Size: 4215
Comment:
|
← Revision 5 as of 2023-09-29 17:04:48 ⇥
Size: 4098
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
* 2023/09/22(Fri) 17:00- | * 2023/09/29(Fri) 17:00- |
Line 8: | Line 8: |
* Open the registration LVK meeting@Toyama * 2023/09/11-15 * Including the F2F meeting * [[https://www.resceu.s.u-tokyo.ac.jp/symposium/LVK2023toyama/index.php|url]] * Welcome the visitor * Deep Clean member * Kamiel and Anoop * Discussion with Deep Clean member * Afternoon 10th Sep. * Near the Toyama station (10th Sep. 13:00 - 16:00 [[https://www.wohlfahrt-toyama.co.jp/company#map|url]]) |
* VK PEM meeting * [[https://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/Meeting/230926/Agenda|url]] * Next 19th Oct.(Thu) |
Line 24: | Line 17: |
* LVK meeting at Toyama * 11-14 September 2023 * Yokozawa will prepare the poster about introduction of the KAGRA PEM * Yokozawa will have a parallel session in IS(12th morning) * KAGRA F2F meeting on Sep. 15 * JPS meeting (Tohoku U) * 16-19 September 2023 * Presentation about PEM * Yokozawa (Status) * Washimi (Noise hunting) * Hoshino (Seismic forecast) |
* ET SCB/SPB/ANM workshop @ Nikhef, December 6-7 * Washimi will attend in person * satellite meeting before/after the workshop? |
Line 44: | Line 28: |
* Chou & Yeh (9/10 + LVK + 9/16-23?) * Takatani (LVK + 9/10) |
* Chou & Yeh (9/10 + LVK + 9/16-23, 28) * Miyamoto (10/4 - 11/3) |
Line 47: | Line 31: |
* Washimi (10/11-14? Amsteldam) * Washimi (10/28 Mitaka) |
* Washimi (10/27-28 Mitaka) |
Line 51: | Line 34: |
* Washimi (11/6-9? OMU) |
* Washimi (11/4-5 Waseda) * Washimi (11/6-9? OMU) * Washimi (12/4-8? Amsteldam) |
Line 56: | Line 41: |
* EX : Warming up for maintain the cooler | * EX : Warming up for maintain the cooler -> Done * GV opened and started cooling down |
Line 58: | Line 44: |
* VAC trouble X-27 * The reason unknown, shutdown the vacuum pump |
|
Line 61: | Line 49: |
* Discussing when we start the cooling down of mirror | * After starting the cooling down after measuring the Q-value of sapphire fiber |
Line 71: | Line 59: |
* Strategy for noise hunting * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=26848|klog26848]] |
|
Line 99: | Line 90: |
* Ongoing | * Restart (plan today) * Evaluation of newtonian noise |
Line 127: | Line 120: |
* Question from media | |
Line 130: | Line 122: |
* Activity this week | |
Line 149: | Line 140: |
* Air pressure at various places * Portable seismometer measurement |
* seismometer [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=26958|klog26958]], [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=26960|klog26960]] * Magnetometer * SGWB + Schumann resonance * Acoustic NN estimation |
Line 153: | Line 146: |
* Mirror height check | * Lock loss due to earthquake |
Weekly PEM meeting
- 2023/09/29(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
General announcement
- VK PEM meeting
- Next 19th Oct.(Thu)
- KAGRA visiting plan
- If you want to visit Kamioka, please contact with Yokozawa
Meeting and Conference issue
- ET SCB/SPB/ANM workshop @ Nikhef, December 6-7
- Washimi will attend in person
- satellite meeting before/after the workshop?
Other meetings url
If you have some presentation about PEM related, please contact to me.
Business travel (except for conferences)
- To Kamioka
Chou & Yeh (9/10 + LVK + 9/16-23, 28)
- Miyamoto (10/4 - 11/3)
- From Kamioka
- Washimi (10/27-28 Mitaka)
- Washimi (10/30 Kanazawa)
- Washimi (11/2-4 Kashiwa)
- Washimi (11/4-5 Waseda)
- Washimi (11/6-9? OMU)
- Washimi (12/4-8? Amsteldam)
General issue
- Cooling down
EX : Warming up for maintain the cooler -> Done
- GV opened and started cooling down
- GVs around EXC closed
- VAC trouble X-27
- The reason unknown, shutdown the vacuum pump
- VAC trouble X-27
- IX, IY, EY ongoing : about 85-87 K in IM (2023/09/22)
Temperature change url
- After starting the cooling down after measuring the Q-value of sapphire fiber
- New high power laser
- Broken, replaced the old FBL
- Interferometer operation
- PRFPMI lock trial : Ongoing
- New IP control
- Ongoing
- Strategy for noise hunting
出張PEM injection (planning form)
Jurnal paper issue
- Micro seismic analysis (Hoshino)
- Submited to CQG
- ICRC Proceedings
- Acoustic reverberation time paper (Washimi+, Sato?)
- Suspend
- Re-measurement before O4?
- TCam paper
- Writing ongoing
Preparation for O4b
- Check the seismic motion around mozumi area
- Daytime ground motion
- It may appeared in DARM sensitivity (SR3?)
- Schumann resonance measurement
- Restart (plan today)
- Evaluation of newtonian noise
- Investigation of the PEM injection
- Magnetic injection
- After O4a?
- Magnetic injection
- Voltmeter preparation
- AC power monitor installation
- DC power monitor installation
- After O4
- RF monitor with mokugo
- Tiltmeter
- RI detector
- Newtonian noise
- Discussion with DET members
- Daily summary page PEM
Progress report
- Yuzurihara
- Pastavi
Data Quality Report slide
- Data quality evaluation
- Hoshino
- Seismic motion analysis
- Sato
- Sound source analysis
- Miyamoto
- Weather analysis
- Takatani
- Applying the deepclean
- Calculation of Schumann resonance
- Kume
PR3 line injection klog25670
- Noise subtraction
- Nishizawa
- Water newtonian noise
- Magnetic field analysis
- Washimi
- Yokozawa
- Lock loss due to earthquake