Differences between revisions 66 and 138 (spanning 72 versions)
Revision 66 as of 2018-12-10 12:57:42
Size: 1801
Editor: KousekiMiyo
Comment:
Revision 138 as of 2018-12-18 14:26:49
Size: 1585
Editor: KousekiMiyo
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
||<#F8E0E0> '''Meeting''' ||<#F8E0E0> '''General Information ''' ||<#F8E0E0> '''Projects''' ||<#F8E0E0> '''Tasks''' ||<#F8E0E0> '''Documents'''||<#F8E0E0> '''Link'''||
|| [[KAGRA/Subgroups/PEM/Meeting|Meeting]] || [[KAGRA/Subgroups/PEM/Channels |KAGRA PEM Channels]] || [[KAGRA/Subgroups/PEM/Monitor | PEM Selection]] || [[KAGRA/Subgroups/PEM/TASK/ShortTerm | Short term tasks]] || [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8435|PEM plan(pdf)]] || [[http://pem.ligo.org|LIGO PEM]]||
|| || [[KAGRA/Subgroups/PEM/List |KAGRA PEM Lists]] || [[KAGRA/Subgroups/PEM/Install | PEM Installation]] || [[KAGRA/Subgroups/PEM/TASK/LongTerm | Long term]]|| [[KAGRA/Subgroups/PEM/knowhow|Usefull KnowHow]] ||
|| || [[KAGRA/Subgroups/PEM/ADC | ADC Channel List]] || [[KAGRA/Subgroups/PEM/RachCable | Rack and cabling check]] || || ||
|| || -- ||[[KAGRA/Subgroups/PEM/XarmComm | Oct. 2018 X-arm commissioning]] ||
|| || || [[KAGRA/Subgroups/PEM/SummaryPage | SummaryPage]] ||
|| || [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=7529|All PEM equipments]] ||
|| || [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9295|PEM JGWdoc Tree]] ||


== Others ==
 * [[KAGRA/Subgroups/PEM/TASK/PSLTasksOLD | PSL issue (Done)]]
 * [[KAGRA/Subgroups/PEM/TASK/TYTasks | Yokozawa issue]]
 * [[KAGRA/Subgroups/PEM/TASK/TTTasks | T.Tanaka issue]]
 * [[KAGRA/Subgroups/PEM/TASK/ShortTerm | Short term tasks]]
 * [[KAGRA/Subgroups/PEM/TASK/LongTerm | Long term tasks]]
 * [[KAGRA/Subgroups/PEM/Monitors |Monitors information]]
== Member list ==

Chief:
 * 横澤 孝章 Takaaki Yokozawa (ICRR)

Sub-Chiefs:
 * (To be discussed)
||<#A9D0F5> '''Meeting''' ||<#A9D0F5> '''General Information ''' ||<#A9D0F5> '''Current Github Projects''' ||<#A9D0F5> '''Documents'''||<#A9D0F5> '''Link'''||
|| [[KAGRA/Subgroups/PEM/Meeting|PEM Meeting]] || [[KAGRA/Subgroups/PEM/Channels |PEM Channels]] || [[https://github.com/gw-pem/kagra-pem/projects/5|Argent Problem]] || [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9295|PEM JGWdoc Tree]] || [[https://www.icrr.u-tokyo.ac.jp/~yamat/KAGRA/bruco | Bruco Summary Page (by T.Yamamoto)]] ||
|| [[KAGRA/Commissioning|Commisioning Meeting]] || [[KAGRA/Subgroups/PEM/List |PEM Equipments]] || [[https://github.com/gw-pem/kagra-pem/projects/4|PEM Data Quality Flag]] || [[KAGRA/Subgroups/PEM/SummaryPage | Summary Page Manual]] || [[http://pem.ligo.org|LIGO PEM]] ||
|| || [[KAGRA/Subgroups/PEM/ADC | Available ADC list]] || [[https://github.com/gw-pem/kagra-pem/projects/3|Monitor Characterization ]] || [[KAGRA/Subgroups/PEM/Bruco | KAGRA Bruco Manual]] || --- ||
|| || --- || [[KAGRA/Subgroups/PEM/TASK/OLD | Old issue]] || [[KAGRA/Subgroups/PEM/knowhow|Usefull KnowHow]] || --- ||
Line 28: Line 9:
 1.
 2.
 1. ~+PEM is sensing system to check the detector health, noise source and h(t) data quality+~
 2. ~+__'''Selection, installation and maintenance of PEMs in KAGRA detector are the main tasks'''__ so that the data necessary for commissioning procedure are collected.+~
From [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8401| JGW-E1808401]]

Physical Environment Monitors (PEM) Subgroup

Meeting

General Information

Current Github Projects

Documents

Link

PEM Meeting

PEM Channels

Argent Problem

PEM JGWdoc Tree

Bruco Summary Page (by T.Yamamoto)

Commisioning Meeting

PEM Equipments

PEM Data Quality Flag

Summary Page Manual

LIGO PEM

Available ADC list

Monitor Characterization

KAGRA Bruco Manual

---

---

Old issue

Usefull KnowHow

---

Definition and scope

  1. PEM is sensing system to check the detector health, noise source and h(t) data quality

  2. Selection, installation and maintenance of PEMs in KAGRA detector are the main tasks so that the data necessary for commissioning procedure are collected.

From JGW-E1808401

KAGRA/Subgroups/PEM (last edited 2023-11-08 14:27:12 by tatsuki.washimi)