Line 2: Line 2:
 * 2024/03/22(Fri) 17:00-  * 2024/03/29(Fri) 17:00-
Line 7: Line 7:

 * Today is the final day for FY 2023, thank you for all member for your large contribution
Line 64: Line 66:
  * Yokozawa (3/27-29 Kashiwa)
Line 70: Line 71:
   * IMC
    * Plan
     * Final check : Done
     * vibration check, photo session : today planned
     * Closing : 3/25 -
     * Pumping : 3/26-
   * IMC (4/1 -4/12)
    * Pumping : 3/28-
    * Recovery
     * LSC
     * Suspension
     * Characterization
     * ASC
Line 82: Line 84:
    * Xarm pumping down (~4/15)
    * Yarm pumping down (Early May?)
Line 84: Line 88:
     * Height adjustment
Line 89: Line 94:
     * We found several viewport window cleaning      * Window cleaning
Line 96: Line 101:
     * Pick up the information      * Mirror cleaning
Line 104: Line 109:
     * Final check before closing chamber      * Beam shift check : Done
    * Close EXA chamber next Wednesday
Line 107: Line 113:

   * TCam
    * Photo taking with major : Done
    * Taking picture with GRX flash
    * End Y cleaning

  * Strategy for noise hunting
   * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=26848|klog26848]]
Line 133: Line 131:
 * Snow monitor
  * Ongoing
  * First snow detected
  
 * [Important] Strategy for reducing the effect of the acoustic noise
  * Discuss in Yokozawa part
Line 178: Line 175:
  *   * OMC vibration test
Line 181: Line 178:
  * TCam   * Strategy for reducing the acoustic noise

Weekly PEM meeting

General announcement

  • Today is the final day for FY 2023, thank you for all member for your large contribution
  • SEO PEM budget 2024
    • Maintenance
    • Towards O5
  • Several Virgo ENV member have some plan to visit KAGRA about 1 month
    • One month Aug. - Dec.
    • They are also thinking about visiting LIGO
    • KAGRA would still be commissioning phase
    • Plan
      • Noise hunting (PEM injection)
      • Magnetic injection
      • Additional NN measurement
      • Other
  • Authorlist 2024
    • If you have an opinion, please let us know.
  • O4b
    • ER16 20th Mar.
    • O4b 3rd Apr.
  • O4a noise budget paper
    • If you have a plan to write the paper using O4a data and PEM, please let me know.

Meeting and Conference issue

  • Please reserve the hotel in Hokkaido if you plan to join the Autum JPS meeting next time
  • JPS (online) 2024/3/18-21
  • KIW11
    • Taiwan (2024/04/16-20)
    • Yokozawa : Exploring the Mesoscale Meteorology on the KAGRA Gravitational Wave Detector
    • Washimi : Earthquake Effects on KAGRA
    • 4/19 afternoon meeting with deepclean member
  • GWADW
    • Australia (2024/05/12-18)
  • GWPAW
    • Israel (2024/05/27-31)
  • Other meetings url

If you have some presentation about PEM related, please contact to me.

Business travel

  • To Kamioka
    • None
  • From Kamioka
    • Yokozawa (4/13-21 Taiwan)

General issue

  • Interferometer recovery
    • IMC (4/1 -4/12)
      • Pumping : 3/28-
      • Recovery
        • LSC
        • Suspension
        • Characterization
        • ASC
    • Type-Bp
      • First contac trial
      • Wait next step (IR alignment after IMC closing)
    • Type-A
      • Xarm pumping down (~4/15)
      • Yarm pumping down (Early May?)
      • IX
        • Oplev viewport cleaning
        • Height adjustment
        • Roll realignment
        • Earthquake check oplev path check ??
      • EX
        • Earthquake check oplev path check : Done
        • Health check : Ongoing
        • Window cleaning
      • EY
        • BF coil : Done
        • PF cabling : Planned
        • Roll alignment
        • Earthquake check oplev path check ??
      • IY
        • Mirror cleaning
    • Green alignment recovery
      • Both GRX and GRY reached end
      • Found POP POS table for reflection beam from ETMs
    • Pcal
      • X
        • Beam shift check : Done
        • Close EXA chamber next Wednesday
      • Y
        • After finalize X

Jurnal paper issue

Details are here!

Preparation for O4b

  • [Important] Strategy for reducing the effect of the acoustic noise
    • Discuss in Yokozawa part
  • PEM installation
    • Waiting the timing of TMSX and TMSY
  • Evaluation of newtonian noise
    • Anoop and Washimi
  • Investigation of the PEM injection
    • Magnetic injection
  • Voltmeter preparation
    • AC power monitor installation
    • DC power monitor installation

Progress report

  • Yuzurihara
    • Pastavi
    • Data Quality Report slide

    • Data quality evaluation
  • Hoshino
    • Seismic motion analysis
  • Sato
    • Sound source analysis
  • Miyamoto
    • Weather analysis
  • Takatani
    • Noise subtraction with machine learning
  • Kume
    • PR3 line injection klog25670

    • Noise subtraction
  • Nishizawa
    • Water newtonian noise
    • Magnetic field analysis
  • Washimi
    • OMC vibration test
  • Yokozawa
    • Strategy for reducing the acoustic noise

Place for memo