Size: 312
Comment:
|
Size: 910
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
Infrastructure | = Infrastructure = == Overview of the underground labyrinth == . [[attachment:Rabyrinth_100806.png|{{attachment:Rabyrinth_100806.png|alt text|width=750}}]] |
Line 3: | Line 5: |
* Overview of the underground labyrinth | == Detailed view of each experimental hall == === Center room === . [[attachment:CenterRoom_100806.png]] . Layout planned by each sub-groups . [[attachment:Laser_Room_100813.pdf|Laser group]] . [[attachment:layout100812.pdf|Vacuum group]] . IFO group |
Line 5: | Line 13: |
* Detailed view of each experimental hall | === End rooms === . [[attachment:EndRoom_100806.png]] |
Line 7: | Line 16: |
* Life lines | === Tunnel === . [[attachment:Tunnel_100806.png]] . [[attachment:Tunnel_Ry_100818.pdf]] . [[attachment:tunnel4_4_100818.mcd.pdf]] |
Line 9: | Line 21: |
* AC Power Supply |
== Life-lines == * [[PowerSupply|AC Power Supply]] |
Line 13: | Line 25: |
* Network - TCP/IP network - For Digital Control - GPS and timing system |
* Network * TCP/IP network * For Digital Control * GPS and timing system |
Line 20: | Line 32: |
* | == Security & Administration == |
Line 22: | Line 34: |
* * Cleanliness |
== Cleanliness == * Air intake from out-of-mine |
Infrastructure
Overview of the underground labyrinth
Detailed view of each experimental hall
Center room
- Layout planned by each sub-groups
- IFO group
End rooms
Tunnel
Life-lines
- Water for cooling
- Network
- TCP/IP network
- For Digital Control
- GPS and timing system
- Telehone (IP phone??)
Security & Administration
Cleanliness
- Air intake from out-of-mine