* Found that flanges of MCF and MCE chambers were not protected by white tapes although there were viton o-rings on. We protected these by white tapes. | * Found that flanges of MCF and MCE chambers were not protected by white tapes although there were viton o-rings on. We protected these by white tapes. -> Informed this to SEO already. |
Line 17: | Line 17: |
* Relocated the connector plate. | |
Line 19: | Line 20: |
* Wash some screws. * Have VIS to modify the MCi connector. * Check the ghost beams. |
20210203
klog
- xxx
- xxx
Today's activities
Workers: Akutsu, N. Sato, K. Tanaka, Nakano
- All
Found that flanges of MCF and MCE chambers were not protected by white tapes although there were viton o-rings on. We protected these by white tapes. -> Informed this to SEO already.
- MCi
- Relocated the connector plate.
- Attached adapter structure for black shields onto the pillars of the MCi suspension.
- MCo
- Found the connector plate on the MCo suspension was hard to relocate on the optical table in the chamber due to short wires from actuator coils.
- MCe
- Relocated the connector plate.
Next plan
- Wash some screws.
- Have VIS to modify the MCi connector.
- Check the ghost beams.
Wanted!
- 2 metal rack shelves in the clean booth (MCF and MCE); the height must be lower than 180 cm due to lower ceiling of the relevant clean booths.
- 1 sticky mat to get the dirt off our feet.