Differences between revisions 44 and 145 (spanning 101 versions)
Revision 44 as of 2018-12-10 12:29:39
Size: 2096
Editor: KousekiMiyo
Comment:
Revision 145 as of 2018-12-18 14:31:19
Size: 1595
Editor: KousekiMiyo
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
||<#F7BE81> '''Meeting''' ||<#F7BE81> '''General Information ''' ||<#F7BE81> '''Current Github Projects''' ||<#F7BE81> '''Documents'''||<#F7BE81> '''Link'''||
|| [[KAGRA/Subgroups/PEM/Meeting|PEM Meeting]] || [[KAGRA/Subgroups/PEM/Channels |PEM Channels]] || [[https://github.com/gw-pem/kagra-pem/projects/5|Argent Problem]] || [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9295|PEM JGWdoc Tree]] || [[https://www.icrr.u-tokyo.ac.jp/~yamat/KAGRA/bruco | Bruco Summary Page (by T.Yamamoto)]] ||
|| [[KAGRA/Commissioning|Commisioning Meeting]] || [[KAGRA/Subgroups/PEM/List |PEM Equipments]] || [[https://github.com/gw-pem/kagra-pem/projects/4|PEM Data Quality Flag]] || [[KAGRA/Subgroups/PEM/SummaryPage | Summary Page Manual]] || [[http://pem.ligo.org|LIGO PEM]] ||
|| --- || [[KAGRA/Subgroups/PEM/ADC | ADC Channel list]] || [[https://github.com/gw-pem/kagra-pem/projects/3|Monitor Characterization ]] || [[KAGRA/Subgroups/PEM/Bruco | KAGRA Bruco Manual]] || --- ||
|| --- || --- || [[KAGRA/Subgroups/PEM/TASK/OLD | Old issue]] || [[KAGRA/Subgroups/PEM/knowhow|Usefull KnowHow]] || --- ||
Line 3: Line 8:
|| '''General''' || '''Projects''' || '''Tasks''' || '''Documents'''||
|| [[KAGRA/Subgroups/PEM/Channels |KAGRA PEM Channels]] || [[KAGRA/Subgroups/PEM/Monitor | PEM Selection]] || [[KAGRA/Subgroups/PEM/TASK/ShortTerm | Short term tasks]] || [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8435|PEM plan(pdf)]] ||
|| [[KAGRA/Subgroups/PEM/List |KAGRA PEM Lists]] || [[KAGRA/Subgroups/PEM/Install | PEM Installation]] || [[KAGRA/Subgroups/PEM/TASK/PSLTasks | PSL issue]]|| [[KAGRA/Subgroups/PEM/knowhow|Usefull KnowHow]] ||
|| [[KAGRA/Subgroups/PEM/Monitors |Monitors information]] || [[KAGRA/Subgroups/PEM/XarmComm | Oct. 2018 X-arm commissioning]] || [[KAGRA/Subgroups/PEM/TASK/PSLTasks | PSL issue]] || [[KAGRA/Subgroups/PEM/TASK/PSLTasks2 | PSL issue 180828]] ||
|| [[KAGRA/Subgroups/PEM/ADC |ADC and Racks for PEM]] || [[KAGRA/Subgroups/PEM/RachCable | Rack and cabling check]] || || [[KAGRA/Subgroups/PEM/TASK/LongTerm | Long term tasks]] ||
|| [[KAGRA/Subgroups/PEM/Meeting|Meeting]] ||
|| [[KAGRA/Subgroups/PEM/SummaryPage | SummaryPage]] ||
|| [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=7529|All PEM equipments]] ||
|| [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9295|PEM JGWdoc Tree]] ||
== Definition and scope ==
Line 13: Line 10:
== General informations ==
 
 *
 *
 *
 *
== Projects ==
 1. ~+PEM is sensing system to check the detector health, noise source and h(t) data quality+~
 2. ~+__'''Selection, installation and maintenance of PEMs in KAGRA detector are the main tasks'''__ so that the data necessary for commissioning procedure are collected.+~
Line 21: Line 13:

== PEM tasks ==
 *
 *
 * [[KAGRA/Subgroups/PEM/TASK/PSLTasksOLD | PSL issue (Done)]]
 * [[KAGRA/Subgroups/PEM/TASK/TYTasks | Yokozawa issue]]
 * [[KAGRA/Subgroups/PEM/TASK/TTTasks | T.Tanaka issue]]
 * [[KAGRA/Subgroups/PEM/TASK/ShortTerm | Short term tasks]]
 * [[KAGRA/Subgroups/PEM/TASK/LongTerm | Long term tasks]]

== Documents ==
 * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8435|PEM plan(pdf)]]
 *[[KAGRA/Subgroups/PEM/knowhow|Usefull KnowHow]]
== Member list ==

Chief:
 * 横澤 孝章 Takaaki Yokozawa (ICRR)

Sub-Chiefs:
 * (To be discussed)


== Useful webpages ==
 * [[http://pem.ligo.org|LIGO PEM]]
From [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8401| JGW-E1808401]]

Physical Environment Monitors (PEM) Subgroup

Meeting

General Information

Current Github Projects

Documents

Link

PEM Meeting

PEM Channels

Argent Problem

PEM JGWdoc Tree

Bruco Summary Page (by T.Yamamoto)

Commisioning Meeting

PEM Equipments

PEM Data Quality Flag

Summary Page Manual

LIGO PEM

---

ADC Channel list

Monitor Characterization

KAGRA Bruco Manual

---

---

---

Old issue

Usefull KnowHow

---

Definition and scope

  1. PEM is sensing system to check the detector health, noise source and h(t) data quality

  2. Selection, installation and maintenance of PEMs in KAGRA detector are the main tasks so that the data necessary for commissioning procedure are collected.

From JGW-E1808401