Line 4: Line 4:
 * xxx
 * xxx
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15914]]
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15916]]
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15917]]
Line 10: Line 11:
  * Found that flanges of MCF and MCE chambers were not protected by white tapes although there were viton o-rings on. We protected these by white tapes.   * Found that flanges of MCF and MCE chambers were not protected by white tapes although there were viton o-rings on. We protected these by white tapes. -> Informed this to SEO already.
Line 13: Line 14:
  * Attached adapter structure for black shields onto the pillars of the MCi suspension.   * Attached adapter structures for black shields onto the pillars of the MCi suspension. (But not yet the black plates.)
Line 15: Line 16:
  * Found the connector plate on the MCo suspension was hard to relocate on the optical table in the chamber due to short wires from actuator coils.   * Found the connector plate on the MCo suspension was '''hard''' to relocate on the optical table in the chamber due to short wires from actuator coils.
Line 17: Line 18:
  * Relocated the connector plate.
  * Found the birmndy connector was loose!! Maybe VIS needs to check the other suspensions...
  * Before working, I (Akutsu) stopped the laser source for the tilt sensor; I did not know what was the proper process to stop the laser source, and I could not find any type number of this Thorlabs driver, so we could not search for the manual, so I just turned it off. ''Ashikarazu.''
Line 19: Line 23:
 * Wash some screws.
 * Have VIS to modify the MCo connector.
 * Have VIs to check whether the birndy connectors on the suspension structures are loose or not; at leaast, that for MCe is loose.
 * Have VIS to consider how to tame/fix the electric wires from the coil actuators so that they won't cross the laser beams.
 * Check the ghost beams.
Line 21: Line 30:
 * 2 metal rack shelves in the clean booth (MCF and MCE); the height must be lower than 180 cm due to lower ceiling of the relevant clean booths.  * 2 metal rack shelves in the clean booth (each for MCF and MCE); the height must be lower than 180 cm due to lower ceiling of the relevant clean booths.

20210203

klog

Today's activities

Workers: Akutsu, N. Sato, K. Tanaka, Nakano

  • All
    • Found that flanges of MCF and MCE chambers were not protected by white tapes although there were viton o-rings on. We protected these by white tapes. -> Informed this to SEO already.

  • MCi
    • Relocated the connector plate.
    • Attached adapter structures for black shields onto the pillars of the MCi suspension. (But not yet the black plates.)
  • MCo
    • Found the connector plate on the MCo suspension was hard to relocate on the optical table in the chamber due to short wires from actuator coils.

  • MCe
    • Relocated the connector plate.
    • Found the birmndy connector was loose!! Maybe VIS needs to check the other suspensions...
    • Before working, I (Akutsu) stopped the laser source for the tilt sensor; I did not know what was the proper process to stop the laser source, and I could not find any type number of this Thorlabs driver, so we could not search for the manual, so I just turned it off. Ashikarazu.

Next plan

  • Wash some screws.
  • Have VIS to modify the MCo connector.
  • Have VIs to check whether the birndy connectors on the suspension structures are loose or not; at leaast, that for MCe is loose.
  • Have VIS to consider how to tame/fix the electric wires from the coil actuators so that they won't cross the laser beams.
  • Check the ghost beams.

Wanted!

  • 2 metal rack shelves in the clean booth (each for MCF and MCE); the height must be lower than 180 cm due to lower ceiling of the relevant clean booths.
  • 1 sticky mat to get the dirt off our feet.