Size: 4168
Comment:
|
← Revision 3 as of 2023-10-06 12:57:05 ⇥
Size: 3950
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 29: | Line 29: |
* Chou & Yeh (9/10 + LVK + 9/16-23, 28) | |
Line 44: | Line 43: |
* GVs around EXC closed * VAC trouble X-27 * The reason unknown, shutdown the vacuum pump |
|
Line 57: | Line 53: |
* Alignment sensing and control * OLTF measurements * Preparation towards opening the OMC chamber |
|
Line 71: | Line 71: |
* Submited to CQG | * Submited to Physica Scripta |
Line 78: | Line 78: |
* Suspend | * Suspend |
Line 141: | Line 141: |
* seismometer [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=26958|klog26958]], [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=26960|klog26960]] | |
Line 143: | Line 142: |
* SGWB + Schumann resonance * Acoustic NN estimation |
Weekly PEM meeting
- 2023/10/06(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
General announcement
- KAGRA visiting plan
- If you want to visit Kamioka, please contact Yokozawa
Meeting and Conference issue
- ET SCB/SPB/ANM workshop @ Nikhef, December 6-7
- Washimi will attend in person
- satellite meeting before/after the workshop?
- Gravitational Wave Probes of Physics Beyond Standard Model
- Osaka Metropolitan University
6-9 November 2023 url
- Registration deadline 9th Oct.
Other meetings url
If you have some presentation about PEM related, please contact to me.
Business travel (except for conferences)
- To Kamioka
- Miyamoto (10/4 - 11/3)
- From Kamioka
- Washimi (10/27-28 Mitaka)
- Washimi (10/30 Kanazawa)
- Washimi (11/2-4 Kashiwa)
- Washimi (11/4-5 Waseda)
- Washimi (11/6-9? OMU)
- Washimi (12/4-8? Amsteldam)
General issue
- Cooling down
EX : Warming up for maintain the cooler -> Done
- GV opened and started cooling down
- IX, IY, EY ongoing : about 85-87 K in IM (2023/09/22)
Temperature change url
- After starting the cooling down after measuring the Q-value of sapphire fiber
- New high power laser
- Broken, replaced the old FBL
- Interferometer operation
- PRFPMI lock trial : Ongoing
- Alignment sensing and control
- OLTF measurements
- Preparation towards opening the OMC chamber
- New IP control
- Ongoing
- Strategy for noise hunting
出張PEM injection (planning form)
Jurnal paper issue
- Micro seismic analysis (Hoshino)
- Submited to Physica Scripta
- ICRC Proceedings
- Acoustic reverberation time paper (Washimi+, Sato?)
- Suspend
- Re-measurement before O4?
- TCam paper
- Writing ongoing
Preparation for O4b
- Check the seismic motion around mozumi area
- Daytime ground motion
- It may appeared in DARM sensitivity (SR3?)
- Schumann resonance measurement
- Restart (plan today)
- Evaluation of newtonian noise
- Investigation of the PEM injection
- Magnetic injection
- After O4a?
- Magnetic injection
- Voltmeter preparation
- AC power monitor installation
- DC power monitor installation
- After O4
- RF monitor with mokugo
- Tiltmeter
- RI detector
- Newtonian noise
- Discussion with DET members
- Daily summary page PEM
Progress report
- Yuzurihara
- Pastavi
Data Quality Report slide
- Data quality evaluation
- Hoshino
- Seismic motion analysis
- Sato
- Sound source analysis
- Miyamoto
- Weather analysis
- Takatani
- Applying the deepclean
- Calculation of Schumann resonance
- Kume
PR3 line injection klog25670
- Noise subtraction
- Nishizawa
- Water newtonian noise
- Magnetic field analysis
- Washimi
- Magnetometer
- Yokozawa
- Lock loss due to earthquake