Size: 4987
Comment:
|
← Revision 3 as of 2024-03-08 08:28:55 ⇥
Size: 4579
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 64: | Line 64: |
* Hoshino (2/11-23) * Sato (2/14-22) * Tagoshi lab students(2/19-20) |
|
Line 69: | Line 66: |
* Washimi (3/3-9) | * Washimi (3/3-9 Sendai) * Yokozawa (3/27-29 Kashiwa) |
Line 75: | Line 73: |
* Suspension refurbishment : Mostly done * Alignment will start soon |
* Cavity check : OK * Alignment : Checked * Remaining work * Jig replacement (Aso) * shield re-instllation * Closing chamber |
Line 80: | Line 82: |
* Coil response PR2 : ongoing | |
Line 83: | Line 86: |
* Magnet : Done * BF check : Done |
* We found the viewports for MN oplev have some frosting and something |
Line 86: | Line 88: |
* Magnet : Done | * Height adjustment : Done * NAB, TMSX : OK * PCal alignment : ongoing |
Line 88: | Line 92: |
* Magnet : Done * BF check : Done |
* NAB, TCam, TMSY : not yet |
Line 91: | Line 94: |
* Decided to open the chamber : warming up, N2 injection | * Open the chamber today |
Line 94: | Line 97: |
* Found the GR beam in TMSX PD * PR3 alignment is good for oplev (before earthquake) * No POP table drift |
* GRY not find : need to check SR3 and POS table |
Line 166: | Line 167: |
* 60Hz noise on PR2 OSEM [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=28707]] * Lightning event in the O4a [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=28731]] |
* |
Line 170: | Line 170: |
* Tapping test * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=15606|JGWDoc15606]] * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=15616|JGWDoc15616]] * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=15624|JGWDoc15624]] |
* TCam |
Weekly PEM meeting
- 2024/03/08(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
General announcement
- Authorlist 2024
- If you have an opinion, please let us know.
- O4b
- Break : mid-January - mid-March, 2024
- Virgo : will join in March
- KAGRA : Three month during O4b(?)
- O4a noise budget paper
- If you have a plan to write the paper using O4a data and PEM, please let me know.
Meeting and Conference issue
- UGAP2024 @ Tohoku U 2024/3/4~6
- international conference of underground experiments
- Washimi will have a presentation of lightnings and thunders
- 第4回新学術「地下宇宙」若手研究会 @ Tohoku U 2024/3/7~8
- LVK meeting
- Louisiana (2024/03/11-14?)
- Yokozawa have a talk about NN noise
- 22:00 UTC Monday 11th
- Water fluid
- Infrasound
- Atomospheric NN at TOBA
- Snow monitor
- Past gravity field measurement
- JPS (online) 2024/3/18-21
https://www.jps.or.jp/activities/meetings/spring/spring_index.php
- Hoshino (Earthquake)
- Miyamoto (weather)
- Sato (Sound)
- Takatani (Noise subtraction)
- KIW11
- Taiwan (2024/04/16-17)
- Yokozawa and Washimi will join (Contents is not decided)
- 4/19 afternoon with deepclean member
- GWADW
- Australia (2024/05/12-18)
- GWPAW
- Israel (2024/05/27-31)
Other meetings url
If you have some presentation about PEM related, please contact to me.
Business travel (except for conferences)
- To Kamioka
- Miyamoto (2/26-3/2)
- From Kamioka
- Washimi (3/3-9 Sendai)
- Yokozawa (3/27-29 Kashiwa)
General issue
- Interferometer recovery
- IMC
- Cavity check : OK
- Alignment : Checked
- Remaining work
- Jig replacement (Aso)
- shield re-instllation
- Closing chamber
- Type-Bp
- Suspension refurbishment : Mostly done
- Coil response PR2 : ongoing
- Type-A
- IX
- We found the viewports for MN oplev have some frosting and something
- EX
- Height adjustment : Done
- NAB, TMSX : OK
- PCal alignment : ongoing
- EY
- NAB, TCam, TMSY : not yet
- IY
- Open the chamber today
- IX
- Green alignment recovery
- GRY not find : need to check SR3 and POS table
- IMC
- Strategy for noise hunting
出張PEM injection (planning form)
Jurnal paper issue
- Micro seismic analysis (Hoshino)
- Submited to Physica Scripta
- Acoustic reverberation time paper (Washimi+, Sato?)
- Suspend
- Re-measurement before O4?
- TCam paper
- Writing ongoing
Preparation for O4b
- Snow monitor
- Ongoing
- First snow detected
- PEM installation
- Waiting the timing of TMSX and TMSY
- Evaluation of newtonian noise
- Anoop and Washimi
- Investigation of the PEM injection
- Magnetic injection
- Voltmeter preparation
- AC power monitor installation
- DC power monitor installation
Progress report
- Yuzurihara
- Pastavi
Data Quality Report slide
- Data quality evaluation
- Hoshino
- Seismic motion analysis
- Sato
- Sound source analysis
- Miyamoto
- Weather analysis
- Takatani
- Noise subtraction with machine learning
- Kume
PR3 line injection klog25670
- Noise subtraction
- Nishizawa
- Water newtonian noise
- Magnetic field analysis
- Washimi
- Yokozawa
- TCam