⇤ ← Revision 1 as of 2025-05-02 07:40:13
Size: 4092
Comment:
|
← Revision 2 as of 2025-05-02 07:48:01 ⇥
Size: 3393
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
* 2025/04/25(Fri) 17:00- | * 2025/05/02(Fri) 17:00- |
Line 7: | Line 7: |
* Schumann resonance paper review |
|
Line 20: | Line 18: |
* 「地震学(井出)」輪読ゼミ * 毎週木曜10時~ |
|
Line 27: | Line 22: |
* 4/23,24 : From QUarks to Neutron Stars * [[https://indico2.riken.jp/event/5141/page/405-overview|url]] * Yokozawa will join the meeting |
|
Line 39: | Line 31: |
* Registration 15th May. | |
Line 57: | Line 50: |
* Washimi (Tokyo 4/11) * Yokozawa (Tokyo 4/22-24) |
|
Line 89: | Line 80: |
* Latest sensitivity ~6.0 Mpc by adjusting the alignment offset | * Latest sensitivity 6.8 Mpc by adjusting the alignment offset |
Line 91: | Line 82: |
* For the more low power coil driver * Install the registance to reduce the circuit noise * Update the control * Searching the good alignment * By adding the offset to the ASC loop, we search the better sensitivity alignment * We need the OMC ASC (Beacon) to perform more stable * CARM noise investigation |
* Several peaks investigation |
Line 101: | Line 86: |
* Reported in commissioning meeting * Washimi-san will report it [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=16652]] |
* Ongoing * Cooling down the suspension |
Weekly PEM meeting
- 2025/05/02(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
General announcement
O4c url
- Now commissioning break, Re-start 4th June end 7th Oct.
- Discussion about the engineering run
- KAGRA will join this with 10 Mpc sensitivity
- Now commissioning break, Re-start 4th June end 7th Oct.
- Bi-weeklky VK PEM meeting
- To discuss the analysis during their measurements
- Monday 17:00-(JST)
Next 28th Apr., 2025 12th May 2025
- 休日シフト募集中
- 三代木さんのメール参照
Meeting and Conference issue
- 5/9~10 : JGWC研究会 @ JAXA相模原
- 発表申込締切:2025年4月7日(月)
- 参加登録締切:2025年4月21日(月)
5/19~23 : GWADW2025 @ フロリダ url
5/26~27 : KIW12 @ 上海 url
- Registration 15th May.
- Yokozawa will join the meeting
5/26~30: ET symposium @ ボローニャ url
- 締切:3/31
Other meetings url
If you have some presentations about PEM related, please contact to me.
Business travel
- To Kamioka
- Obara (4/29 - 5/1)
- Ozaki (5/18-24)
- Kaku+3M1 (5/18-24)
Kyoto U. DPRI & Korea NIMS (5/23)
- From Kamioka
- Yokozawa (China 5/25-28)
- Washimi (Virgo/Roma/Sardegna/Padva, 6/10 - 7/12?)
- Return Virgo's mini-ACC
- ET SPB work at Sardegna : 6/16 - 7/4 or more
Washimi (Yamaguchi -> Hiroshima -> Kohch -> Okayama, 9/8-9/30?)
Jurnal paper issue
- Non-linear ICA paper
- The playground approved, preparation toward the submit
- Schumann Resonance paper
- Long term observation, seasonal variance
- Amplified inside the mine
- Others
- O4(a+c) PEM paper
- Start to investigate the topics
- Microseism with machine learning
- 1 Hz seismic motion paper
- Start the investigation
General issue
- Commissioning
- PRFPMI
- Latest sensitivity 6.8 Mpc by adjusting the alignment offset
- Reducing the RMS of the DARM error
- Several peaks investigation
- 116 Hz noise is still mystery
- Tapping test at Saturday
- 116 Hz noise is still mystery
- PEM injection test
- Ongoing
- Cooling down the suspension
- Noise budget
- PRFPMI
Progress report
- Nishizawa, Taruya, Himemoto
- Water Newtonian noise
- Schumann Resonance
- Kaku
- Magnetic field analysis
- Murofushi
- Earthquake and GIF analysis
- Ozaki
- Nearby earthquake
- Obara
- Earthquake and suspension
- Ohashi
- Microseismic noise with machine learning
- Kume, Ueno
- Noise subtraction
- Yokozawa
- PEM investigation PR3 - PRM
- Washimi
- PEM injection