Size: 4053
Comment:
|
Size: 4235
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 16: | Line 16: |
* Bi-month VK PEM meeting | * Bi-weeklky VK PEM meeting |
Line 24: | Line 24: |
* [[https://docs.google.com/document/d/1VbBntL1CvmE1otJ0sUG7Ot_ybvhOCGjMTLXz3I4hcYo/edit?usp=sharing|url]] | * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=16567|JGW-G2516567]] |
Line 29: | Line 29: |
* 4/23,24 : From QUarks to Neutron Stars * [[https://indico2.riken.jp/event/5141/page/405-overview|url]] |
* 4/23,24 : From QUarks to Neutron Stars * [[https://indico2.riken.jp/event/5141/page/405-overview|url]] * Yokozawa will have a presentation |
Line 38: | Line 36: |
* 5/19~23 : GWADW2025 @ フロリダ * [[https://gwadw.clas.ufl.edu/|url]] * 5/25~28 : KIW12 @ 上海 * [[https://kiw12.casconf.cn/page/1878817789607809024|url]] * 5/26~30: ET symposium @ ボローニャ * [[https://indico.ego-gw.it/event/819/|url]] |
* 5/19~23 : GWADW2025 @ フロリダ [[https://gwadw.clas.ufl.edu/|url]] * 5/25~28 : KIW12 @ 上海 [[https://kiw12.casconf.cn/page/1878817789607809024|url]] * 5/26~30: ET symposium @ ボローニャ [[https://indico.ego-gw.it/event/819/|url]] |
Line 50: | Line 43: |
If you have some presentation about PEM related, please contact to me. | If you have some presentations about PEM related, please contact to me. |
Line 55: | Line 48: |
* | * Kaku+ (??) |
Line 57: | Line 50: |
* Washimi (Tokyo 4/11) | |
Line 60: | Line 54: |
* Washimi (Sardegna, Middle of June - Middle of July?) * Washimi (Yamaguchi -> Hiroshima -> Kohch -> Okayama, 9/8-9/30?) |
Weekly PEM meeting
- 2025/04/04(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
General announcement
- New fiscal year start
- If you have idea for new schience and new project, please contact to Yokozawa
O4c url
- Now commissioning break, Re-start 4th June end 7th Oct.
- Discussion about the engineering run
- KAGRA will join this with 10 Mpc sensitivity
- Now commissioning break, Re-start 4th June end 7th Oct.
- Bi-weeklky VK PEM meeting
- To discuss the analysis during their measurements
- Monday 17:00-(JST)
- First meeting would be 7th Apr.
Meeting and Conference issue
- TOBA and Gravity Gradient Workshop
- Various discussion
- 4/11 : FS地震学 B02班研究集会 @ 地震研
- Washimi will have a presentation
4/23,24 : From QUarks to Neutron Stars * url
- Yokozawa will have a presentation
- 5/9~10 : JGWC研究会 @ JAXA相模原
- 発表申込締切:2025年4月7日(月)
- 参加登録締切:2025年4月21日(月)
5/19~23 : GWADW2025 @ フロリダ url
5/25~28 : KIW12 @ 上海 url
5/26~30: ET symposium @ ボローニャ url
- 締切:3/31
Other meetings url
If you have some presentations about PEM related, please contact to me.
Business travel
- To Kamioka
- Kaku+ (??)
- From Kamioka
- Washimi (Tokyo 4/11)
- Yokozawa (Tokyo 4/22-24)
- Yokozawa (JAXA 5/9-10??)
- Yokozawa (Kashiwa 5/14-16??)
- Washimi (Sardegna, Middle of June - Middle of July?)
Washimi (Yamaguchi -> Hiroshima -> Kohch -> Okayama, 9/8-9/30?)
Jurnal paper issue
- Non-linear ICA paper
- Now we discussed about the playground
- Schumann Resonance paper
- Long term observation, seasonal variance
- Amplified inside the mine
- Others
- O4 PEM paper
- Start to investigate the topics
- Microseism with machine learning
- 1 Hz seismic motion paper
- Start the investigation
General issue
- Commissioning
- PRFPMI
Latest sensitivity url
- IFI treatment
- Found the loosed screw in STM2
- Clear improvement 128 Hz, 220 Hz
- Added the de-whitening filter to Type-A GAS filter
- Disappeared the peaks around 20 Hz
- Reducing the RMS of the DARM error
- For the weaker coil driver
- Installed the switching circuit
- Damping the peaks around 40 Hz
- PEM injection test
- Washimi-san will report it
- Cooler status
- One cryocooler for duct shield was several trouble
- We carefully checked it
- Noise budget
- PRFPMI
出張PEM injection (planning form)
Preparation for O4b
- Coil preparation for magnetic injection
- Done
- Voltmeter preparation
- AC power monitor installation
- DC power monitor installation
Progress report
- Ohashi
- Microseismic noise with machine learning
- Kaku
- Magnetic field
- Murofushi
- Earthquake and GIF noise
- Ozaki
- Nearby earthquake
- Obara
- Earthquake and suspension
- Kume, Ueno
- Noise subtraction
- Nishizawa
- Water newtonian noise
- Magnetic field analysis
- Washimi
- PEM injection
- Yokozawa
- Noise hunting