Differences between revisions 2 and 3
Revision 2 as of 2024-01-19 16:21:50
Size: 4884
Comment:
Revision 3 as of 2024-01-26 09:53:33
Size: 4744
Comment:
Deletions are marked like this. Additions are marked like this.
Line 69: Line 69:
    * Eye check : done
     * MCi : No serious problem now
     * MCo : Repair the magnet, alignment and so on
     * MCe : alignment
   * Other suspensions:
    * Type-C : IMMT1,2 OMMT1,2, OSTM health check : OK
    * IMC
     * MCi : Checking
     * MCo : Ongoing
     * MCe : Checking

Weekly PEM meeting

General announcement

  • Kamioka visiting plan
    • Yokozawa and Washimi-san have several budgets (共同利用)
      • So we want to call not only PEM members but also KAGRA members who are interested in onsite.
      • If you want to visit Kamioka, please contact Yokozawa
    • Hoshino & Sato will stai Kamioka on February (3weeks?)

  • O4b
    • Break : mid-January - mid-March, 2024
    • Virgo : will join in March
    • KAGRA : Three month during O4b(?)
  • O4a noise budget paper
    • If you have a plan to write the paper using O4a data and PEM, please let me know.

Meeting and Conference issue

If you have some presentation about PEM related, please contact to me.

Business travel (except for conferences)

  • To Kamioka
    • Hoshino (February?)
    • Sato (Febryary?)
  • From Kamioka
    • No plan

General issue

  • Effect of earthquake
    • Noto earthquake at 1/1
    • IMC
      • Pumping up : Done
      • Cleaning the clean booth : Done
      • Open the several vacuum bellows : Donen
      • IMC
        • MCi : Checking
        • MCo : Ongoing
        • MCe : Checking
      • TYpe-Bp
        • PRM
          • Pumping up, cleaning, vacuum open done
          • Eye check ongoing
      • PR2 and PR3
        • Started pumping up
        • Open chambers : next week
      • Type-B : Health check before closing
      • Type-A : Start health check
  • Cooling down
    • IX,EX,IX, EY : Radiation shield cooling down : 84-90 K
    • Some trouble in EX, one cooler stopped, temporal operation of one payload cooler
  • Strategy for noise hunting

Jurnal paper issue

Details are here!

  • Micro seismic analysis (Hoshino)
  • Acoustic reverberation time paper (Washimi+, Sato?)
    • Suspend
    • Re-measurement before O4?
  • TCam paper
    • Writing ongoing

Preparation for O4b

  • Snow monitor
    • Ongoing
    • First snow detected
  • PEM installation
    • Waiting the timing of TMSX and TMSY
  • Evaluation of newtonian noise
    • Anoop and Washimi
  • Investigation of the PEM injection
    • Magnetic injection
  • Voltmeter preparation
    • AC power monitor installation
    • DC power monitor installation

Progress report

  • Yuzurihara
    • Pastavi
    • Data Quality Report slide

    • Data quality evaluation
  • Hoshino
    • Seismic motion analysis
  • Sato
    • Sound source analysis
  • Miyamoto
    • Weather analysis
  • Takatani
    • Noise subtraction with machine learning
  • Kume
    • PR3 line injection klog25670

    • Noise subtraction
  • Nishizawa
    • Water newtonian noise
    • Magnetic field analysis
  • Washimi
    • Signals from the Noto earthquake and tsunami
  • Yokozawa
    • Noise budget in current IFO

Place for memo

KAGRA/Subgroups/PEM/Meeting/240119/Agenda (last edited 2024-01-26 09:53:33 by TakaakiYokozawa)