Differences between revisions 57 and 127 (spanning 70 versions)
Revision 57 as of 2018-12-10 12:39:01
Size: 2042
Editor: KousekiMiyo
Comment:
Revision 127 as of 2018-12-18 14:19:43
Size: 1714
Editor: KousekiMiyo
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
||<#F8E0E0> '''Meeting''' ||<#F8E0E0> '''General''' ||<#F8E0E0> '''Projects''' ||<#F8E0E0> '''Tasks''' ||<#F8E0E0> '''Documents'''||<#F8E0E0> '''Link'''||
|| [[KAGRA/Subgroups/PEM/Meeting|Meeting]] || [[KAGRA/Subgroups/PEM/Channels |KAGRA PEM Channels]] || [[KAGRA/Subgroups/PEM/Monitor | PEM Selection]] || [[KAGRA/Subgroups/PEM/TASK/ShortTerm | Short term tasks]] || [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8435|PEM plan(pdf)]] || [[http://pem.ligo.org|LIGO PEM]]||
|| || [[KAGRA/Subgroups/PEM/List |KAGRA PEM Lists]] || [[KAGRA/Subgroups/PEM/Install | PEM Installation]] || [[KAGRA/Subgroups/PEM/TASK/LongTerm | Long term]]|| [[KAGRA/Subgroups/PEM/knowhow|Usefull KnowHow]] ||
|| || [[KAGRA/Subgroups/PEM/Monitors |Monitors information]] || [[KAGRA/Subgroups/PEM/XarmComm | Oct. 2018 X-arm commissioning]] || || ||
|| || [[KAGRA/Subgroups/PEM/ADC |ADC and Racks for PEM]] || [[KAGRA/Subgroups/PEM/RachCable | Rack and cabling check]] || || ||
|| || [[KAGRA/Subgroups/PEM/SummaryPage | SummaryPage]] ||
|| || [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=7529|All PEM equipments]] ||
|| || [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9295|PEM JGWdoc Tree]] ||



== PEM tasks ==
 * [[KAGRA/Subgroups/PEM/TASK/PSLTasksOLD | PSL issue (Done)]]
 * [[KAGRA/Subgroups/PEM/TASK/TYTasks | Yokozawa issue]]
 * [[KAGRA/Subgroups/PEM/TASK/TTTasks | T.Tanaka issue]]
 * [[KAGRA/Subgroups/PEM/TASK/ShortTerm | Short term tasks]]
 * [[KAGRA/Subgroups/PEM/TASK/LongTerm | Long term tasks]]

== Member list ==

Chief:
 * 横澤 孝章 Takaaki Yokozawa (ICRR)

Sub-Chiefs:
 * (To be discussed)
||<#A9D0F5> '''Meeting''' ||<#A9D0F5> '''General Information ''' ||<#A9D0F5> '''Current Github Projects''' ||<#A9D0F5> '''Documents'''||<#A9D0F5> '''Link'''||
|| [[KAGRA/Subgroups/PEM/Meeting|PEM Meeting]] || [[KAGRA/Subgroups/PEM/Channels |PEM Channels]] || [[https://github.com/gw-pem/kagra-pem/projects/5|Argent Problem]] || [[http://pem.ligo.org|LIGO PEM]]|| [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8435|PEM plan(pdf)]] ||
|| [[KAGRA/Commissioning|Commisioning Meeting]] || [[KAGRA/Subgroups/PEM/List |PEM Equipments]] || [[https://github.com/gw-pem/kagra-pem/projects/4|PEM Data Quality Flag]] || [[KAGRA/Subgroups/PEM/knowhow|Usefull KnowHow]] || -- ||
|| || [[KAGRA/Subgroups/PEM/ADC | Available ADC list]] || [[https://github.com/gw-pem/kagra-pem/projects/3|Monitor Characterization ]] || [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9295|PEM JGWdoc Tree]] || [[https://www.icrr.u-tokyo.ac.jp/~yamat/KAGRA/bruco | BrucoSummary]] ||
|| || || --- || [[KAGRA/Subgroups/PEM/SummaryPage | SummaryPageInfo]] || [[KAGRA/Subgroups/PEM/Bruco | KAGRA-Bruco]] ||
 [[KAGRA/Subgroups/PEM/PemInjection |PEM Injection]]
Line 29: Line 10:
 1. ~+Construction of 2 fixed-mirror interferometers along KAGRA, for both __'''geophysical observation'''__ and __'''KAGRA baseline monitor'''__.+~
 2. ~+Arrangement of __'''environment sensors'''__ for monitoring the tunnel, rooms, and instruments.+~
 1. ~+PEM is sensing system to check the detector health, noise source and h(t) data quality+~
 2. ~+__'''Selection, installation and maintenance of PEMs in KAGRA detector are the main tasks'''__ so that the data necessary for commissioning procedure are collected.+~
From [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8401| JGW-E1808401]]
== Others ==
 * [[KAGRA/Subgroups/PEM/TASK/OLD | Old issue]]

Physical Environment Monitors (PEM) Subgroup

Meeting

General Information

Current Github Projects

Documents

Link

PEM Meeting

PEM Channels

Argent Problem

LIGO PEM

PEM plan(pdf)

Commisioning Meeting

PEM Equipments

PEM Data Quality Flag

Usefull KnowHow

--

Available ADC list

Monitor Characterization

PEM JGWdoc Tree

BrucoSummary

---

SummaryPageInfo

KAGRA-Bruco

Definition and scope

  1. PEM is sensing system to check the detector health, noise source and h(t) data quality

  2. Selection, installation and maintenance of PEMs in KAGRA detector are the main tasks so that the data necessary for commissioning procedure are collected.

From JGW-E1808401

Others

KAGRA/Subgroups/PEM (last edited 2023-11-08 14:27:12 by tatsuki.washimi)