⇤ ← Revision 1 as of 2024-04-05 07:30:21
Size: 4667
Comment:
|
← Revision 2 as of 2024-04-05 07:47:35 ⇥
Size: 3951
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
* 2024/03/29(Fri) 17:00- | * 2024/04/05(Fri) 17:00- |
Line 8: | Line 8: |
* Today is the final day for FY 2023, thank you for all member for your large contribution | * 2024年度もよろしくお願いします。 |
Line 29: | Line 29: |
* O4b 3rd Apr. | * O4b 10th Apr. |
Line 36: | Line 36: |
* Please reserve the hotel in Hokkaido if you plan to join the Autum JPS meeting next time * JPS (online) 2024/3/18-21 * [[https://www.jps.or.jp/activities/meetings/spring/spring_index.php]] * Hoshino (Earthquake) * Miyamoto (weather) * Sato (Sound) * Takatani (Noise subtraction) |
* Please reserve the hotel in Hokkaido if you plan to join the Autumn JPS meeting next time |
Line 55: | Line 48: |
* Israel (2024/05/27-31) | * England (2024/05/27-31) |
Line 67: | Line 60: |
* Washimi () | |
Line 71: | Line 65: |
* IMC (4/1 -4/12) | * IMC (4/1 - 4/12) |
Line 87: | Line 81: |
* Oplev viewport cleaning * Height adjustment * Roll realignment * Earthquake check oplev path check ?? |
* Health check and final check |
Line 92: | Line 83: |
* Earthquake check oplev path check : Done * Health check : Ongoing * Window cleaning |
* Health check and final check |
Line 96: | Line 85: |
* BF coil : Done * PF cabling : Planned * Roll alignment * Earthquake check oplev path check ?? |
* Photo sensor check |
Line 101: | Line 87: |
* Mirror cleaning | * Health check |
Line 103: | Line 89: |
* Green alignment recovery * Both GRX and GRY reached end * Found POP POS table for reflection beam from ETMs |
* OMC vibration * Discussed with Washimi-san's session |
Line 110: | Line 95: |
* Close EXA chamber next Wednesday | * Power budget |
Line 154: | Line 139: |
* Hoshino * Seismic motion analysis |
|
Line 159: | Line 141: |
* Miyamoto * Weather analysis * Takatani * Noise subtraction with machine learning |
Weekly PEM meeting
- 2024/04/05(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
General announcement
- 2024年度もよろしくお願いします。
- SEO PEM budget 2024
- Maintenance
- Towards O5
- Several Virgo ENV member have some plan to visit KAGRA about 1 month
- One month Aug. - Dec.
- They are also thinking about visiting LIGO
- KAGRA would still be commissioning phase
- Plan
- Noise hunting (PEM injection)
- Magnetic injection
- Additional NN measurement
- Other
- Authorlist 2024
- If you have an opinion, please let us know.
- O4b
- ER16 20th Mar.
- O4b 10th Apr.
- O4a noise budget paper
- If you have a plan to write the paper using O4a data and PEM, please let me know.
Meeting and Conference issue
- Please reserve the hotel in Hokkaido if you plan to join the Autumn JPS meeting next time
- KIW11
- Taiwan (2024/04/16-20)
- Yokozawa : Exploring the Mesoscale Meteorology on the KAGRA Gravitational Wave Detector
- Washimi : Earthquake Effects on KAGRA
- 4/19 afternoon meeting with deepclean member
- GWADW
- Australia (2024/05/12-18)
- GWPAW
- England (2024/05/27-31)
Other meetings url
If you have some presentation about PEM related, please contact to me.
Business travel
- To Kamioka
- None
- From Kamioka
- Yokozawa (4/13-21 Taiwan)
- Washimi ()
General issue
- Interferometer recovery
- IMC (4/1 - 4/12)
- Pumping : 3/28-
- Recovery
- LSC
- Suspension
- Characterization
- ASC
- Type-Bp
- First contac trial
- Wait next step (IR alignment after IMC closing)
- Type-A
- Xarm pumping down (~4/15)
- Yarm pumping down (Early May?)
- IX
- Health check and final check
- EX
- Health check and final check
- EY
- Photo sensor check
- IY
- Health check
- OMC vibration
- Discussed with Washimi-san's session
- Pcal
- X
- Beam shift check : Done
- Power budget
- Y
- After finalize X
- X
- IMC (4/1 - 4/12)
出張PEM injection (planning form)
Jurnal paper issue
- Micro seismic analysis (Hoshino)
- Submit to PTEP
- Acoustic reverberation time paper (Washimi+, Sato?)
- Suspend
- Re-measurement before O4?
Preparation for O4b
- [Important] Strategy for reducing the effect of the acoustic noise
- Discuss in Yokozawa part
- PEM installation
- Waiting the timing of TMSX and TMSY
- Evaluation of newtonian noise
- Anoop and Washimi
- Investigation of the PEM injection
- Magnetic injection
- Voltmeter preparation
- AC power monitor installation
- DC power monitor installation
Progress report
- Yuzurihara
- Pastavi
Data Quality Report slide
- Data quality evaluation
- Sato
- Sound source analysis
- Kume
PR3 line injection klog25670
- Noise subtraction
- Nishizawa
- Water newtonian noise
- Magnetic field analysis
- Washimi
- OMC vibration test
- Yokozawa
- Strategy for reducing the acoustic noise