⇤ ← Revision 1 as of 2024-10-11 10:06:48
Size: 2330
Comment:
|
← Revision 2 as of 2024-10-11 10:11:58 ⇥
Size: 2500
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 39: | Line 39: |
* PRFPMI RF lock succeeded * Minimum Alignment Sensing and Control closed * Moved to DC readout |
* Recovered the O4a situation * Kept more than 11 hours last night * Some frequency improved ([[https://gwdet.icrr.u-tokyo.ac.jp/~controls/summary/day/20241010/#gallery-1|Sensitivity]]) * OMC repair work(?) * Improved the suspension control * Calibration check is ongoing |
Line 44: | Line 48: |
* PRFPMI DC readout characterization (-10/20) * OMC repairing (10/21-25) |
* OMC commissioning with Komori-san (-10/17) * OMC repairing (10/17-25) * Cooling down |
Line 68: | Line 73: |
* Sound source analysis | * Acoustic injection analysis |
Line 74: | Line 79: |
* PR3 line injection [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=25670|klog25670]] | |
Line 83: | Line 87: |
* Preparation of the large coil |
Weekly PEM meeting
- 2024/10/11(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
General announcement
- Virgo ENV member have some plan to visit KAGRA about 1 month
- Jan., Feb. or Mar. one month
- Plan
- Noise hunting (PEM injection) toward the 10 Mpc would be first priority
- Power supply operation
- Magnetic injection
- Additional NN measurement
- Other
- O4a noise budget paper
- If you have a plan to write the paper using O4a data and PEM, please let me know.
Meeting and Conference issue
Other meetings url
If you have some presentation about PEM related, please contact to me.
Business travel
- To Kamioka
- No
- From Kamioka
YokozaWashimi (10/24-25 Osaka)
- Washimi (NAOJ)
General issue
- Commissioning
- PRFPMI
- Recovered the O4a situation
- Kept more than 11 hours last night
Some frequency improved (Sensitivity)
- OMC repair work(?)
- Improved the suspension control
- Calibration check is ongoing
- Recovered the O4a situation
- Schedule
- OMC commissioning with Komori-san (-10/17)
- OMC repairing (10/17-25)
- Cooling down
- PRFPMI
出張PEM injection (planning form)
Jurnal paper issue
Preparation for O4b
- Coil preparation for magnetic injection
- Voltmeter preparation
- AC power monitor installation
- DC power monitor installation
Progress report
- Yuzurihara
- Pastavi
Data Quality Report slide
- Data quality evaluation
- Sato
- Acoustic injection analysis
- Ohashi
- Microseismic noise with machine learning
- Kume
- Noise subtraction
- Nishizawa
- Water newtonian noise
- Magnetic field analysis
- Washimi
- OMC test at NAOJ
- Preparation of the large coil
- Yokozawa
- Noise hunting