finish 21st June
- SEO budget to PEM is limiting
- KAGRA visiting plan
- If you want to visit Kamioka, please contact to Yokozawa
- Kiban S application
- 高精度レーザーひずみ計観測網の広域展開による地殻活動の時空間マルチスケール観測
- Yokozawa and Washimi would be co-investigator, about KAGRA environment and strain-mater
Meeting and Conference issue
- 10th KIW
- 29,30th May
- Washimi (SOC)
- Hoshino
ICRC 2023 url
- Nagoya
- Deadline 2/20
- Yokozawa will present about KAGRA PEM (oral)
- Washimi will present about Schumann resonance and SGWB
- LVK meeting at Toyama
- 11-14 September 2023
- JPS meeting (Tohoku U)
- 16-19 September 2023
- Presentation about PEM
- Yokozawa (Status)
- Washimi (Noise hunting)
- Hoshino (Seismic forecast)
Other meetings url
If you have some presentation about PEM related, please contact to me.
Business travel
- Depending on the situation of COVID-19
- To Kamioka
- Hoshino(planned)
- From Kamioka
- No
General issue
- Status
- Schedule after O4a
- Discussing
出張PEM injection (planning form)
Jurnal paper issue
- Micro seismic analysis (Hoshino)
- Submit to CPC soon
- Acoustic reverberation time paper (Washimi+)
- Suspend
- Re-measurement before O4?
- Tonga GIF paper
- Accepted
Preparation for O4
- Check the seismic motion around mozumi area
- After Washimi-san back to Japan
- Daytime ground motion
- Schumann resonance measurement
- Start the O4a observation
- Fixed the PRMs
PEM working check klog25527
- Investigation of the PEM injection
- Magnetic injection
- After O4a?
- Magnetic injection
- Voltmeter preparation
- AC power monitor installation
- DC power monitor installation
- After O4
- RF monitor with mokugo
- Tiltmeter
- RI detector
- Newtonian noise
- Discussion with DET members
- Daily summary page PEM
Progress report
- Yuzurihara
- Pastavi
Data Quality Report slide
- Data quality evaluation
- Hoshino
- Seismic motion analysis
- Sato
- Sound source analysid
- Miyamoto
- Weather analysis
- Takatani
- Calculation of Schumann resonance
- Kume
- Noise subtraction
- Nishizawa
- Water newtonian noise
- Magnetic field analysis
- Washimi
- PEM MAP
- Schumann resonance measurement
- Yokozawa
- Post O4a measurement