Differences between revisions 2 and 3
Revision 2 as of 2025-06-13 07:48:00
Size: 3950
Comment:
Revision 3 as of 2025-06-13 16:49:30
Size: 3991
Comment:
Deletions are marked like this. Additions are marked like this.
Line 130: Line 130:
  * PEM injection   * PEM injection @ Virgo
  * Microseism forecast @ Virgo

Weekly PEM meeting

General announcement

  • KAGRA F2F
    • 19th - 21nd Sep.
      • Yokozawa cannot join the F2F meeting 19th (Work for the University)
    • If you plan to have a discussion, visiting Analysis building (Difficult to enter the mine) please contact to me
  • JPS meeting registration
    • https://www.jps.or.jp/activities/meetings/annual/annual-index.php

    • Meeting : 9/16 - 19
    • Registration : 6/10 - 7/3
    • Need the hotel reservation as soon as possible
    • If you plan to have a presentation with PEM issue in next JPS meeting, please contact to Yokozawa and Washimi-san
    • Do we need the satellite meeting?
    • Talk plan
      • 横澤:O4cと気象(予定)
      • 小原:O4c中の地震とロックロス
      • 鷲見:シューマン共振通年観測
      • 安部:シューマン共振日周変動・季節変動
      • 覺:SGWBラジオメトリー
  • O4c url

    • Now commissioning break, Re-start 4th June 11th June end 7th Oct. 18th Nov.

      • 4th - 11th June, engineering run : no observation flag, keep IFO as much as possible
      • 9th - 20ht June, combination with commissioning and night silent run
        • After then, basically observation run.
  • Bi-weeklky VK PEM meeting
    • To discuss the analysis during their measurements
    • 11th June (Wed) 17:00 -
    • ET cryo meeting 24th June

Meeting and Conference issue

  • Amaldi & GR: 2025/07/14-18 @Scottish Exhibition Centre, Glasgow, UK

  • ICRC 2025: 2025/07/15-24 @Geneva (Switzerland)
  • TAUP 2025: 2025/08/24~30 @Sichuan Province of China
  • KAGRA F2F @ ToyamaU
    • registration : url

      • Deadline : 6th July.
    • 19〜21 Aug.
  • JPS at Hiroshima
    • 16th - 19th Sep.
  • Slow to fast earthquake at Kochi url

    • 24th - 26th Sep.
  • Other meetings url

If you have some presentations about PEM related, please contact to me.

Business travel

  • To Kamioka
  • From Kamioka
    • Yokozawa (Hongo, 7/13 - 19)
    • Yokozawa (ICRR young, 7/30 - 31)
    • Yokozawa (Hiroshima, Kochi, 9/15 - 27)
    • Washimi (Itary, 6/7 - 7/13)
      • 6/9 - 6/11 : Virgo
      • 6/13 : Roma
      • 6/16 - 7/9 ET SPB work at Sardegna
      • 7/11 : Padova
    • Washimi (Yamaguchi -> Hiroshima -> Kohch -> Okayama, 9/8-9/30?)

Jurnal paper issue

Details are here!

  • Non-linear ICA paper
    • The playground approved, preparation toward the submit
  • Schumann Resonance paper
    • Long term observation, seasonal variance
    • Amplified inside the mine
    • Others
  • O4(a+c) PEM paper
    • Start to investigate the topics
  • Microseism with machine learning
  • 1 Hz seismic motion paper
    • Start the investigation

General issue

  • Commissioning
    • We start the observation run
    • Several commissioning planned

Progress report

  • Nishizawa, Taruya, Himemoto
    • Water Newtonian noise
    • Schumann Resonance
  • Kaku
    • Magnetic field analysis
  • Abe
    • Parameter estimation of the schumann resonance
  • Murofushi
    • Earthquake and GIF analysis
  • Obara
    • Earthquake and suspension
  • Ohashi
    • Microseismic noise with machine learning
  • Kume, Ueno
    • Noise subtraction
  • Yokozawa
    • Noise investigation
  • Washimi
    • PEM injection @ Virgo
    • Microseism forecast @ Virgo

Place for memo

KAGRA/Subgroups/PEM/Meeting/250613/Agenda (last edited 2025-06-13 16:49:30 by tatsuki.washimi)