== Weekly PEM meeting == * 2024/11/01(Fri) 17:00- * Regular meeting * Zoom2 : https://zoom.us/j/6676627462 ==== General announcement ==== * Virgo ENV member have some plan to visit KAGRA about 1 month * Jan., Feb. or Mar. one month * Plan * Noise hunting (PEM injection) toward the 10 Mpc would be first priority * Power supply operation * Magnetic injection * Additional NN measurement * Other * O4a noise budget paper * If you have a plan to write the paper using O4a data and PEM, please let me know. * Start the investigation for the new subsystem, noise subtraction, under the SEO. * First meeting in Japanese member, next week ==== Meeting and Conference issue ==== * Other meetings [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/DAWG/conferences|url]] If you have some presentation about PEM related, please contact to me. ==== Business travel ==== * To Kamioka * No * From Kamioka * Washimi (YMAP,ET) ==== General issue ==== * Commissioning * PRFPMI * Some frequency improved ([[https://gwdet.icrr.u-tokyo.ac.jp/~controls/summary/day/20241010/#gallery-1|Sensitivity]]) * OMC commissioning * We found the OMC LSC error made the frequency conversion noise * By checking the acoustic injection, shaker injection, peak injection using OMC piezo. * We concluded the high freqnency peak of OMC LSC error (>80 Hz) DARM displacement became worse * During O4a, three peaks around 90 Hz exist, they made the wide frequency acoustic noise. * And the sideband of this peak was the low frequency noise of the OMC LSC error * About 8 Hz resonant noise (stack yaw resonant) exicted by the daytime traffic. * Now, the large peak at high frequency didn't exist, so acoustic noise became non dominant noise. * OMC repair work * Stack connection to avoid the 80 Hz resonance * OMC shroud installation check (Now removed) * Ghost beam investigation * Schedule * OMC repairing (10/17-25) * Cooling down (ongoing) * High power challenge 5 W (11/5 - 8) * Noise budget (11/11 - 15) * 出張PEM injection ([[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=14016|planning form]]) ==== Jurnal paper issue ==== [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/Reports/JurnalPaperIssue|Details are here!]] ==== Preparation for O4b ==== * Coil preparation for magnetic injection * Voltmeter preparation * AC power monitor installation * DC power monitor installation ==== Progress report ==== * Yuzurihara * Pastavi * Data Quality Report [[https://dcc.ligo.org/G2201168|slide]] * Data quality evaluation * Sato * Acoustic injection analysis * Ohashi * Microseismic noise with machine learning * Kume * Noise subtraction * Nishizawa * Water newtonian noise * Magnetic field analysis * Washimi * OMC test at NAOJ * Preparation of the large coil * Yokozawa * Noise hunting ==== Place for memo ==== * [[https://www.gw-openscience.org/O3/o3aspeclines/|Line noise list in O3a public data]] * [[https://pubplan.ligo.org/CW/KAGRA_VectorDM.html|Summary page for KAGRA O3 vector dark matter]]