Size: 3225
Comment:
|
← Revision 3 as of 2025-06-06 15:29:51 ⇥
Size: 3284
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 15: | Line 15: |
* Slow to fast earthquake [[https://slow-to-fast-eq.org/events/2275|url]] * 9/24 - 26 |
* Talk plan * 横澤:??? * 小原:O4c中の地震とロックロス * 鷲見:シューマン共振通年観測 * 安部:シューマン共振日周変動・季節変動 * 覺:SGWBラジオメトリー |
Line 31: | Line 35: |
* 5/26~30: ET symposium @ ボローニャ [[https://indico.ego-gw.it/event/819/|url]] * 締切:3/31 * JPS meeting at hiroshima |
* KAGRA F2F @ ToyamaU * 19〜21 Aug. * JPS at Hiroshima |
Line 36: | Line 39: |
* Registration will be started soon * Slow to fast earthquake at Kochi |
* Slow to fast earthquake at Kochi [[https://slow-to-fast-eq.org/events/2275|url]] |
Line 51: | Line 52: |
* Yokozawa | |
Line 54: | Line 54: |
* 6/3 : Roma | * 6/13 : Roma |
Weekly PEM meeting
- 2025/06/06(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
General announcement
- JPS meeting registration
https://www.jps.or.jp/activities/meetings/annual/annual-index.php
- Meeting : 9/16 - 19
- Registration : 6/10 - 7/3
- Need the hotel reservation as soon as possible
- If you plan to have a presentation with PEM issue in next JPS meeting, please contact to Yokozawa and Washimi-san
- Do we need the satellite meeting?
- Talk plan
- 横澤:???
- 小原:O4c中の地震とロックロス
- 鷲見:シューマン共振通年観測
- 安部:シューマン共振日周変動・季節変動
- 覺:SGWBラジオメトリー
O4c url
Now commissioning break, Re-start 4th June 11th June end 7th Oct. 18th Nov.
- 4th - 11th June, engineering run : no observation flag, keep IFO as much as possible
- 9th - 20ht June, combination with commissioning and night silent run
- After then, basically observation run.
- Bi-weeklky VK PEM meeting
- To discuss the analysis during their measurements
- 11th June (Wed) 17:00 -
- ET cryo meeting 24th June
Meeting and Conference issue
- KAGRA F2F @ ToyamaU
- 19〜21 Aug.
- JPS at Hiroshima
- 16th - 19th Sep.
Slow to fast earthquake at Kochi url
- 24th - 26th Sep.
Other meetings url
If you have some presentations about PEM related, please contact to me.
Business travel
- To Kamioka
- From Kamioka
- Washimi (Itary, 6/7 - 7/13)
- 6/9 - 6/11 : Virgo
- 6/13 : Roma
- 6/16 - 7/9 ET SPB work at Sardegna
- 7/11 : Padova
Washimi (Yamaguchi -> Hiroshima -> Kohch -> Okayama, 9/8-9/30?)
- Washimi (Itary, 6/7 - 7/13)
Jurnal paper issue
- Non-linear ICA paper
- The playground approved, preparation toward the submit
- Schumann Resonance paper
- Long term observation, seasonal variance
- Amplified inside the mine
- Others
- O4(a+c) PEM paper
- Start to investigate the topics
- Microseism with machine learning
- 1 Hz seismic motion paper
- Start the investigation
General issue
- Commissioning
- Full calibration performed
- Maintenance day discussion
Progress report
- Nishizawa, Taruya, Himemoto
- Water Newtonian noise
- Schumann Resonance
- Kaku
- Magnetic field analysis
- Abe
- Parameter estimation of the schumann resonance
- Murofushi
- Earthquake and GIF analysis
- Obara
- Earthquake and suspension
- Ohashi
- Microseismic noise with machine learning
- Kume, Ueno
- Noise subtraction
- Yokozawa
- Noise investigation
- Washimi
- PEM injection