== Weekly PEM meeting == * 2024/05/31(Fri) 17:00- * Regular meeting * Zoom2 : https://zoom.us/j/6676627462 ==== General announcement ==== * KAGRA Regular Young Researcher Meeting * Next 19th June (Wed) 17:00-(JST) * https://dac.icrr.u-tokyo.ac.jp/KAGRA/MRYRM/MEETING20240619 * Several Virgo ENV member have some plan to visit KAGRA about 1 month * One month around Nov. * They are also thinking about visiting LIGO * KAGRA would still be commissioning phase * Plan * Noise hunting (PEM injection) * Magnetic injection * Additional NN measurement * Other * O4a noise budget paper * If you have a plan to write the paper using O4a data and PEM, please let me know. ==== Meeting and Conference issue ==== * 2024 Annual Meeting of the Physical Society of Japan * Start the registration * GWPAW * England (2024/05/27-31) * Other meetings [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/DAWG/conferences|url]] If you have some presentation about PEM related, please contact to me. ==== Business travel ==== * To Kamioka * Aogaku (6/23-6/27) * From Kamioka * Washimi (6/3,4 Naoj) ==== General issue ==== * Interferometer recovery * IMC Recovery : Done (Similar situation around O4a) * hammering test toward future blasting (Done) * IFI, IMM, PRM * Pumping down : Done * Center area * Acceptance check(31st May) * Closing (June) * Type-A * IX : Pumping down/ health check ongoing * EX : Pumping down/ health check ongoing * IY : Pumping down/ health check ongoing * EY : Cleaning at EYA * Week of 20th Water cleaning * Week of 27th Test of pumping down * Week of 3rd June PCAL mirror cleaning * Week of 10th June PCAL alignment * OMC vibration * Need to treat something for stacks of OMC chamber * Schedule : Preparation(6/1-10, actual work 6/11-21) * IR/GR alignment recovery : Done * Check the beam position at various mirrors (adjust good alignment for O4a ASC) * 出張PEM injection ([[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=14016|planning form]]) * ==== Jurnal paper issue ==== [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/Reports/JurnalPaperIssue|Details are here!]] * Micro seismic analysis (Hoshino) * Submit to PTEP (2nd submission) * [[https://ja.overleaf.com/project/627270d6b67cab411d1c7d32|Overleaf]] * [[http://arxiv.org/abs/2306.12437]] * Acoustic reverberation time paper (Washimi+, Sato?) * Suspend * Re-measurement before O4? ==== Preparation for O4b ==== * PEM installation * Waiting the timing of TMSX and TMSY * Evaluation of newtonian noise * Anoop and Washimi * Investigation of the PEM injection * Magnetic injection * Voltmeter preparation * AC power monitor installation * DC power monitor installation ==== Progress report ==== * Yuzurihara * Pastavi * Data Quality Report [[https://dcc.ligo.org/G2201168|slide]] * Data quality evaluation *Sato * Sound source analysis * Kume * PR3 line injection [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=25670|klog25670]] * Noise subtraction * Nishizawa * Water newtonian noise * Magnetic field analysis * Washimi * Vibration test around IMC area (Yokozawa?) * OMC vibration test * Yokozawa * Additional Shindo monitor with raspberry pi ==== Place for memo ==== * [[https://www.gw-openscience.org/O3/o3aspeclines/|Line noise list in O3a public data]] * [[https://pubplan.ligo.org/CW/KAGRA_VectorDM.html|Summary page for KAGRA O3 vector dark matter]]