Differences between revisions 26 and 53 (spanning 27 versions)
Revision 26 as of 2010-08-20 12:07:33
Size: 729
Comment:
Revision 53 as of 2010-12-02 00:17:35
Size: 1374
Comment:
Deletions are marked like this. Additions are marked like this.
Line 6: Line 6:
=== Center room ===
Line 7: Line 8:
 . [[attachment:EndRoom_100806.png]]  . Layout planned by each sub-groups
  . [[attachment:Laser_Room_100813.pdf|Laser group]]
  . [[attachment:layout100812.pdf|Vacuum group]]
  . IFO group

=== End rooms ===
 . [[attachment:EndRoom_100806.png]]

=== Tunnel ===
Line 9: Line 18:
   . Layout planning / Space occupation (request to Uchiyama)
  . [[attachment:Laser_Room_100813.pdf|Laser booth]]
 . [[attachment:Tunnel_Ry_100921.pdf]]
 . [[attachment:tunnel4_4_100818.mcd.pdf]]
Line 13: Line 21:
== Life lines == == Life-lines ==
Line 16: Line 24:
  . [[attachment:Laser_mio_101012.pdf|Laser]]
Line 17: Line 26:
 * Network  * Network [Miyoki]
Line 27: Line 36:
 * Air intake from out-of-mine  * Air intake from out-of-mine [Uchiyama]
 * [[attachment:air.pdf|Air ventilation estimation (in Japanese)]]

== Air Conditioning ==
 * [[attachment:humidity_control.pdf|Requirements for humidity]]
 * Basic Plan [Tatsumi]

== GPS antenna ==
 * GPS antenna location [Tatsumi, Aso]
   . [[attachment:GPS_antenna_requirements.pdf|Selection of candidates]] (in Japanese)
 * Link to [[LCGT/subgroup/ifo/digital/Timing|Timing System]]

Infrastructure

Overview of the underground labyrinth

  • alt text

Detailed view of each experimental hall

Center room

End rooms

Tunnel

Life-lines

  • AC Power Supply

  • Water for cooling
  • Network [Miyoki]
    • TCP/IP network
    • For Digital Control
    • GPS and timing system
  • Telehone (IP phone??)

Security & Administration

Cleanliness

Air Conditioning

GPS antenna

KAGRA/Subgroups/TUN (last edited 2012-06-06 17:42:10 by OsamuMiyakawa)