Differences between revisions 3 and 5 (spanning 2 versions)
Revision 3 as of 2021-02-03 19:06:31
Size: 810
Comment:
Revision 5 as of 2021-02-03 19:10:33
Size: 970
Comment:
Deletions are marked like this. Additions are marked like this.
Line 10: Line 10:
  * Found that flanges of MCF and MCE chambers were not protected by white tapes although there were viton o-rings on. We protected these by white tapes.   * Found that flanges of MCF and MCE chambers were not protected by white tapes although there were viton o-rings on. We protected these by white tapes. -> Informed this to SEO already.
Line 17: Line 17:
  * Relocated the connector plate.
Line 19: Line 20:
 * Wash some screws.
 * Have VIS to modify the MCi connector.
 * Check the ghost beams.

20210203

klog

  • xxx
  • xxx

Today's activities

Workers: Akutsu, N. Sato, K. Tanaka, Nakano

  • All
    • Found that flanges of MCF and MCE chambers were not protected by white tapes although there were viton o-rings on. We protected these by white tapes. -> Informed this to SEO already.

  • MCi
    • Relocated the connector plate.
    • Attached adapter structure for black shields onto the pillars of the MCi suspension.
  • MCo
    • Found the connector plate on the MCo suspension was hard to relocate on the optical table in the chamber due to short wires from actuator coils.
  • MCe
    • Relocated the connector plate.

Next plan

  • Wash some screws.
  • Have VIS to modify the MCi connector.
  • Check the ghost beams.

Wanted!

  • 2 metal rack shelves in the clean booth (MCF and MCE); the height must be lower than 180 cm due to lower ceiling of the relevant clean booths.
  • 1 sticky mat to get the dirt off our feet.