Line 2: | Line 2: |
* 2023/06/30(Fri) 17:00- | * 2023/07/07(Fri) 17:00- |
Line 16: | Line 16: |
* CAL/DET week now * Noise budget measurement |
* CAL/DET week finished * restarted the commissioning toward the O4b |
Line 21: | Line 21: |
Line 33: | Line 31: |
* KAGRA F2F meeting on Sep. 15 | * KAGRA F2F meeting on Sep. 15 |
Line 59: | Line 57: |
* CAL/DET week * Calibration measurement done : No significant change from previous measurement |
|
Line 66: | Line 61: |
* Peak identification | |
Line 72: | Line 68: |
* IPC glitch * Mostly solved * NIC latency for myrinet was 10us on k1dc0, I set as 1us. * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=25698|klog25698]] * 1 event/day(?) |
|
Line 81: | Line 71: |
* New high power laser replacement * Replacing itself was performed, but the laser power was instable * Gave up the replacement and backed to the original one |
|
Line 82: | Line 76: |
* CAL/DET week (1 week) * Done * Switch to high power laser (1 week) * 7/4-7/9 * Check the sensitivity * Several additional measurements (option) |
|
Line 91: | Line 78: |
* 7/10 -16 | * 7/10 - 16 |
Line 94: | Line 81: |
* PD noise evaluation | |
Line 96: | Line 84: |
* This weekend (6/30-?) * There are some cooling trouble at EY * Turned off ION pump, TMP * Same timing with switch high power laser * IX, IY, EY. Not perform EX |
* Turned off (6/30) * Turned on the TMP and temperature adjustment * Turned on again |
Weekly PEM meeting
- 2023/07/07(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
General announcement
- Open the registration LVK meeting@Toyama
- 2023/09/11-15
- Including the F2F meeting
- Welcome the visitor
- O4a run finished successfully
- 4 weeks run has been finished on 21st June 8:00(JST)
- CAL/DET week finished
- restarted the commissioning toward the O4b
- KAGRA visiting plan
- If you want to visit Kamioka, please contact to Yokozawa
Meeting and Conference issue
ICRC 2023 url 7/26 - 8/3
- Nagoya
- Yokozawa will present about KAGRA PEM (oral)
- Washimi will present about Schumann resonance and SGWB (oral)
- LVK meeting at Toyama
- 11-14 September 2023
- KAGRA F2F meeting on Sep. 15
- JPS meeting (Tohoku U)
- 16-19 September 2023
- Presentation about PEM
- Yokozawa (Status)
- Washimi (Noise hunting)
- Hoshino (Seismic forecast)
Other meetings url
If you have some presentation about PEM related, please contact to me.
Business travel (except for conferences)
- To Kamioka
- Hoshino(planned)
- From Kamioka
- No
General issue
- Status
Sensitivity 1.1~1.4 Mpc latest
Summary url
- Noise budget measurement
- Interferometer (MICH, PRCL, ISS, CARM, ...)
- Suspensions
- PEMs
- Peak identification
- etc.
- Some measurement results
Dark noise and shot noise klog25787
DARM sensitive noises klog25784
Acoustic injection JGWDoc15061
- Lock loss investigation
- Ongoing
- New high power laser replacement
- Replacing itself was performed, but the laser power was instable
- Gave up the replacement and backed to the original one
- Schedule after O4a
- Open the OMC chamber (1 week)
- 7/10 - 16
- Set the geophone inside the chamber and evaluate the vibration
- Treatment the ghost beam
- PD noise evaluation
- Turned off and on the cryocooler (1 week)
- Turned off (6/30)
- Turned on the TMP and temperature adjustment
- Turned on again
- Turned off (6/30)
- Commissioning toward 10 Mpc
- Open the OMC chamber (1 week)
出張PEM injection (planning form)
Jurnal paper issue
- Micro seismic analysis (Hoshino)
- Submited to CQG
- Acoustic reverberation time paper (Washimi+, Sato?)
- Suspend
- Re-measurement before O4?
- TCam paper
- Writing ongoing
Preparation for O4b
- Check the seismic motion around mozumi area
- Daytime ground motion
- It may appeared in DARM sensitivity (SR3?)
- Schumann resonance measurement
- Ongoing
- Acoustic injection post O4a
- Reported later
- Investigation of the PEM injection
- Magnetic injection
- After O4a?
- Magnetic injection
- Voltmeter preparation
- AC power monitor installation
- DC power monitor installation
- After O4
- RF monitor with mokugo
- Tiltmeter
- RI detector
- Newtonian noise
- Discussion with DET members
- Daily summary page PEM
Progress report
- Yuzurihara
- Pastavi
Data Quality Report slide
- Data quality evaluation
- Hoshino
- Seismic motion analysis
- Sato
- Sound source analysid
- Miyamoto
- Weather analysis
- Takatani
- Applying the deepclean
- Calculation of Schumann resonance
- Kume
PR3 line injection klog25670
- Noise subtraction
- Nishizawa
- Water newtonian noise
- Magnetic field analysis
- Washimi
Schumann resonance study JGW-G2315046
- Yokozawa
- Lock loss study O4a
Summary of acoustic injection test post O4a JGWDoc15061