Differences between revisions 2 and 4 (spanning 2 versions)
Revision 2 as of 2021-02-03 19:05:16
Size: 770
Comment:
Revision 4 as of 2021-02-03 19:07:30
Size: 937
Comment:
Deletions are marked like this. Additions are marked like this.
Line 17: Line 17:
  * Relocated the connector plate.
Line 19: Line 20:
 * Wash some screws.
 * Have VIS to modify the MCi connector.
 * Check the ghost beams.
Line 22: Line 26:
 * 1  * 1 sticky mat to get the dirt off our feet.

20210203

klog

  • xxx
  • xxx

Today's activities

Workers: Akutsu, N. Sato, K. Tanaka, Nakano

  • All
    • Found that flanges of MCF and MCE chambers were not protected by white tapes although there were viton o-rings on. We protected these by white tapes.
  • MCi
    • Relocated the connector plate.
    • Attached adapter structure for black shields onto the pillars of the MCi suspension.
  • MCo
    • Found the connector plate on the MCo suspension was hard to relocate on the optical table in the chamber due to short wires from actuator coils.
  • MCe
    • Relocated the connector plate.

Next plan

  • Wash some screws.
  • Have VIS to modify the MCi connector.
  • Check the ghost beams.

Wanted!

  • 2 metal rack shelves in the clean booth (MCF and MCE); the height must be lower than 180 cm due to lower ceiling of the relevant clean booths.
  • 1 sticky mat to get the dirt off our feet.

KAGRA/Subgroups/SysInt/IMC_O4/2021-02-03 (last edited 2021-02-03 20:40:13 by TomotadaAkutsu)