Line 7: Line 7:

 * Kamioka visiting plan
  * Yokozawa and Washimi-san have several budgets (共同利用)
    * So we want to call not only PEM members but also KAGRA members who are interested in onsite.
    * If you want to visit Kamioka, please contact Yokozawa
  * Hoshino & Sato will stai Kamioka on February (3weeks?)
Line 23: Line 17:

  * LVK meeting
   * Louisiana (2024/03/11-14?)

  * KIW11
   * Taiwan (2024/04/16-17)

  * GWADW
   * Australia (2024/05/12-18)
  
  * GWPAW
   * Israel (2024/05/27-31)
Line 63: Line 69:
    * MCi : No serious problem now
    * MCo : Repair the magnet, alignment and so on
    * MCe : alignment
    * Initial alignment ongoing (We may believe the oplev signals)
Line 67: Line 71:
    * Type-A
     * We found several magnet didn't work, so we need to open the cryostat
      * IX : H1, H3, H4 coil not working
      * IY : OK
      * EX : H1 not working
      * EY : H1, H2, H3, H4 not working
     * Health check in other part is ongoing
Line 70: Line 81:
      * Pumping up, cleaning, vacuum open done
      * Eye check ongoing
      * Repair work is ongoing
      * We need to judge to open the top chamber or not
Line 73: Line 84:
     * Started pumping up
     * Open chambers : next week
     * Eye check done
Line 76: Line 86:
    * Type-A : Start health check

  * Cooling down
   * IX,EX,IX, EY : Radiation shield cooling down : 84-90 K
   * Some trouble in EX, one cooler stopped, temporal operation of one payload cooler
Line 153: Line 158:
  * Noise budget in current IFO   * Eigen frequency check at IFI chamber

Weekly PEM meeting

General announcement

  • O4b
    • Break : mid-January - mid-March, 2024
    • Virgo : will join in March
    • KAGRA : Three month during O4b(?)
  • O4a noise budget paper
    • If you have a plan to write the paper using O4a data and PEM, please let me know.

Meeting and Conference issue

If you have some presentation about PEM related, please contact to me.

Business travel (except for conferences)

  • To Kamioka
    • Hoshino (February?)
    • Sato (Febryary?)
  • From Kamioka
    • No plan

General issue

  • Effect of earthquake
    • Noto earthquake at 1/1
    • IMC
      • Initial alignment ongoing (We may believe the oplev signals)
    • Other suspensions:
      • Type-A
        • We found several magnet didn't work, so we need to open the cryostat
          • IX : H1, H3, H4 coil not working
          • IY : OK
          • EX : H1 not working
          • EY : H1, H2, H3, H4 not working
        • Health check in other part is ongoing
      • Type-C : IMMT1,2 OMMT1,2, OSTM health check : OK
      • TYpe-Bp
        • PRM
          • Repair work is ongoing
          • We need to judge to open the top chamber or not
      • PR2 and PR3
        • Eye check done
      • Type-B : Health check before closing
  • Strategy for noise hunting

Jurnal paper issue

Details are here!

  • Micro seismic analysis (Hoshino)
  • Acoustic reverberation time paper (Washimi+, Sato?)
    • Suspend
    • Re-measurement before O4?
  • TCam paper
    • Writing ongoing

Preparation for O4b

  • Snow monitor
    • Ongoing
    • First snow detected
  • PEM installation
    • Waiting the timing of TMSX and TMSY
  • Evaluation of newtonian noise
    • Anoop and Washimi
  • Investigation of the PEM injection
    • Magnetic injection
  • Voltmeter preparation
    • AC power monitor installation
    • DC power monitor installation

Progress report

  • Yuzurihara
    • Pastavi
    • Data Quality Report slide

    • Data quality evaluation
  • Hoshino
    • Seismic motion analysis
  • Sato
    • Sound source analysis
  • Miyamoto
    • Weather analysis
  • Takatani
    • Noise subtraction with machine learning
  • Kume
    • PR3 line injection klog25670

    • Noise subtraction
  • Nishizawa
    • Water newtonian noise
    • Magnetic field analysis
  • Washimi
    • Signals from the Noto earthquake and tsunami
  • Yokozawa
    • Eigen frequency check at IFI chamber

Place for memo