Differences between revisions 1 and 53 (spanning 52 versions)
Revision 1 as of 2010-08-06 23:37:57
Size: 312
Comment:
Revision 53 as of 2010-12-02 00:17:35
Size: 1374
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
Infrastructure = Infrastructure =
== Overview of the underground labyrinth ==
 . [[attachment:Rabyrinth_100806.png|{{attachment:Rabyrinth_100806.png|alt text|width=750}}]]
Line 3: Line 5:
* Overview of the underground labyrinth == Detailed view of each experimental hall ==
=== Center room ===
 . [[attachment:CenterRoom_100806.png]]
 . Layout planned by each sub-groups
  . [[attachment:Laser_Room_100813.pdf|Laser group]]
  . [[attachment:layout100812.pdf|Vacuum group]]
  . IFO group
Line 5: Line 13:
* Detailed view of each experimental hall === End rooms ===
 . [[attachment:EndRoom_100806.png]]
Line 7: Line 16:
* Life lines === Tunnel ===
 . [[attachment:Tunnel_100806.png]]
 . [[attachment:Tunnel_Ry_100921.pdf]]
 . [[attachment:tunnel4_4_100818.mcd.pdf]]
Line 9: Line 21:
 * AC Power Supply == Life-lines ==
 * [[PowerSupply|AC Power Supply]]
 * Water for cooling
  . [[attachment:Laser_mio_101012.pdf|Laser]]
Line 11: Line 26:
 * Water for cooling

* Network
   - TCP/IP network
   - For Digital Control
   - GPS and timing system
 * Network [Miyoki]
  * TCP/IP network 
  * For Digital Control 
  * GPS and timing system
Line 20: Line 33:
* == Security & Administration ==
Line 22: Line 35:
* == Cleanliness ==
 * Air intake from out-of-mine [Uchiyama]
 * [[attachment:air.pdf|Air ventilation estimation (in Japanese)]]
Line 24: Line 39:
* Cleanliness == Air Conditioning ==
 * [[attachment:humidity_control.pdf|Requirements for humidity]]
 * Basic Plan [Tatsumi]

== GPS antenna ==
 * GPS antenna location [Tatsumi, Aso]
   . [[attachment:GPS_antenna_requirements.pdf|Selection of candidates]] (in Japanese)
 * Link to [[LCGT/subgroup/ifo/digital/Timing|Timing System]]

Infrastructure

Overview of the underground labyrinth

  • alt text

Detailed view of each experimental hall

Center room

End rooms

Tunnel

Life-lines

  • AC Power Supply

  • Water for cooling
  • Network [Miyoki]
    • TCP/IP network
    • For Digital Control
    • GPS and timing system
  • Telehone (IP phone??)

Security & Administration

Cleanliness

Air Conditioning

GPS antenna

KAGRA/Subgroups/TUN (last edited 2012-06-06 17:42:10 by OsamuMiyakawa)