Differences between revisions 1 and 2
Revision 1 as of 2023-08-25 09:01:13
Size: 4513
Comment:
Revision 2 as of 2023-08-25 16:04:18
Size: 4663
Comment:
Deletions are marked like this. Additions are marked like this.
Line 19: Line 19:
  * If you want to visit Kamioka, please contact to Yokozawa   * If you want to visit Kamioka, please contact with Yokozawa
Line 43: Line 43:
  * Anoop (9/3-10 + LVK)
  * Chou & Yeh (9/10 + LVK + 9/16-23?)
  * Takatani (LVK + 9/16-23?)
Line 44: Line 47:
  * Yokozawa (9/11 - 9/20(?))   * Yokozawa (9/11-15 LVK, 9/16-20? JPS)
  * Washimi (9/11-15 LVK, 9/16-19 JPS)

Weekly PEM meeting

General announcement

  • Open the registration LVK meeting@Toyama
    • Poster abstract submission
      • 27th August
    • 2023/09/11-15
    • Including the F2F meeting
    • url

    • Welcome the visitor
      • Deep Clean member
      • Kamiel and Anoop
  • KAGRA visiting plan
    • If you want to visit Kamioka, please contact with Yokozawa

Meeting and Conference issue

  • LVK meeting at Toyama
    • 11-14 September 2023
    • KAGRA F2F meeting on Sep. 15
  • JPS meeting (Tohoku U)
    • 16-19 September 2023
    • Presentation about PEM
      • Yokozawa (Status)
      • Washimi (Noise hunting)
      • Hoshino (Seismic forecast)
  • Other meetings url

If you have some presentation about PEM related, please contact to me.

Business travel (except for conferences)

  • To Kamioka
    • Sato (8/29 - 9/1)
    • Miyamoto (8/30 - 9/9)
    • Anoop (9/3-10 + LVK)
    • Chou & Yeh (9/10 + LVK + 9/16-23?)

    • Takatani (LVK + 9/16-23?)
  • From Kamioka
    • Yokozawa (9/11-15 LVK, 9/16-20? JPS)
    • Washimi (9/11-15 LVK, 9/16-19 JPS)

General issue

  • Cooling down
    • EX : Keep 30 K in IM
      • Monitored the height by MNV oplev and TCam
        • Comparing the value between TCam, MNV oplev and height adjustment by Tower part
    • IX, IY, EY ongoing : about 95 K in IM (2023/08/25)
      • Temperature change url

      • Discussing when we start the cooling down of mirror
  • New high power laser replacement
    • Temperature : now more stable
    • Some frequency noise at high frequency (Need the tune the working temperature)
    • Detail check will be performed next week
  • Interferometer operation
    • PRFPMI with DC readout trial : done but not stable
    • From the schedule of commissioning, we tried to lock with FPMI and succeeded.
  • New IP control
    • Ongoing
  • Q measurement for the 30 K sapphire
    • Continued
  • New PD installation for evaluating the CARM noise
    • Done
  • s/p pol PD installation to TMS
    • TMSY done
  • PEM tasks
    • Outside magnetometer
      • ADU fixed by company
    • TMS PEM preparation
      • TMSY cabling done, installation not finished
      • TMSX not done

Jurnal paper issue

Details are here!

  • Micro seismic analysis (Hoshino)
  • ICRC Proceedings
  • Acoustic reverberation time paper (Washimi+, Sato?)
    • Suspend
    • Re-measurement before O4?
  • TCam paper
    • Writing ongoing

Preparation for O4b

  • Check the seismic motion around mozumi area
    • Daytime ground motion
    • It may appeared in DARM sensitivity (SR3?)
  • Schumann resonance measurement
    • Ongoing
  • Investigation of the PEM injection
    • Magnetic injection
      • After O4a?
  • Voltmeter preparation
    • AC power monitor installation
    • DC power monitor installation
  • After O4
    • RF monitor with mokugo
    • Tiltmeter
    • RI detector
    • Newtonian noise
  • Discussion with DET members
    • Daily summary page PEM

Progress report

  • Yuzurihara
    • Pastavi
    • Data Quality Report slide

    • Data quality evaluation
  • Hoshino
    • Seismic motion analysis
    • Question from media
  • Sato
    • Sound source analysis
    • Plan for next week
  • Miyamoto
    • Weather analysis
  • Takatani
    • Applying the deepclean
    • Calculation of Schumann resonance
  • Kume
    • PR3 line injection klog25670

    • Noise subtraction
  • Nishizawa
    • Water newtonian noise
    • Magnetic field analysis
  • Washimi
    • Air pressure at various place
    • Environmental noise at CLIO with power outage
  • Yokozawa
    • Mirror height check

Place for memo

KAGRA/Subgroups/PEM/Meeting/230825/Agenda (last edited 2023-08-25 16:09:13 by tatsuki.washimi)