⇤ ← Revision 1 as of 2023-10-13 09:09:14
Size: 3950
Comment:
|
← Revision 2 as of 2023-10-13 09:19:37 ⇥
Size: 3975
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
* 2023/10/06(Fri) 17:00- | * 2023/10/13(Fri) 17:00- |
Line 7: | Line 7: |
* O4b * Break : mid-January - mid-March, 2024 * Virgo : will join in March * KAGRA : Three month observation around here |
|
Line 41: | Line 46: |
* EX : Warming up for maintain the cooler -> Done * GV opened and started cooling down |
* EX : Radiation shield cooling down : 235 K * Height adjustment today |
Line 44: | Line 49: |
* IX, IY, EY ongoing : about 85-87 K in IM (2023/09/22) | * IX, IY, EY ongoing : about 84-87 K in IM (2023/10/13) |
Line 47: | Line 52: |
* New high power laser * Broken, replaced the old FBL |
|
Line 54: | Line 56: |
* OLTF measurements | * Resonant frequency damping * MN oplev control to reduce the sensor noise * OMC lock stable |
Line 57: | Line 61: |
* Atmospheric release : 15th Oct.(Sunday) | |
Line 86: | Line 91: |
* Check the seismic motion around mozumi area * Daytime ground motion * It may appeared in DARM sensitivity (SR3?) |
|
Line 91: | Line 92: |
* Restart (plan today) | * Setting the magnetometer : Done * Prepare for winter season : Ongoing * Data taking : not done |
Line 94: | Line 97: |
* Anoop and Washimi * PEM installation * Start planning |
|
Line 97: | Line 104: |
* After O4a? | |
Line 102: | Line 108: |
* After O4 * RF monitor with mokugo * Tiltmeter * RI detector * Newtonian noise * Discussion with DET members * Daily summary page PEM |
Weekly PEM meeting
- 2023/10/13(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
General announcement
- O4b
- Break : mid-January - mid-March, 2024
- Virgo : will join in March
- KAGRA : Three month observation around here
- KAGRA visiting plan
- If you want to visit Kamioka, please contact Yokozawa
Meeting and Conference issue
- ET SCB/SPB/ANM workshop @ Nikhef, December 6-7
- Washimi will attend in person
- satellite meeting before/after the workshop?
- Gravitational Wave Probes of Physics Beyond Standard Model
- Osaka Metropolitan University
6-9 November 2023 url
- Registration deadline 9th Oct.
Other meetings url
If you have some presentation about PEM related, please contact to me.
Business travel (except for conferences)
- To Kamioka
- Miyamoto (10/4 - 11/3)
- From Kamioka
- Washimi (10/27-28 Mitaka)
- Washimi (10/30 Kanazawa)
- Washimi (11/2-4 Kashiwa)
- Washimi (11/4-5 Waseda)
- Washimi (11/6-9? OMU)
- Washimi (12/4-8? Amsteldam)
General issue
- Cooling down
- EX : Radiation shield cooling down : 235 K
- Height adjustment today
- IX, IY, EY ongoing : about 84-87 K in IM (2023/10/13)
Temperature change url
- After starting the cooling down after measuring the Q-value of sapphire fiber
- Interferometer operation
- PRFPMI lock trial : Ongoing
- Alignment sensing and control
- Resonant frequency damping
- MN oplev control to reduce the sensor noise
- OMC lock stable
- Preparation towards opening the OMC chamber
- Atmospheric release : 15th Oct.(Sunday)
- New IP control
- Ongoing
- Strategy for noise hunting
出張PEM injection (planning form)
Jurnal paper issue
- Micro seismic analysis (Hoshino)
- Submited to Physica Scripta
- ICRC Proceedings
- Acoustic reverberation time paper (Washimi+, Sato?)
- Suspend
- Re-measurement before O4?
- TCam paper
- Writing ongoing
Preparation for O4b
- Schumann resonance measurement
- Setting the magnetometer : Done
- Prepare for winter season : Ongoing
- Data taking : not done
- Evaluation of newtonian noise
- Anoop and Washimi
- PEM installation
- Start planning
- Investigation of the PEM injection
- Magnetic injection
- Voltmeter preparation
- AC power monitor installation
- DC power monitor installation
Progress report
- Yuzurihara
- Pastavi
Data Quality Report slide
- Data quality evaluation
- Hoshino
- Seismic motion analysis
- Sato
- Sound source analysis
- Miyamoto
- Weather analysis
- Takatani
- Applying the deepclean
- Calculation of Schumann resonance
- Kume
PR3 line injection klog25670
- Noise subtraction
- Nishizawa
- Water newtonian noise
- Magnetic field analysis
- Washimi
- Magnetometer
- Yokozawa
- Lock loss due to earthquake