⇤ ← Revision 1 as of 2023-08-18 08:49:50
Size: 4197
Comment:
|
Size: 5290
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
* 2023/08/04(Fri) 17:00- | * 2023/08/18(Fri) 17:00- |
Line 8: | Line 8: |
* New KSC chair and vice-chair |
|
Line 9: | Line 11: |
* Poster abstract submission * ?? |
|
Line 18: | Line 22: |
* ICRC 2023 [[https://amarys-jtb.jp/2023icrc/|url ]] 7/26 - 8/3 * Nagoya * Yokozawa will present about KAGRA PEM (oral) [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=14827|proceedings]] * Washimi will present about Schumann resonance and SGWB (oral) |
|
Line 48: | Line 47: |
* Sorry, I could not follow all thing at current two weeks | * Cooling down * EX : Achieved 20 K in IM * Monitored the height by MNV oplev and TCam * The SUM value of MNV oplev decreased with temperature, that turned out the clipping by the viewport of radiation shield [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=26232|klog26232]] * Now recovered, but SUM decreasing continued * Serious frosting and finesse down detected * Turned on the heater at IM, after increasing 30 K, the finesse recovered * Still some frosting at AR side from picture [[ https://klog.icrr.u-tokyo.ac.jp/osl/?r=26336|klog26336]] and oplev sum[[ https://klog.icrr.u-tokyo.ac.jp/osl/?r=26308|klog26308]] * During PRFPMI locked, the temperature of IM gradually increased[[https://klog.icrr.u-tokyo.ac.jp/osl/?r=26358|klog26358]]. * IX, IY, EY ongoing : about 110 K in IM (2023/08/18) * Temperature change [[https://gwdet.icrr.u-tokyo.ac.jp/~controls/trendMon/finesse.html|url]] * Vacuum level trouble * EX : performance of one cryocooler became worse * No serious damage to the test mass * Plan to restart it around LVK meeting(September) * Yarm * Y-21 vacuum trouble * Now, by turning on the TMP, keep good vacuum level |
Line 51: | Line 69: |
* Some temperature oscillation when operating the new HPL | * Temperature drift would be smaller by tuning the temperature control * But if we increased the output laser power from PSL room, IMC cannot be locked. * Now operating the current old laser |
Line 53: | Line 73: |
* Increase the laser amp (current laser) * ~15 W at PMC |
* Alignment inside the PSL room * PMC alignment done(No so serious change) * GR alignment done (Increased the beam power) |
Line 56: | Line 77: |
* Interferometer operation with high power * Ongoing * Leak at OMC / Yarm * OMC leak stopped after removing the geophone * Y arm (and Yend) leak * Trouble at OMC DCPD * Repair at October? * Start the cooling down * X : 22 K * Other : 200 K * Optical table alignment * POP table |
* Interferometer operation * After checking the POP and REFL table again, and found one BS flipped. * Then, PRFPMI RF became more stable (One night lock) |
Line 74: | Line 82: |
* Cabling | * Outside magnetometer * DAQ system trouble? Washimi-san sent to company |
Line 76: | Line 85: |
* Re-cabling for OMC speaker | |
Line 78: | Line 88: |
* No problem in AC power supplying | |
Line 79: | Line 90: |
* Commissioning toward 10 Mpc |
Weekly PEM meeting
- 2023/08/18(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
General announcement
- New KSC chair and vice-chair
- Open the registration LVK meeting@Toyama
- Poster abstract submission
- ??
- 2023/09/11-15
- Including the F2F meeting
- Welcome the visitor
- Poster abstract submission
- KAGRA visiting plan
- If you want to visit Kamioka, please contact to Yokozawa
Meeting and Conference issue
- LVK meeting at Toyama
- 11-14 September 2023
- KAGRA F2F meeting on Sep. 15
- JPS meeting (Tohoku U)
- 16-19 September 2023
- Presentation about PEM
- Yokozawa (Status)
- Washimi (Noise hunting)
- Hoshino (Seismic forecast)
Other meetings url
If you have some presentation about PEM related, please contact to me.
Business travel (except for conferences)
- To Kamioka
- Hoshino(8/8 - 10)
- From Kamioka
- No
General issue
- Cooling down
- EX : Achieved 20 K in IM
- Monitored the height by MNV oplev and TCam
The SUM value of MNV oplev decreased with temperature, that turned out the clipping by the viewport of radiation shield klog26232
- Now recovered, but SUM decreasing continued
- Serious frosting and finesse down detected
- Monitored the height by MNV oplev and TCam
- IX, IY, EY ongoing : about 110 K in IM (2023/08/18)
Temperature change url
- EX : Achieved 20 K in IM
- Vacuum level trouble
- EX : performance of one cryocooler became worse
- No serious damage to the test mass
- Plan to restart it around LVK meeting(September)
- Yarm
- Y-21 vacuum trouble
- Now, by turning on the TMP, keep good vacuum level
- Y-21 vacuum trouble
- EX : performance of one cryocooler became worse
- New high power laser replacement
- Temperature drift would be smaller by tuning the temperature control
- But if we increased the output laser power from PSL room, IMC cannot be locked.
- Now operating the current old laser
- Alignment inside the PSL room
- PMC alignment done(No so serious change)
- GR alignment done (Increased the beam power)
- Interferometer operation
- After checking the POP and REFL table again, and found one BS flipped.
- Then, PRFPMI RF became more stable (One night lock)
- After checking the POP and REFL table again, and found one BS flipped.
- PEM tasks
- Outside magnetometer
- DAQ system trouble? Washimi-san sent to company
- Acoustic noise at OMC
- Re-cabling for OMC speaker
- AC power check at Yend
- SUM value of the MNV oplev decreased
- No problem in AC power supplying
- Outside magnetometer
出張PEM injection (planning form)
Jurnal paper issue
- Micro seismic analysis (Hoshino)
- Submited to CQG
- ICRC Proceedings
- Acoustic reverberation time paper (Washimi+, Sato?)
- Suspend
- Re-measurement before O4?
- TCam paper
- Writing ongoing
Preparation for O4b
- Check the seismic motion around mozumi area
- Daytime ground motion
- It may appeared in DARM sensitivity (SR3?)
- Schumann resonance measurement
- Ongoing
- Investigation of the PEM injection
- Magnetic injection
- After O4a?
- Magnetic injection
- Voltmeter preparation
- AC power monitor installation
- DC power monitor installation
- After O4
- RF monitor with mokugo
- Tiltmeter
- RI detector
- Newtonian noise
- Discussion with DET members
- Daily summary page PEM
Progress report
- Yuzurihara
- Pastavi
Data Quality Report slide
- Data quality evaluation
- Hoshino
- Seismic motion analysis
- Sato
- Sound source analysid
- Miyamoto
- Weather analysis
- Takatani
- Applying the deepclean
- Calculation of Schumann resonance
- Kume
PR3 line injection klog25670
- Noise subtraction
- Nishizawa
- Water newtonian noise
- Magnetic field analysis
- Washimi
Schumann resonance study JGW-G2315046
- Yokozawa